Kayenta Solar Project
Adjacent to US Route 163, Kayenta, AZ 86504Plant Summary Information
Kayenta Solar Project is ranked #33 out of 113 solar farms in Arizona in terms of total annual net electricity generation.
Kayenta Solar Project generated 26.0 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Kayenta Solar Project |
|---|---|
| Utility Name | NGI-Kayenta Solar Lessor I, LLC |
| Location | Navajo County, AZ |
| Initial Operation Date | May 2017 |
| Last Update | Mar 2026 |
| Annual Generation | 121.7 GWh |
| Annual Consumption | 451.6 k MMBtu |
| Ranked #3,207 out of 12,332 Power Plants Nationwide | |
| Ranked #769 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #69 out of 166 Arizona Power Plants | |
| Ranked #33 out of 113 Arizona Solar Power Plants | |
| Fuel Types | Solar |
Map of Kayenta Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Kayenta Solar Project.
Monthly Net Generation for Kayenta Solar Project
Monthly Plant Fuel Consumption for Kayenta Solar Project
Kayenta Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Kayenta Solar Project (61268) |
| Plant Address | Adjacent to US Route 163, Kayenta, AZ 86504 |
| Utility | NGI-Kayenta Solar Lessor I, LLC (60879) |
| Latitude, Longitude | 36.77194, -110.26389 |
| Generation Dates on File | May 2017 to Mar 2026 |
| Initial Operation Date | May 2017 |
| Annual Generation | 121.7 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Western Area Power Administration - Desert Southwest Region (WALC) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Navajo Tribal Utility Authority (13314) AZ |
| Grid Voltage | 400.00 kV / 24.90 kV / 69.00 kV |
| Energy Storage | No |
Generator PV1 Details Operating May 2017
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 27.3 MW |
| Summer Capacity | 27.3 MW |
| Winter Capacity | 27.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2017 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 90 |
| Tilt Angle | 50 |
| DC Net Capacity | 37.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator PV2 Details Operating August 2019
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 28 MW |
| Summer Capacity | 28 MW |
| Winter Capacity | 28 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 2019 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 90 |
| Tilt Angle | 50 |
| DC Net Capacity | 38.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Kayenta Solar Project Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #759 | Coral Farms Solar Energy Center | Florahome, FL | 125.4 GWh |
| #760 | RE Camelot LLC | Mojave, CA | 125.1 GWh |
| #761 | Hawtree Solar | Warrenton, NC | 124.7 GWh |
| #762 | Meherrin Solar | Skippers, VA | 124.4 GWh |
| #763 | Laurel Oaks Solar | Plant City, FL | 124.1 GWh |
| #764 | Wheatsborough Solar | Bellevue, OH | 123.5 GWh |
| #765 | Macho Springs | Deming, NM | 122.7 GWh |
| #766 | Otter Creek Solar | Chase City, VA | 122.5 GWh |
| #767 | Conetoe II Solar, LLC | Conetoe, NC | 122.4 GWh |
| #768 | Alafia Solar | Mulberry, FL | 121.9 GWh |
| #770 | Hecate Energy Beacon Solar 3 | Cantil, CA | 121.6 GWh |
| #771 | Grange Hall Solar | Wimauma, FL | 121.5 GWh |
| #772 | OE_GA3 | Camilla, GA | 121.3 GWh |
| #773 | Northern Preserve Solar | Glen St. Mary, FL | 121.3 GWh |
| #774 | Bonnybrooke PV | Florence, AZ | 121.2 GWh |
| #775 | Farmington Solar | Farmington, ME | 121.2 GWh |
| #776 | Jicarilla Solar 1 LLC | Dulce, NM | 116.9 GWh |
| #777 | Bedford Solar (Dominion) | Chesapeake, VA | 120.8 GWh |
| #778 | Wimauma Solar and Battery Storage | Wimauma, FL | 117.8 GWh |
| #779 | Black Hollow Sun | Auit, CO | 120.5 GWh |
Nearby Power Plants
Below are closest 15 power plants surrounding Kayenta Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Babbitt Ranch Energy Center | Flagstaff, AZ | 513.4 GWh | 119.4 mi |
| Boulder | Boulder, UT | 20.4 GWh | 105.8 mi |
| Cholla | Joseph City, AZ | 1.3 TWh | 126.6 mi |
| City of Gallup Solar | Gallup, NM | 9.0 GWh | 119.7 mi |
| Cortez Solar 1, LLC | Cortez, CO | 5.4 GWh | 104.2 mi |
| Cortez Solar 2, LLC | Cortez, CO | 9.5 GWh | 100.1 mi |
| Cortez Solar 3, LLC | Cortez, CO | 4.5 GWh | 99.9 mi |
| Dolores Canyon Solar | Cahone, CO | 84.0 GWh | 105.1 mi |
| Four Corners | Fruitland, NM | 9.5 TWh | 98.9 mi |
| Glen Canyon Dam | Page, AZ | 2.6 TWh | 68.4 mi |
| Latigo Wind Park | Monticello, UT | 143.9 GWh | 91.4 mi |
| Red Mesa Solar Project | Red Mesa, UT | 186.1 GWh | 52.9 mi |
| San Juan Solar I | Kirtland, NM | 507.7 GWh | 105.9 mi |
| SMPA Solar 1 Community Solar | Bedrock, CO | 1.7 GWh | 131.6 mi |
| Towaoc | Cortez, CO | 9.8 GWh | 103.6 mi |