West Campus Cogeneration Facility is ranked #21 out of 239 power plants in Wisconsin in terms of total annual net electricity generation.

West Campus Cogeneration Facility is comprised of 3 generators and generated 68.6 GWh during the 3-month period between September 2024 to December 2024.

Plant NameWest Campus Cogeneration Facility
Utility NameMadison Gas & Electric Co
LocationDane County, WI
Initial Operation DateApril 2005
Last Update Dec 2024
Annual Generation 282.0 GWh
Annual Consumption 3.4 M MMBtu
Ranked #1,972 out of 12,288 Power Plants Nationwide
Ranked #664 out of 2,221 Natural Gas Power Plants Nationwide
Ranked #21 out of 239 Wisconsin Power Plants
Ranked #12 out of 52 Wisconsin Natural Gas Power Plants
Fuel Types Natural Gas : 99.8%

Map of West Campus Cogeneration Facility

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for West Campus Cogeneration Facility.

Create Your Account Today

Monthly Net Generation for West Campus Cogeneration Facility

West Campus Cogeneration Facility Details

Summary Information
Plant NameWest Campus Cogeneration Facility (7991)
Plant Address515 Walnut Street, Madison, WI 53701
UtilityMadison Gas & Electric Co (11479)
Latitude, Longitude43.07507, -89.4251
Generation Dates on FileApr 2005 to Dec 2024
Initial Operation DateApril 2005
Annual Generation 282.0 GWh
Fuel Types Natural Gas : 99.8%
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc.. (MISO)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water SourceLake Mendota
Ash Impoundment No
Transmission / Distribution OwnerAmerican Transmission Co (659)
Grid Voltage 69.00 kV
Energy StorageNo
 
Natural Gas Information
Local Distribution Company (LDC)MADISON GAS ELEC CO
Natural Gas StorageNo
Liquefied Natural Gas StorageNo

Generator 1 Details Operating April 2005

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Combustion Turbine Part
Unit CodeCC1
OwnershipSingle Owner
Can Bypass Heat Recovery Steam GeneratorNo
RTO ISO LMP Node DesignationMGE.CC.WCCF
RTO ISO Location Designation For Reporting Wholesale Sales DataMGE.CC.WCCF
Nameplate Capacity54 MW
Nameplate Power Factor0.9
Summer Capacity29.6 MW
Winter Capacity38.8 MW
Minimum Load27 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2005
Combined Heat & Power Yes
Sector NameElectric Utility (1)
Topping Or BottomingT
Energy SourceNatural Gas / Distillate Fuel Oil
Startup SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Other Planned ModificationsNo
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas29.6 MW
Net Winter Capacity With Natural Gas38.8 MW
Time To Switch From Gas To OilUNK
Time To Switch From Oil To GasUNK
Factors That Limit SwitchingYes
Air Permit LimitsYes
Other LimitsYes

Generator CT2 Details Operating April 2005

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Combustion Turbine Part
Unit CodeCC1
OwnershipSingle Owner
Can Bypass Heat Recovery Steam GeneratorNo
RTO ISO LMP Node DesignationMGE.CC.WCCF
RTO ISO Location Designation For Reporting Wholesale Sales DataMGE.CC.WCCF
Nameplate Capacity54 MW
Nameplate Power Factor0.9
Summer Capacity33.3 MW
Winter Capacity42.5 MW
Minimum Load27 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2005
Combined Heat & Power Yes
Sector NameElectric Utility (1)
Topping Or BottomingT
Energy SourceNatural Gas / Distillate Fuel Oil
Startup SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Other Planned ModificationsNo
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas33.3 MW
Net Winter Capacity With Natural Gas42.5 MW
Time To Switch From Gas To OilUNK
Time To Switch From Oil To GasUNK
Factors That Limit SwitchingYes
Air Permit LimitsYes
Other LimitsYes

