Gallatin (TN)
1499 Steam Plant Rd., Gallatin, TN 37066Plant Summary Information
Gallatin (TN) is ranked #36 out of 133 coal plants nationwide in terms of total annual net electricity generation.
Gallatin (TN) is comprised of 12 generators and generated 1.0 TWh during the 3-month period between April 2024 to July 2024.
Plant Name | Gallatin (TN) |
---|---|
Utility Name | Tennessee Valley Authority |
Location | Sumner County, TN |
Initial Operation Date | November 1956 |
Last Update | Jul 2024 |
Annual Generation | 3.6 TWh |
Annual Consumption | 46.3 M MMBtu |
Ranked #315 out of 11,825 Power Plants Nationwide | |
Ranked #36 out of 133 Subbituminous Coal Power Plants Nationwide | |
Ranked #6 out of 84 Tennessee Power Plants | |
Ranked #1 out of 2 Tennessee Subbituminous Coal Power Plants | |
Fuel Types | Subbituminous Coal : 87.4% Bituminous Coal : 10.4% Natural Gas : 2.0% |
Map of Gallatin (TN)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gallatin (TN).
Monthly Net Generation for Gallatin (TN)
Gallatin (TN) Details
Summary Information | |
---|---|
Plant Name | Gallatin (TN) (3403) |
Plant Address | 1499 Steam Plant Rd., Gallatin, TN 37066 |
Utility | Tennessee Valley Authority (18642) |
Latitude, Longitude | 36.3156, -86.4006 |
Generation Dates on File | Jan 2001 to Jul 2024 |
Initial Operation Date | November 1956 |
Annual Generation | 3.6 TWh |
Fuel Types | Subbituminous Coal : 87.4% Bituminous Coal : 10.4% Natural Gas : 2.0% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tennessee Valley Authority (TVA) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Cumberland River |
Ash Impoundment | Yes Not Lined Operating |
Transmission / Distribution Owner | Tennessee Valley Authority (18642) TN |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | COLUMBIA GAS DIST CO |
Pipeline Name | COLUMBIA GULF TRANSMISSION |
Natural Gas Storage | No |
Generator 1 Details Operating November 1956
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 300 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 225 MW |
Winter Capacity | 228 MW |
Minimum Load | 108 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1956 |
Planned Retirement | December 2031 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Bituminous Coal / Subbituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Generator 2 Details Operating June 1957
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 300 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 225 MW |
Winter Capacity | 228 MW |
Minimum Load | 108 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1957 |
Planned Retirement | December 2031 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Subbituminous Coal / Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Generator 3 Details Operating May 1959
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 327.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 263 MW |
Winter Capacity | 266 MW |
Minimum Load | 130 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 1959 |
Planned Retirement | December 2031 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Subbituminous Coal / Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Generator 4 Details Operating August 1959
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 327.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 263 MW |
Winter Capacity | 266 MW |
Minimum Load | 130 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1959 |
Planned Retirement | December 2031 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Subbituminous Coal / Bituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Multiple Fuels | Yes |
Generator GT1 Details Operating July 1975
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 81.3 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 71.5 MW |
Winter Capacity | 88.7 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1975 |
Planned Retirement | December 2031 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 71.5 MW |
Net Winter Capacity With Natural Gas | 88.7 MW |
Net Summer Capacity With Oil | 70.9 MW |
Net Winter Capacity With Oil | 94.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT2 Details Operating July 1975
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 81.3 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 71.5 MW |
Winter Capacity | 88.7 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1975 |
Planned Retirement | December 2031 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 71.5 MW |
Net Winter Capacity With Natural Gas | 88.7 MW |
Net Summer Capacity With Oil | 70.9 MW |
Net Winter Capacity With Oil | 94.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT3 Details Operating July 1975
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 81.3 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 71.5 MW |
Winter Capacity | 88.7 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1975 |
Planned Retirement | December 2031 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 71.5 MW |
Net Winter Capacity With Natural Gas | 88.7 MW |
Net Summer Capacity With Oil | 70.9 MW |
