Smithfield 3

9900 S 4100 W, Milford, UT 84751

Plant Summary Information

Smithfield 3 is ranked #50 out of 56 solar farms in Utah in terms of total annual net electricity generation.

Smithfield 3 generated 1.0 GWh during the 3-month period between September 2025 to December 2025.

Plant NameSmithfield 3
Utility NameAltus Power America Management, LLC
LocationBeaver County, UT
Initial Operation DateJuly 2023
Last Update Dec 2025
Annual Generation 5.6 GWh
Annual Consumption 20.0 k MMBtu
Ranked #8,027 out of 13,081 Power Plants Nationwide
Ranked #3,360 out of 7,015 Solar Power Plants Nationwide
Ranked #96 out of 120 Utah Power Plants
Ranked #50 out of 56 Utah Solar Power Plants
Fuel Types Solar
Previous Operator Greenbacker Renewable Energy Corporation (2022 to 2024)
Altus Power America Management, LLC (2025 to 2025)

Map of Smithfield 3

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Smithfield 3.

Create Your Account Today

Monthly Net Generation for Smithfield 3

Monthly Plant Fuel Consumption for Smithfield 3

Smithfield 3 Details

Summary Information
Plant NameSmithfield 3 (66147)
Plant Address9900 S 4100 W, Milford, UT 84751
UtilityAltus Power America Management, LLC (60281)
Latitude, Longitude38.2245, -113.10542
Generation Dates on FileAug 2023 to Dec 2025
Initial Operation DateJuly 2023
Annual Generation 5.6 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket NumberQF23-484-000
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityWestern Area Power Administration - Rocky Mountain Region (WACM)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerPacifiCorp (14354) UT
Grid Voltage 12.50 kV
Energy StorageNo

Generator 801 Details Operating July 2023

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity2 MW
Summer Capacity2 MW
Winter Capacity2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJuly 2023
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Single Axis TrackingYes
Tilt Angle52
DC Net Capacity2.7 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Smithfield 3 Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#3350Danell Bros IncHanford, CA5.6 GWh
#3351Kearsarge SKSC2 LLCSouth Kingstown, RI5.6 GWh
#3352Norfolk Landfill Solar ProjectNorfolk, CT5.6 GWh
#3353Cortez Solar 1, LLCCortez, CO5.6 GWh
#3354Avon Solar Farm LLCAvon, NY5.6 GWh
#3355Ararat Rock Solar, LLCMount Airy, NC5.6 GWh
#3356BWC Rams Horn Channel LLCBeverly, MA5.6 GWh
#3357Progress Solar III, LLCMaxton, NC5.6 GWh
#3358Pivot Niagara SolarLewiston, NY5.6 GWh
#3359Kearsarge Ludlow LLCLudlow, MA5.6 GWh
#3361Dissigno Healdsburg FPV, LLCHealdsburg, CA5.6 GWh
#3362Easton CSG 1 LLCEaston, ME5.6 GWh
#3363Lenox RenewablesCanastota, NY5.6 GWh
#3364USS Cogburn Solar LLC (CSG)Greeley, CO5.6 GWh
#3365WilbrahamWilbraham, MA5.6 GWh
#3366Springfield Solar PVSpringfield, MA5.5 GWh
#3367Founders Homestead Farms SolarPortsmouth, RI5.5 GWh
#3368Amazon TUS2Tucson, AZ5.5 GWh
#3369Old Catawba PV 1Claremont, NC5.5 GWh
#3370Anoka County MN CONXRamsey, MN5.5 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Smithfield 3.

Plant NamePlant LocationAnnual GenerationDistance
Appaloosa Solar ICedar City, UT200.8 GWh26.6 mi
BlundellMilford, UT271.2 GWh22.8 mi
Buckhorn Solar PlantParagonah, UT5.5 GWh24.6 mi
Cedar Valley Solar PlantCedar City, UT6.2 GWh28.8 mi
Escalante Solar I, LLCMilford, UT216.9 GWh21.1 mi
Escalante Solar II, LLCMilford, UT217.5 GWh19.5 mi
Escalante Solar III, LLCMilford, UT214.0 GWh19.9 mi
Granite Peak Solar PlantMilford, UT6.1 GWh13.8 mi
Greenville Solar PlantMilford, UT3.3 GWh20.2 mi
Laho Solar PlantMilford, UT6.4 GWh6 mi
Milford 2Milford, UT6.9 GWh12.9 mi
Milford Flat Solar PlantMilford, UT6.4 GWh7 mi
Milford Solar 1Milford, UT263.1 GWh19 mi
Milford Wind Corridor I LLCMilford, UT368.3 GWh23.4 mi
Milford Wind Corridor Stage II LLCMilford, UT175.7 GWh26.7 mi
Smithfield 1Milford, UT12.8 GWh12.8 mi
South Milford Solar PlantMilford, UT7.6 GWh6.6 mi
Thermo No 1Milford, UT56.3 GWh6.5 mi
Three Peaks PowerCedar City, UT228.7 GWh27.5 mi
Utah Red Hills Renewable Energy ParkParowan, UT207.9 GWh26 mi