Bacliff
5501 State Highway 146, Bacliff, TX 77518Plant Summary Information
Bacliff is ranked #139 out of 314 natural gas power plants in Texas in terms of total annual net electricity generation.
Bacliff is comprised of 6 generators and generated 40.0 GWh during the 3-month period between July 2025 to October 2025.
| Plant Name | Bacliff |
|---|---|
| Utility Name | PHR Holdings LLC |
| Location | Galveston County, TX |
| Initial Operation Date | July 2018 |
| Last Update | Oct 2025 |
| Annual Generation | 106.5 GWh |
| Annual Consumption | 1.6 M MMBtu |
| Ranked #3,340 out of 12,553 Power Plants Nationwide | |
| Ranked #893 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #488 out of 804 Texas Power Plants | |
| Ranked #139 out of 314 Texas Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
| Previous Operator |
PHR Holdings LLC (2015 to 2024) NRG Texas Power LLC (2016 to 2017) |
Map of Bacliff
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bacliff.
Monthly Net Generation for Bacliff
Bacliff Details
| Summary Information | |
|---|---|
| Plant Name | Bacliff (60264) |
| Plant Address | 5501 State Highway 146, Bacliff, TX 77518 |
| Utility | PHR Holdings LLC (60048) |
| Latitude, Longitude | 29.49233, -94.98483 |
| Generation Dates on File | Jan 2017 to Oct 2025 |
| Initial Operation Date | July 2018 |
| Annual Generation | 106.5 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | None |
| Ash Impoundment | No |
| Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | KINDER MORGAN TEXAS PIPELINE LLC |
Generator BCGT1 Details Operating July 2018
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | BAC_BAC_CTG1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BAC_BAC_CTG1 |
| Nameplate Capacity | 71.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 54 MW |
| Winter Capacity | 60 MW |
| Minimum Load | 54 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2018 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator BCGT2 Details Operating July 2018
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | BAC_BAC_CTG2 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BAC_BAC_CTG2 |
| Nameplate Capacity | 71.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 54 MW |
| Winter Capacity | 60 MW |
| Minimum Load | 54 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator BCGT3 Details Operating July 2018
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | BAC_BAC_CTG3 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BAC_BAC_CTG3 |
| Nameplate Capacity | 71.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 54 MW |
| Winter Capacity | 60 MW |
| Minimum Load | 54 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator BCGT4 Details Operating July 2018
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | BAC_BAC_CTG4 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BAC_BAC_CTG4 |
| Nameplate Capacity | 71.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 54 MW |
| Winter Capacity | 60 MW |
| Minimum Load | 54 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator BCGT5 Details Operating July 2018
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | BAC_BAC_CTG5 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BAC_BAC_CTG5 |
| Nameplate Capacity | 71.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 54 MW |
| Winter Capacity | 60 MW |
| Minimum Load | 54 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator BCGT6 Details Operating July 2018
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | BAC_BAC_CTG6 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BAC_BAC_CTG6 |
| Nameplate Capacity | 71.2 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 54 MW |
| Winter Capacity | 60 MW |
| Minimum Load | 54 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2018 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Bacliff Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #883 | Cargill Corn Milling Division | Eddyville, IA | 110.5 GWh |
| #884 | Harlem River Yard | Bronx, NY | 109.7 GWh |
| #885 | PPS Power Plant No 1 | Paducah, KY | 109.4 GWh |
| #886 | HP Hood CT | Winchester, VA | 109.3 GWh |
| #887 | Gibson City Energy Center LLC | Gibson City, IL | 109.3 GWh |
| #888 | Lawrence County Station | Mitchell, IN | 109.3 GWh |
| #889 | Glenwood Landing | Glenwood Landing, NY | 129.2 GWh |
| #890 | Georgia-Pacific Consr Prods LP-Naheola | Pennington, AL | 446.5 GWh |
| #891 | Pixelle Specialty Solutions LLC - Spring | Spring Grove, PA | 401.5 GWh |
| #892 | Butler-Warner Generation Plant | Fayetteville, NC | 109.8 GWh |
| #894 | Derby Fuel Cell | Derby, CT | 105.9 GWh |
| #895 | Hell Gate | Bronx, NY | 105.5 GWh |
| #896 | Greenville Electric Generating Station | Greenville, OH | 105.0 GWh |
| #897 | Camden Plant Holding LLC | Camden, NJ | 104.5 GWh |
| #898 | Joseph J Seymour Power Project | Brooklyn, NY | 104.2 GWh |
| #899 | Bob Glanzer Generating Station | Huron, SD | 104.1 GWh |
| #900 | Vanderbilt University Power Plant | Nashville, TN | 103.8 GWh |
| #901 | Gravel Neck | Surry, VA | 115.4 GWh |
| #902 | Silas Ray | Brownsville, TX | 103.4 GWh |
| #903 | Central Heating Plant | Amherst, MA | 104.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bacliff.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bayou Cogen Plant | Pasadena, TX | 2.4 TWh | 9.7 mi |
| Exelon LaPorte Generating Station | LaPorte, TX | 164.9 GWh | 15.5 mi |
| GCWA | Texas City, TX | 125.0 MWh | 8 mi |
| Green Power 2 | Texas City, TX | 3.8 TWh | 8.5 mi |
| HEB00028 | League City, TX | 223.0 MWh | 6.9 mi |
| HEB00769 | Webster, TX | 177.0 MWh | 10.8 mi |
| NASA Johnson Space Center CHP | Houston, TX | 82.7 GWh | 7.9 mi |
| Power Station 4 | Texas City, TX | 401.4 GWh | 8.7 mi |
| San Jacinto Steam Electric Station | La Porte, TX | 857.9 GWh | 14.4 mi |
| Texas City Plant Union Carbide | Texas City, TX | 78.1 GWh | 8.4 mi |
| Texas City Power Plant | Texas City, TX | 1.9 TWh | 8.2 mi |
| Topaz Generating | Texas City, TX | 591.5 GWh | 4.6 mi |
| WAL1062 | Friendswood, TX | 237.0 MWh | 11.3 mi |
| WAL3298 | Kemah, TX | 209.0 MWh | 3.6 mi |
| WAL3510 | Pearland, TX | 218.0 MWh | 15.5 mi |
| WAL462 | Alvin, TX | 142.0 MWh | 15.6 mi |
| WAL5116 | Deer Park, TX | 263.0 MWh | 13.7 mi |
| WAL529 | La Marque, TX | 163.0 MWh | 8.3 mi |
| WAL5388 | League City, TX | 128.0 MWh | 6.5 mi |
| WAL752 | Pasadena, TX | 183.0 MWh | 15 mi |