Net Winter Capacity With Oil | 94.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT4 Details Operating July 1975
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 81.3 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 71.5 MW |
Winter Capacity | 88.7 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 1975 |
Planned Retirement | December 2031 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 71.5 MW |
Net Winter Capacity With Natural Gas | 88.7 MW |
Net Summer Capacity With Oil | 70.9 MW |
Net Winter Capacity With Oil | 94.9 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT5 Details Operating July 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 84.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 73.4 MW |
Winter Capacity | 93.7 MW |
Minimum Load | 57 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2000 |
Planned Retirement | December 2031 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 73.4 MW |
Net Winter Capacity With Natural Gas | 93.7 MW |
Net Summer Capacity With Oil | 75.1 MW |
Net Winter Capacity With Oil | 95.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT6 Details Operating July 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 84.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 73.4 MW |
Winter Capacity | 93.7 MW |
Minimum Load | 57 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2000 |
Planned Retirement | December 2031 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 73.4 MW |
Net Winter Capacity With Natural Gas | 93.7 MW |
Net Summer Capacity With Oil | 75.1 MW |
Net Winter Capacity With Oil | 95.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT7 Details Operating July 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 84.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 73.4 MW |
Winter Capacity | 93.7 MW |
Minimum Load | 57 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2000 |
Planned Retirement | December 2031 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 73.4 MW |
Net Winter Capacity With Natural Gas | 93.7 MW |
Net Summer Capacity With Oil | 75.1 MW |
Net Winter Capacity With Oil | 95.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator GT8 Details Operating July 2000
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 84.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 73.4 MW |
Winter Capacity | 93.7 MW |
Minimum Load | 57 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2000 |
Planned Retirement | December 2031 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 73.4 MW |
Net Winter Capacity With Natural Gas | 93.7 MW |
Net Summer Capacity With Oil | 75.1 MW |
Net Winter Capacity With Oil | 95.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Gallatin (TN) Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Subbituminous Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#26 | Shawnee | West Paducah, KY | 5.2 TWh |
#27 | Craig (CO) | Craig, CO | 5.1 TWh |
#28 | Rockport | Rockport, IN | 4.9 TWh |
#29 | Columbia (WI) | Pardeville, WI | 4.3 TWh |
#30 | Clay Boswell | Cohasset, MN | 4.3 TWh |
#31 | Welsh | Pittsburg, TX | 4.1 TWh |
#32 | Weston | Rothschild, WI | 3.9 TWh |
#33 | Dave Johnston | Glen Rock, WY | 3.7 TWh |
#34 | Iatan | Weston, MO | 3.7 TWh |
#35 | South Oak Creek | Oak Creek, WI | 3.3 TWh |
#37 | White Bluff | Redfield, AR | 3.1 TWh |
#38 | Coronado | St Johns, AZ | 3.1 TWh |
#39 | Transalta Centralia Generation | Centralia, WA | 3.1 TWh |
#40 | John W Turk Jr Power Plant | Fulton, AR | 3.0 TWh |
#41 | Sandy Creek Energy Station | Riesel, TX | 3.0 TWh |
#42 | Plum Point Energy Station | Osceola, AR | 3.0 TWh |
#43 | Coleto Creek | Fannin, TX | 2.9 TWh |
#44 | Newton | Newton, IL | 2.9 TWh |
#45 | Four Corners | Fruitland, NM | 8.0 TWh |
#46 | Louisa | Muscatine, IA | 2.9 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Gallatin (TN).
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bi-County Gas Producers | Woodlawn, TN | 11.2 GWh | 65.5 mi |
Center Hill | Lancaster, TN | 308.1 GWh | 35.3 mi |
Cheatham | Ashland City, TN | 177.3 GWh | 45.7 mi |
Cordell Hull | Carthage, TN | 280.7 GWh | 25.5 mi |
Cumberland (TN) | Cumberland City, TN | 9.5 TWh | 69.9 mi |
Dale Hollow | Celina, TN | 92.8 GWh | 54.9 mi |
Glasgow LFGTE | Glasgow, KY | 4.3 GWh | 52.5 mi |
Glover Creek Solar, LLC | Summer Shade, KY | 17.6 GWh | 55.6 mi |
Great Falls (TN) | Rock Island, TN | 32.2 GWh | 55.4 mi |
J P Priest | Nashville, TN | 45.5 GWh | 16.4 mi |
McMinnville | McMinnville, TN | 143.0 MWh | 55.9 mi |
MTSU Power Co-Gen Plant | Murfreesboro, TN | 37.6 GWh | 32.1 mi |
Music City Community Solar | Madison, TN | 2.6 GWh | 19.8 mi |
Old Hickory | Hendersonville, TN | 368.7 GWh | 14.3 mi |
Opryland USA | Nashville, TN | 26.0 GWh | 17.9 mi |
SR Bell Buckle | Shelbyville, TN | 48.9 GWh | 51.6 mi |
SR Clarksville II, LLC | Clarksville, TN | 62.0 MWh | 52.8 mi |
SR Clarksville, LLC | Clarksville, TN | 93.0 MWh | 52.9 mi |
SR Franklin, LLC | Franklin, KY | 129.0 MWh | 28.7 mi |
Vanderbilt University Power Plant | Nashville, TN | 94.3 GWh | 25.3 mi |