Anderson
6035 Park Road, Anderson, IN 46011Plant Summary Information
Anderson is ranked #26 out of 46 natural gas power plants in Indiana in terms of total annual net electricity generation.
Anderson is comprised of 3 generators and generated 21.9 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Anderson |
|---|---|
| Utility Name | Indiana Municipal Power Agency |
| Location | Madison County, IN |
| Initial Operation Date | June 1992 |
| Last Update | Dec 2025 |
| Annual Generation | 92.3 GWh |
| Annual Consumption | 2.2 M MMBtu |
| Ranked #3,592 out of 13,081 Power Plants Nationwide | |
| Ranked #937 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #81 out of 218 Indiana Power Plants | |
| Ranked #26 out of 46 Indiana Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 99.8% |
Map of Anderson
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Anderson.
Monthly Net Generation for Anderson
Monthly Plant Fuel Consumption for Anderson
Anderson Details
| Summary Information | |
|---|---|
| Plant Name | Anderson (7336) |
| Plant Address | 6035 Park Road, Anderson, IN 46011 |
| Utility | Indiana Municipal Power Agency (9234) |
| Latitude, Longitude | 40.0529, -85.7389 |
| Generation Dates on File | Jan 2001 to Dec 2025 |
| Initial Operation Date | June 1992 |
| Annual Generation | 92.3 GWh |
| Fuel Types | Natural Gas : 99.8% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Indiana Michigan Power Co (9324) IN |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | Other - See pipeline notes. |
| Pipeline Name | PANHANDLE EASTERN PIPELINE COMPANY |
| Pipeline Notes | The Local Distribution Company is Vectren |
| Natural Gas Storage | No |
Generator ACT1 Details Operating June 1992
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 32419341 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 32419341 |
| Nameplate Capacity | 41.4 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 34 MW |
| Winter Capacity | 42 MW |
| Minimum Load | 17 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 1992 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 34 MW |
| Net Winter Capacity With Natural Gas | 42 MW |
| Net Summer Capacity With Oil | 34 MW |
| Net Winter Capacity With Oil | 42 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator ACT2 Details Operating June 1992
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 32419343 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 32419343 |
| Nameplate Capacity | 41.4 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 34 MW |
| Winter Capacity | 42 MW |
| Minimum Load | 17 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 1992 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 34 MW |
| Net Winter Capacity With Natural Gas | 42 MW |
| Net Summer Capacity With Oil | 34 MW |
| Net Winter Capacity With Oil | 42 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator ACT3 Details Operating June 2004
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 34886963 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 34886963 |
| Nameplate Capacity | 85.9 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 72 MW |
| Winter Capacity | 90 MW |
| Minimum Load | 36 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2004 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 72 MW |
| Net Winter Capacity With Natural Gas | 90 MW |
| Net Summer Capacity With Oil | 72 MW |
| Net Winter Capacity With Oil | 90 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Anderson Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #927 | Georgia-Pacific Consr Prods LP-Naheola | Pennington, AL | 436.4 GWh |
| #928 | Central Utility Plant at White Oak | Silver Spring, MD | 96.0 GWh |
| #929 | Lakefield Junction | Trimont, MN | 94.6 GWh |
| #930 | Indeck Silver Springs Energy Center | Silver Springs, NY | 94.2 GWh |
| #931 | Hartwell Energy Facility | Hartwell, GA | 96.7 GWh |
| #932 | Bacliff | Bacliff, TX | 93.4 GWh |
| #933 | Essex | Essex, MO | 92.9 GWh |
| #934 | North 1st | Brooklyn, NY | 92.8 GWh |
| #935 | Cambridge CT Hybrid | Cambridge, MN | 100.7 GWh |
| #936 | PCA, Filer City Mill | Filer City, MI | 92.2 GWh |
| #938 | Pinelawn Power LLC | West Babylon, NY | 93.5 GWh |
| #939 | D G Hunter | Alexandria, LA | 90.6 GWh |
| #940 | Bridgeport Fuel Cell, LLC | Bridgeport, CT | 90.4 GWh |
| #941 | Terry Bundy Generating Station | Lincoln, NE | 122.8 GWh |
| #942 | West Marinette | Peshtigo, WI | 90.3 GWh |
| #943 | MJMEUC Generating Station #1 | Laddonia, MO | 90.1 GWh |
| #944 | Four Corners | Fruitland, NM | 9.4 TWh |
| #945 | Elk Hills Cogen | Tupman, CA | 88.5 GWh |
| #946 | Gilbert | Milford, NJ | 88.3 GWh |
| #947 | DeBary | DeBary, FL | 103.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Anderson.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Anderson 3 | Anderson, IN | 16.3 GWh | 5.5 mi |
| Anderson 4 | Anderson, IN | 14.5 GWh | 5.8 mi |
| Anderson 5 | Anderson, IN | 5.8 GWh | 6.1 mi |
| Anderson 6 | Anderson, IN | 13.3 GWh | 2.3 mi |
| Greenfield Solar Park | Greenfield, IN | 4.8 GWh | 18.4 mi |
| Henry County | New Castle, IN | 274.9 GWh | 14.2 mi |
| IMPA Anderson Solar Park | Anderson, IN | 7.5 GWh | 0.1 mi |
| IMPA Anderson Solar Park 2 | Anderson, IN | 12.0 GWh | 6.4 mi |
| IMPA Frankton Solar Park | Frankton, IN | 1.1 GWh | 11.5 mi |
| IMPA Knightstown Solar Park | Knightstown, IN | 2.4 GWh | 21.5 mi |
| IMPA Middletown Solar Park | Middletown, IN | 2.5 GWh | 10.7 mi |
| IMPA Pendleton Solar Park | Pendleton, IN | 3.1 GWh | 4.8 mi |
| IMPA Tipton 2 Solar Park | Tipton, IN | 3.5 GWh | 23.7 mi |
| Lenape II | Indianapolis, IN | 4.9 GWh | 25 mi |
| M. G. Emmett J. Bean Federal Center | Indianapolis, IN | 519.0 MWh | 20.1 mi |
| New Castle Solar RES | New Castle, IN | 1.7 GWh | 22.5 mi |
| Noblesville | Noblesville, IN | 1.7 TWh | 12.7 mi |
| POET Biorefining- Alexandria, LLC | Alexandria, IN | 18.5 GWh | 17.3 mi |
| Tipton Solar Park | Tipton, IN | 8.7 GWh | 23.6 mi |
| Wildcat Wind Farm I, LLC | Elwood, IN | 671.7 GWh | 21.2 mi |