CCSU Co-Gen-STBY Gen
1615 Stanley Street, East Hall, New Britain, CT 6050Plant Summary Information
CCSU Co-Gen-STBY Gen is ranked #53 out of 53 natural gas power plants in Connecticut in terms of total annual net electricity generation.
CCSU Co-Gen-STBY Gen is comprised of 4 generators and generated 23.9 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | CCSU Co-Gen-STBY Gen |
---|---|
Utility Name | Central Connecticut State University |
Location | Capitol Planning Region, CT |
Initial Operation Date | October 1993 |
Last Update | Dec 2024 |
Annual Generation | 90.2 MWh |
Annual Consumption | 1.2 k MMBtu |
Ranked #11,923 out of 12,312 Power Plants Nationwide | |
Ranked #2,127 out of 2,220 Natural Gas Power Plants Nationwide | |
Ranked #156 out of 158 Connecticut Power Plants | |
Ranked #53 out of 53 Connecticut Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of CCSU Co-Gen-STBY Gen
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CCSU Co-Gen-STBY Gen.
Monthly Net Generation for CCSU Co-Gen-STBY Gen
CCSU Co-Gen-STBY Gen Details
Summary Information | |
---|---|
Plant Name | CCSU Co-Gen-STBY Gen (58224) |
Plant Address | 1615 Stanley Street, East Hall, New Britain, CT 6050 |
Utility | Central Connecticut State University (58188) |
Latitude, Longitude | 41.69139, -72.76861 |
Generation Dates on File | Jan 2012 to Dec 2024 |
Initial Operation Date | October 1993 |
Annual Generation | 90.2 MWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Educational Services (611) |
Sector | Commercial CHP (5) |
Water Source | cooling tower |
Ash Impoundment | No |
Transmission / Distribution Owner | Connecticut Light & Power Co (4176) CT |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | CONNECTICUT NAT GAS CORP |
Natural Gas Storage | No |
Generator MEMH Details Standby October 1993
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.7 MW |
Winter Capacity | 0.7 MW |
Minimum Load | 0.7 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | October 1993 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator EC#1 Details Standby May 2004
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.3 MW |
Winter Capacity | 1.3 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | May 2004 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | Yes |
Other Modifications | December 2026 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator EC#2 Details Standby May 2004
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.3 MW |
Winter Capacity | 1.3 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | May 2004 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | Yes |
Other Modifications | December 2026 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GRND Details Standby June 2012
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | June 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial CHP (5) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
CCSU Co-Gen-STBY Gen Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2117 | Atlantic | Atlantic, IA | 110.0 MWh |
#2118 | Brookville Smart Bus Depot Microgrid | Silver Spring, MD | 2.2 GWh |
#2119 | Waverly Municipal Electric North Plant | Waverly, IA | 232.0 MWh |
#2120 | WAL897 | Fort Stockton, TX | 103.0 MWh |
#2121 | Whitemarsh Central Utility Plant | Lafayette Hill, PA | 97.0 MWh |
#2122 | University of Alaska Fairbanks | Fairbanks, AK | 66.1 GWh |
#2123 | GenConn Devon LLC | Milford, CT | 2.3 GWh |
#2124 | Triton East and West Cogen | River Grove, IL | 93.0 MWh |
#2125 | Ellinwood | Ellinwood, KS | 118.0 MWh |
#2126 | Cholla | Joseph City, AZ | 1.3 TWh |
#2128 | Litchfield | Litchfield, MN | 143.0 MWh |
#2129 | HEB00794 | McKinney, TX | 89.0 MWh |
#2130 | Minneapolis City of | Minneapolis, KS | 99.0 MWh |
#2131 | Baldwin City Plant No 2 | Baldwin City, KS | 199.0 MWh |
#2132 | US Magnesium | Rowley, UT | 82.3 MWh |
#2133 | Nine Springs | Madison, WI | 82.0 MWh |
#2134 | Russell Downtown | Russell, KS | 87.0 MWh |
#2135 | Cumberland (WI) | Cumberland, WI | 260.0 MWh |
#2136 | West Point Municipal | West Point, NE | 109.0 MWh |
#2137 | HEB00797 | Katy, TX | 71.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding CCSU Co-Gen-STBY Gen.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bristol Solar One, LLC | Bristol, CT | 4.9 GWh | 10.8 mi |
Burlington Solar 1 | Burlington, CT | 5.6 GWh | 8.8 mi |
CCSU Fuel Cell Project | New Britain, CT | 10.2 GWh | 0.4 mi |
Cellu Tissue | East Hartford, CT | 11.8 GWh | 10.2 mi |
Corbin Russwin Phase 3 Berlin | Berlin, CT | 1.7 GWh | 3.7 mi |
Covanta Bristol Energy | Bristol, CT | 105.6 GWh | 8.1 mi |
CP Middletown Solar I LLC | Middletown, CT | 1.7 GWh | 10.4 mi |
CP Middletown Solar II LLC | Middletown, CT | 1.7 GWh | 10.4 mi |
FDX010.0 FedEx Fuel Cell | Middletown, CT | 7.9 GWh | 7.3 mi |
FedEx Middletown | Middletown, CT | 151.0 MWh | 7 mi |
Hartford Hospital Cogeneration | Hartford, CT | 43.8 GWh | 7 mi |
Hartford Landfill Solar EGF | Hartford, CT | 1.2 GWh | 9.2 mi |
HSCo CHP | Hartford, CT | 27.3 GWh | 7.1 mi |
Manchester Community College North | Great Path, CT | 1.5 GWh | 11.7 mi |
Niagara Bottling - Bloomfield | Bloomfield, CT | 4.5 GWh | 11.9 mi |
Pratt & Whitney | East Hartford, CT | 104.1 GWh | 7.9 mi |
South Windsor Fuel Cell | South Windsor, CT | 38.9 GWh | 11.7 mi |
Town of Rocky Hill PV CSG | Rocky Hill, CT | 5.1 GWh | 7.7 mi |
Trinity College Fuel Cell | Hartford, CT | 8.9 GWh | 5.6 mi |
Wesleyan University Cogen 1 | Middletown, CT | 9.9 GWh | 11.1 mi |