Mulberry Cogeneration Facility
3600 Highway 555, Bartow, FL 33830Plant Summary Information
Mulberry Cogeneration Facility is ranked #48 out of 308 power plants in Florida in terms of total annual net electricity generation.
Mulberry Cogeneration Facility is comprised of 2 generators and generated 55.1 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Mulberry Cogeneration Facility |
---|---|
Utility Name | Florida Municipal Power Agency |
Location | Polk County, FL |
Initial Operation Date | May 1994 |
Last Update | Dec 2024 |
Annual Generation | 388.0 GWh |
Annual Consumption | 3.6 M MMBtu |
Ranked #1,576 out of 12,288 Power Plants Nationwide | |
Ranked #599 out of 2,221 Natural Gas Power Plants Nationwide | |
Ranked #48 out of 308 Florida Power Plants | |
Ranked #44 out of 81 Florida Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
Northern Star Generation Services Co LLC (2013 to 2023) Florida Municipal Power Agency (2024 to 2024) |
Map of Mulberry Cogeneration Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mulberry Cogeneration Facility.
Monthly Net Generation for Mulberry Cogeneration Facility
Mulberry Cogeneration Facility Details
Summary Information | |
---|---|
Plant Name | Mulberry Cogeneration Facility (54426) |
Plant Address | 3600 Highway 555, Bartow, FL 33830 |
Utility | Florida Municipal Power Agency (6567) |
Latitude, Longitude | 27.8489, -81.8775 |
Generation Dates on File | Jan 2001 to Dec 2024 |
Initial Operation Date | May 1994 |
Annual Generation | 388.0 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 92-54-007 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Progress Energy Florida (FPC) |
NAICS Code | Utilities (22) |
Sector | IPP CHP (3) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Florida, Inc (6455) FL |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | FLORIDA GAS TRANSMISSION COMPANY |
Natural Gas Storage | No |
Generator GT1 Details Operating May 1994
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 82 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 78 MW |
Winter Capacity | 80 MW |
Minimum Load | 40 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1994 |
---|---|
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | DFO / NG |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 78 MW |
Net Winter Capacity With Natural Gas | 80 MW |
Net Summer Capacity With Oil | 78 MW |
Net Winter Capacity With Oil | 80 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator ST1 Details Operating July 1994
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 45.7 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 37 MW |
Winter Capacity | 40 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1994 |
---|---|
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | B |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Mulberry Cogeneration Facility Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Florida Municipal Power Agency | 8553 Commodity Circle, Orlando, FL 32819 | Generator GT1 | 100.00% |
Florida Municipal Power Agency | 8553 Commodity Circle, Orlando, FL 32819 | Generator ST1 | 0.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#589 | Silver Creek | Prentiss, MS | 427.7 GWh |
#590 | Indeck Corinth Energy Center | Corinth, NY | 422.3 GWh |
#591 | Rio Bravo | Albuquerque, NM | 418.8 GWh |
#592 | Nikiski Combined Cycle | Nikiski, AK | 414.8 GWh |
#593 | Cheyenne Prairie Generating Station | Cheyenne, WY | 409.5 GWh |
#594 | Primient | Lafayette, IN | 406.0 GWh |
#595 | Power Station 4 | Texas City, TX | 401.4 GWh |
#596 | Kennedy International Airport Cogen | Jamaica, NY | 398.6 GWh |
#597 | Primient Loudon Plant | Loudon, TN | 393.6 GWh |
#598 | RockGen Energy Center | Cambridge, WI | 391.6 GWh |
#600 | Orange Cogeneration Facility | Bartow, FL | 387.5 GWh |
#601 | Tulsa | Tulsa, OK | 384.5 GWh |
#602 | Marsh Run Generation Facility | Remington, VA | 390.8 GWh |
#603 | University of Florida | Gainesville, FL | 379.0 GWh |
#604 | Gary Works | Gary, IN | 766.0 GWh |
#605 | Trinidad (TX) | Trinidad, TX | 376.4 GWh |
#606 | F.D. Kuester Generating Station | Negaunee, MI | 374.8 GWh |
#607 | Formosa Plastics | Baton Rouge, LA | 369.6 GWh |
#608 | Sundance | Casa Grande, AZ | 369.2 GWh |
#609 | Kimberly Clark Mobile - CHP Plant | Mobile, AL | 367.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mulberry Cogeneration Facility.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alafia Solar | Mulberry, FL | 117.8 GWh | 12.5 mi |
Bartow Solar Energy LLC | Bartow, FL | 11.7 GWh | 6.4 mi |
Bonnie Mine Solar | Bartow, FL | 59.0 GWh | 7.3 mi |
Durrance | Mulberry, FL | 64.5 GWh | 7.9 mi |
English Creek Solar | Plant City, FL | 791.0 MWh | 13.4 mi |
Goldfinch | Lakeland, FL | 4.4 GWh | 13.6 mi |
Hines Energy Complex | Bartow, FL | 12.3 TWh | 4.2 mi |
Jamison Solar (FL) | Mulberry, FL | 144.8 GWh | 5.6 mi |
Lake Hancock Solar | Bartow, FL | 91.8 GWh | 13.1 mi |
Larsen Memorial | Lakeland, FL | 237.6 GWh | 14.1 mi |
Laurel Oaks Solar | Plant City, FL | 123.0 GWh | 12.8 mi |
Magnolia Solar | Mulberry, FL | 141.0 GWh | 11.5 mi |
Mosaic Co Bartow Facility | Bartow, FL | 144.6 GWh | 4.8 mi |
Mosaic New Wales Operations | Mulberry, FL | 369.2 GWh | 10.7 mi |
Mosaic South Pierce Operations | Mulberry, FL | 114.2 GWh | 6.9 mi |
Orange Cogeneration Facility | Bartow, FL | 387.5 GWh | 3.5 mi |
Payne Creek Solar | Bowling Green, FL | 118.7 GWh | 13.8 mi |
Peace Creek Solar | Bartow, FL | 89.0 GWh | 6.1 mi |
Polk | Mulberry, FL | 5.9 TWh | 10.8 mi |
Tiger Bay | Ft. Meade, FL | 1.0 TWh | 7.3 mi |