CCSU Co-Gen-STBY Gen
1615 Stanley Street, East Hall, New Britain, CT 6050Plant Summary Information
CCSU Co-Gen-STBY Gen is ranked #52 out of 52 natural gas power plants in Connecticut in terms of total annual net electricity generation.
CCSU Co-Gen-STBY Gen is comprised of 4 generators and generated 2.5 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | CCSU Co-Gen-STBY Gen |
|---|---|
| Utility Name | Central Connecticut State University |
| Location | Capitol Planning Region, CT |
| Initial Operation Date | October 1993 |
| Last Update | Dec 2025 |
| Annual Generation | 9.8 MWh |
| Annual Consumption | 229 MMBtu |
| Ranked #12,997 out of 13,081 Power Plants Nationwide | |
| Ranked #2,172 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #168 out of 168 Connecticut Power Plants | |
| Ranked #52 out of 52 Connecticut Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of CCSU Co-Gen-STBY Gen
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CCSU Co-Gen-STBY Gen.
Monthly Net Generation for CCSU Co-Gen-STBY Gen
Monthly Plant Fuel Consumption for CCSU Co-Gen-STBY Gen
CCSU Co-Gen-STBY Gen Details
| Summary Information | |
|---|---|
| Plant Name | CCSU Co-Gen-STBY Gen (58224) |
| Plant Address | 1615 Stanley Street, East Hall, New Britain, CT 6050 |
| Utility | Central Connecticut State University (58188) |
| Latitude, Longitude | 41.69139, -72.76861 |
| Generation Dates on File | Jan 2012 to Dec 2025 |
| Initial Operation Date | October 1993 |
| Annual Generation | 9.8 MWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | NPCC |
| Balancing Authority | ISO New England Inc. (ISNE) |
| NAICS Code | Educational Services (611) |
| Sector | Commercial CHP (5) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Connecticut Light & Power Co (4176) CT |
| Grid Voltage | 13.80 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | CONNECTICUT NAT GAS CORP |
| Natural Gas Storage | No |
Generator MEMH Details Standby October 1993
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.7 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.7 MW |
| Winter Capacity | 0.7 MW |
| Minimum Load | 0.7 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | No |
| First Operation Date | October 1993 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Commercial CHP (5) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator EC#1 Details Standby May 2004
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.3 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.3 MW |
| Winter Capacity | 1.3 MW |
| Minimum Load | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | Yes |
| First Operation Date | May 2004 |
| Combined Heat & Power | Yes |
|---|---|
| Sector Name | Commercial CHP (5) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator EC#2 Details Standby May 2004
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.3 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 1.3 MW |
| Winter Capacity | 1.3 MW |
| Minimum Load | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | Yes |
| First Operation Date | May 2004 |
| Combined Heat & Power | Yes |
|---|---|
| Sector Name | Commercial CHP (5) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GRND Details Standby June 2012
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.3 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | No |
| First Operation Date | June 2012 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Commercial CHP (5) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
CCSU Co-Gen-STBY Gen Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2162 | Ellinwood | Ellinwood, KS | 28.0 MWh |
| #2163 | Preston (MN) | Preston, MN | 78.0 MWh |
| #2164 | Auburn | Auburn, NE | 31.0 MWh |
| #2165 | Rockland Bakery Inc. | Nanuet, NY | 22.0 MWh |
| #2166 | Missouri River Wastewater Treatment | Omaha, NE | 10.2 GWh |
| #2167 | Winterset | Winterset, IA | 33.0 MWh |
| #2168 | Anthony | Anthony, KS | 13.0 MWh |
| #2169 | WAL1455 | Fort Worth, TX | 12.0 MWh |
| #2170 | Osborne | Osborne, KS | 30.4 MWh |
| #2171 | Moose Lake | Moose Lake, MN | 128.0 MWh |
| #2173 | Burlingame | Burlingame, KS | 9.0 MWh |
| #2174 | Sterling | Sterling, KS | 22.0 MWh |
| #2175 | Hoisington | Hoisington, KS | 39.0 MWh |
| #2176 | Standby Generation Plant | Pensacola, FL | 8.0 MWh |
| #2177 | Water Reclamation Plant | Rochester, MN | 3.7 GWh |
| #2178 | Preston (IA) | Preston, IA | 9.0 MWh |
| #2179 | Kingfisher | Kingfisher, OK | 24.0 MWh |
| #2180 | Alliant SBG 9802 Toyota | Cedar Rapids, IA | 6.3 MWh |
| #2181 | Bay View Backup Power Facility | Toledo, OH | 629.0 MWh |
| #2182 | Girard | Girard, KS | 41.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding CCSU Co-Gen-STBY Gen.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bristol Solar One, LLC | Bristol, CT | 4.9 GWh | 10.8 mi |
| Burlington Solar 1 | Burlington, CT | 5.8 GWh | 8.8 mi |
| CCSU Fuel Cell Project | New Britain, CT | 7.0 GWh | 0.4 mi |
| Cellu Tissue | East Hartford, CT | 11.7 GWh | 10.2 mi |
| Corbin Russwin Phase 3 Berlin | Berlin, CT | 1.6 GWh | 3.7 mi |
| Covanta Bristol Energy | Bristol, CT | 108.5 GWh | 8.1 mi |
| CP Middletown Solar I LLC | Middletown, CT | 1.6 GWh | 10.4 mi |
| CP Middletown Solar II LLC | Middletown, CT | 1.6 GWh | 10.4 mi |
| FDX010.0 FedEx Fuel Cell | Middletown, CT | 8.1 GWh | 7.3 mi |
| FedEx Middletown | Middletown, CT | 1.9 GWh | 7 mi |
| Hartford Hospital Cogeneration | Hartford, CT | 39.5 GWh | 7 mi |
| Hartford Landfill Solar EGF | Hartford, CT | 1.2 GWh | 9.2 mi |
| HSCo CHP | Hartford, CT | 27.7 GWh | 7.1 mi |
| Manchester Community College North | Great Path, CT | 1.5 GWh | 11.7 mi |
| Niagara Bottling - Bloomfield | Bloomfield, CT | 4.0 GWh | 11.9 mi |
| Pratt & Whitney | East Hartford, CT | 75.9 GWh | 7.9 mi |
| South Windsor Fuel Cell | South Windsor, CT | 37.4 GWh | 11.7 mi |
| Town of Rocky Hill PV CSG | Rocky Hill, CT | 5.0 GWh | 7.7 mi |
| Trinity College Fuel Cell | Hartford, CT | 11.5 GWh | 5.6 mi |
| Wesleyan University Cogen 1 | Middletown, CT | 4.0 GWh | 11.1 mi |