CPV Fairview Energy Center
2862 William Penn Avenue, Johnstown, PA 15909Plant Summary Information
CPV Fairview Energy Center is ranked #19 out of 257 power plants in Pennsylvania in terms of total annual net electricity generation.
CPV Fairview Energy Center is comprised of 3 generators and generated 1.0 TWh during the 3-month period between May 2026 to August 2026.
| Plant Name | CPV Fairview Energy Center |
|---|---|
| Utility Name | CPV Fairview, LLC |
| Location | Cambria County, PA |
| Initial Operation Date | December 2019 |
| Last Update | Aug 2026 |
| Annual Generation | 4.6 TWh |
| Annual Consumption | 35.6 M MMBtu |
| Ranked #242 out of 13,301 Power Plants Nationwide | |
| Ranked #121 out of 2,218 Natural Gas Power Plants Nationwide | |
| Ranked #19 out of 257 Pennsylvania Power Plants | |
| Ranked #15 out of 77 Pennsylvania Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of CPV Fairview Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CPV Fairview Energy Center.
Monthly Net Generation for CPV Fairview Energy Center
Monthly Plant Fuel Consumption for CPV Fairview Energy Center
CPV Fairview Energy Center Details
| Summary Information | |
|---|---|
| Plant Name | CPV Fairview Energy Center (60589) |
| Plant Address | 2862 William Penn Avenue, Johnstown, PA 15909 |
| Utility | CPV Fairview, LLC (60350) |
| Latitude, Longitude | 40.412, -78.855 |
| Generation Dates on File | Dec 2019 to Aug 2026 |
| Initial Operation Date | December 2019 |
| Annual Generation | 4.6 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EWG 20170502-5152 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Cambria Somerset Authority |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pennsylvania Electric Co (14711) PA |
| Grid Voltage | 500.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | TEXAS EASTERN TRANSMISSION LP |
| Natural Gas Storage | No |
Generator GEN1 Details Operating December 2019
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | Fairvwec |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | Fairvwec |
| Nameplate Capacity | 372 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 332.7 MW |
| Winter Capacity | 351.2 MW |
| Minimum Load | 115 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2019 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Other Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | NG / OG |
|---|---|
Generator GEN2 Details OA December 2019
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| RTO ISO LMP Node Designation | Fairvwec |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | Fairvewec |
| Nameplate Capacity | 372 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 331.5 MW |
| Winter Capacity | 352.1 MW |
| Minimum Load | 115 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | OA |
| First Operation Date | December 2019 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Other Gas |
| Startup Source | Natural Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | No |
| Multifuel Details | |
| Cofire Energy Source | NG / OG |
|---|---|
Generator GEN3 Details Operating December 2019
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 453 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 392.4 MW |
| Winter Capacity | 391.4 MW |
| Minimum Load | 115 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2019 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas / Other Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
CPV Fairview Energy Center Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #111 | Pasadena Cogeneration | Pasadena, TX | 5.0 TWh |
| #112 | Brandy Branch | Baldwin, FL | 4.8 TWh |
| #113 | Jasper | Hardeeville, SC | 4.8 TWh |
| #114 | Formosa Utility Venture Ltd | Point Comfort, TX | 4.9 TWh |
| #115 | Tenaska Frontier Generation Station | Shiro, TX | 4.8 TWh |
| #116 | Caledonia | Steens, MS | 4.8 TWh |
| #117 | St. Charles Power Station (LA) | La Place, LA | 4.7 TWh |
| #118 | Potomac Energy Center, LLC | Leesburg, VA | 4.7 TWh |
| #119 | CPV Valley Energy Center | Wawayanda, NY | 4.6 TWh |
| #120 | Rio Nogales Power Project | Seguin, TX | 4.6 TWh |
| #122 | Lowman Energy Center | Leroy, AL | 4.6 TWh |
| #123 | Lower Mount Bethel Energy | Bangor, PA | 4.5 TWh |
| #124 | Buck | Salisbury, NC | 4.5 TWh |
| #125 | Intermountain Power Project | Delta, UT | 5.5 TWh |
| #126 | Key | Brandywine, MD | 4.5 TWh |
| #127 | Ouachita | Sterlington, LA | 4.4 TWh |
| #128 | Fremont Energy Center | Fremont, OH | 4.4 TWh |
| #129 | Channel Energy Center LLC | Pasadena, TX | 4.3 TWh |
| #130 | Tenaska Gateway Generating Station | Mt. Enterprise, TX | 4.3 TWh |
| #131 | Oneta Energy Center | Broken Arrow, OK | 4.3 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding CPV Fairview Energy Center.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Allegheny Ridge Wind Farm | Portage, PA | 179.7 GWh | 14.6 mi |
| Armstrong | Shelocta, PA | 1.2 TWh | 30.4 mi |
| Cambria Wind LLC | Sidman, PA | 128.2 GWh | 11.4 mi |
| Chestnut Flats Wind Farm | Altoona, PA | 90.3 GWh | 21.3 mi |
| Colver Green Energy | Colver, PA | 724.4 GWh | 10.1 mi |
| Conemaugh | New Florence, PA | 4.2 TWh | 11 mi |
| Conemaugh Hydro Plant | Saltsburg, PA | 43.3 GWh | 27.1 mi |
| CPV Maple Hill Solar | Portage, PA | 162.7 GWh | 11.8 mi |
| CPV Rogue's Wind, LLC | Patton, PA | 34.0 GWh | 22.2 mi |
| Ebensburg Power | Ebensburg, PA | 307.0 GWh | 6.4 mi |
| Forward Windpower LLC | Berlin, PA | 54.8 GWh | 22.6 mi |
| Glades Pike Generation Plant | Somerset, PA | 8.4 GWh | 29.7 mi |
| Highland North Wind Farm | Sidman, PA | 163.9 GWh | 11.2 mi |
| Indiana University of Pennsylvania | Indiana, PA | 21.4 GWh | 21.2 mi |
| Keystone | Shelocta, PA | 4.0 TWh | 30.8 mi |
| North Allegheny Windpower Project | Lilly, PA | 202.6 GWh | 16.5 mi |
| Patton Wind Farm | Patton, PA | 95.8 GWh | 17.3 mi |
| Seward (PA) | New Florence, PA | 3.1 TWh | 9.4 mi |
| Spring Lane | Ligonier, PA | 18.5 GWh | 29.1 mi |
| Stony Creek Wind Farm LLC | Berlin, PA | 144.2 GWh | 26.4 mi |