Drift Sand Wind Project LLC
852 County Road 1510, Rush Springs, OK 73082Plant Summary Information
Drift Sand Wind Project LLC is ranked #52 out of 71 wind farms in Oklahoma in terms of total annual net electricity generation.
Drift Sand Wind Project LLC generated 91.6 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Drift Sand Wind Project LLC |
|---|---|
| Utility Name | Enel Green Power NA, Inc. |
| Location | Grady County, OK |
| Initial Operation Date | December 2016 |
| Last Update | Feb 2026 |
| Annual Generation | 341.7 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,831 out of 12,637 Power Plants Nationwide | |
| Ranked #545 out of 1,376 Wind Power Plants Nationwide | |
| Ranked #77 out of 137 Oklahoma Power Plants | |
| Ranked #52 out of 71 Oklahoma Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operators |
E ON Climate Renewables N America LLC (2013 to 2013) Tradewind Energy, Inc. (2014 to 2014) Enel Green Power NA, Inc. (2015 to 2024) |
Map of Drift Sand Wind Project LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Drift Sand Wind Project LLC.
Monthly Net Generation for Drift Sand Wind Project LLC
Monthly Plant Fuel Consumption for Drift Sand Wind Project LLC
Drift Sand Wind Project LLC Details
| Summary Information | |
|---|---|
| Plant Name | Drift Sand Wind Project LLC (59065) |
| Plant Address | 852 County Road 1510, Rush Springs, OK 73082 |
| Utility | Enel Green Power NA, Inc. (59380) |
| Latitude, Longitude | 34.82778, -97.95722 |
| Generation Dates on File | Oct 2016 to Feb 2026 |
| Initial Operation Date | December 2016 |
| Annual Generation | 341.7 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Public Service Co of Oklahoma (15474) OK |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator WT1 Details Operating December 2016
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 108 MW |
| Summer Capacity | 108 MW |
| Winter Capacity | 108 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2016 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 54 |
| Turbine Details | |
| Number Of Turbines | 54 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V110-2.0 |
| Design Wind Speed | 12 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 262 |
Drift Sand Wind Project LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #535 | Buffalo Gap 2 Wind Farm | Merkel, TX | 350.4 GWh |
| #536 | Tule Wind LLC | Boulevard, CA | 348.4 GWh |
| #537 | Northern Wind | Lake Wilson, MN | 348.0 GWh |
| #538 | Hopkins Ridge Wind | Dayton, WA | 347.5 GWh |
| #539 | Mesquite Wind Power LLC | Abilene, TX | 347.1 GWh |
| #540 | Cedro Hill Wind LLC | Bruni, TX | 344.5 GWh |
| #541 | Beaver Creek Wind Facility | Big Timber, MT | 344.4 GWh |
| #542 | Mower County Wind Energy Center | Grand Meadow, MN | 343.3 GWh |
| #543 | Bent Tree Wind Farm Phase 1 | Hartland, MN | 343.0 GWh |
| #544 | Oakfield Wind Project | City of Oakfield, ME | 342.4 GWh |
| #546 | Gratiot Farms Wind Project | Carson City, MI | 341.1 GWh |
| #547 | Midland Wind | Kewane, IL | 340.9 GWh |
| #548 | Sweetwater Wind 2 LLC | Sweetwater, TX | 340.6 GWh |
| #549 | Bishop Hill II Wind Farm | Cambridge, IL | 339.9 GWh |
| #550 | Cameron Wind 1 LLC | Rio Hondo, TX | 337.6 GWh |
| #551 | Inadale Wind Farm LLC Hybrid | Roscoe, TX | 335.1 GWh |
| #552 | Papalote Creek I LLC | Taft, TX | 335.8 GWh |
| #553 | Rugby Wind Power Project | Barton, ND | 335.4 GWh |
| #554 | Wheatridge East Wind | Lexington, OR | 335.3 GWh |
| #555 | Spinning Spur Wind LLC | Vegas, TX | 334.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Drift Sand Wind Project LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Anadarko Plant | Anadarko, OK | 537.6 GWh | 23.5 mi |
| Blue Canyon Windpower | Carnegie, OK | 39.6 GWh | 35.2 mi |
| Blue Canyon Windpower II | Carnegie, OK | 543.1 GWh | 36.9 mi |
| Blue Canyon Windpower V LLC | Carnegie, OK | 262.8 GWh | 28.1 mi |
| Blue Canyon Windpower VI LLC | Carnegie, OK | 163.5 GWh | 34.6 mi |
| Caddo Wind | Apache, OK | 991.0 GWh | 26.5 mi |
| Comanche (OK) | Lawton, OK | 500.6 GWh | 28.7 mi |
| Cyril | Cyril, OK | 8.5 GWh | 16.1 mi |
| McClain Energy Facility | Newcastle, OK | 1.7 TWh | 38.5 mi |
| Minco Wind I, LLC | Minco, OK | 304.9 GWh | 31.3 mi |
| Minco Wind II, LLC | Minco, OK | 251.0 GWh | 35 mi |
| Minco Wind III, LLC | Minco, OK | 362.5 GWh | 39.7 mi |
| Pine Ridge | Apache, OK | 5.1 GWh | 30.5 mi |
| Redbed Plains Wind Farm | Tuttle, OK | 375.1 GWh | 32.5 mi |
| Rush Springs Wind | Marlow, OK | 919.9 GWh | 12.4 mi |
| Southwestern | Anadarko, OK | 779.4 GWh | 29.3 mi |
| Tuttle | Tuttle, OK | 3.6 GWh | 31 mi |
| WFEC GenCo LLC | Anadarko, OK | 83.7 GWh | 23.3 mi |
| White Rock East Wind Project | Anadarko, OK | 705.6 GWh | 16.4 mi |
| White Rock West Wind Project | Anadarko, OK | 369.5 GWh | 19.5 mi |