Generator STG1 Details Operating April 2005

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Steam Part
Unit CodeCC1
OwnershipJointly Owned
Duct BurnersYes
RTO ISO LMP Node DesignationMGE.CC.WCCF
RTO ISO Location Designation For Reporting Wholesale Sales DataMGE.CC.WCCF
Nameplate Capacity61.3 MW
Nameplate Power Factor0.9
Summer Capacity66.2 MW
Winter Capacity52.7 MW
Minimum Load11 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2005
Combined Heat & Power Yes
Sector NameElectric Utility (1)
Topping Or BottomingT
Energy SourceNatural Gas / Distillate Fuel Oil
Startup SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Other Planned ModificationsNo
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas66.2 MW
Net Winter Capacity With Natural Gas52.7 MW
Time To Switch From Gas To OilUNK
Time To Switch From Oil To GasUNK
Factors That Limit SwitchingYes
Air Permit LimitsYes
Other LimitsYes

West Campus Cogeneration Facility Plant Owners

Owner NameAddressGeneratorOwnership
Madison Gas & Electric Co133 South Blair Street, Madison, WI 53701Generator STG175.00%
University of Wisconsin1217 University Ave., Madison, WI 53706Generator STG125.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Natural Gas.

RankPlant NamePlant LocationAnnual Generation
#654Lake CatherineJones Mill, AR299.6 GWh
#655Flint Hills Resources Pine Bend, LLCRosemount, MN299.0 GWh
#656Gordon Evans Energy CenterColwich, KS301.9 GWh
#657THUMSLong Beach, CA298.7 GWh
#658Lawrence Energy CenterLawrence, KS852.1 GWh
#659SylvarenaRaleigh, MS294.3 GWh
#660YuccaYuma, AZ295.9 GWh
#661Archer Daniels Midland Cedar RapidsCedar Rapids, IA1.0 TWh
#662Big Sandy Peaker PlantKenona, WV285.3 GWh
#663South HarperKansas City, MO284.5 GWh
#665Corpus RefineryCorpus Christi, TX280.5 GWh
#666Harry D Mattison Gas PlantTontitown, AR278.7 GWh
#667WoodlandModesto, CA278.2 GWh
#668Ames Electric Services Power PlantAmes, IA305.6 GWh
#669Sycamore CogenerationBakersfield, CA273.4 GWh
#670West Point (PA)West Point, PA272.0 GWh
#671Arapahoe Combustion Turbine ProjectDenver, CO271.7 GWh
#672US BoraxBoron, CA271.2 GWh
#673Frank KnutsonCommerce City, CO275.6 GWh
#674HoldenHolden, MO282.4 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding West Campus Cogeneration Facility.

Plant NamePlant LocationAnnual GenerationDistance
Albany Solar (WI)Broadhead, WI89.5 GWh28.4 mi
Blount StreetMadison, WI48.8 GWh2.6 mi
Columbia (WI)Pardeville, WI5.1 TWh28.4 mi
Crawfish RiverJefferson, WI105.2 GWh28.2 mi
Dane County Airport SolarMadison, WI17.7 GWh7.6 mi
Dane County Solar LLCCottage Grove, WI33.2 GWh9.6 mi
Diesel GeneratorsMadison, WI491.0 MWh2.6 mi
Epic VeronaVerona, WI2.7 GWh9 mi
FitchburgMadison, WI14.0 MWh4.5 mi
Galactic WindWaunakee, WI22.0 GWh5 mi
Hermsdorf SolarMadison, WI14.8 GWh8.4 mi
Middleton Airport SolarMiddleton, WI8.2 GWh6.1 mi
Middleton Biogas Solar, LLCMiddleton, WI3.3 GWh7 mi
Nine SpringsMadison, WI82.0 MWh4.2 mi
North RockEdgerton, WI99.1 GWh24.5 mi
O'Brien Solar FieldsFitchburg, WI38.5 GWh5.6 mi
Prairie Du SacPrairie du Sac, WI143.8 GWh22.3 mi
RockGen Energy CenterCambridge, WI391.6 GWh20.2 mi
Sycamore (WI)Madison, WI19.0 MWh6.3 mi
Tyto SolarFitchburg, WI10.8 GWh6.5 mi