Sumpter
8509 Rawsonville Road, Belleville, MI 48111Plant Summary Information
Sumpter is ranked #41 out of 269 power plants in Michigan in terms of total annual net electricity generation.
Sumpter is comprised of 4 generators and generated 80.2 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Sumpter |
|---|---|
| Utility Name | Wolverine Power Supply Coop |
| Location | Wayne County, MI |
| Initial Operation Date | July 2002 |
| Last Update | Dec 2025 |
| Annual Generation | 290.9 GWh |
| Annual Consumption | 3.5 M MMBtu |
| Ranked #2,075 out of 13,081 Power Plants Nationwide | |
| Ranked #662 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #41 out of 269 Michigan Power Plants | |
| Ranked #18 out of 71 Michigan Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Sumpter
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sumpter.
Monthly Net Generation for Sumpter
Monthly Plant Fuel Consumption for Sumpter
Sumpter Details
| Summary Information | |
|---|---|
| Plant Name | Sumpter (7972) |
| Plant Address | 8509 Rawsonville Road, Belleville, MI 48111 |
| Utility | Wolverine Power Supply Coop (20910) |
| Latitude, Longitude | 42.167, -83.5318 |
| Generation Dates on File | Jul 2002 to Dec 2025 |
| Initial Operation Date | July 2002 |
| Annual Generation | 290.9 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | RFC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | ITC Transmission (56068) MI |
| Grid Voltage | 120.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | Other - See pipeline notes. |
| Pipeline Notes | DTE ENERGY COMPANY |
| Natural Gas Storage | No |
Generator 1 Details Operating July 2002
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | DECO.JUDD11 |
| Nameplate Capacity | 85 MW |
| Nameplate Power Factor | 0.83 |
| Summer Capacity | 73.2 MW |
| Winter Capacity | 97 MW |
| Minimum Load | 45 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator 2 Details Operating July 2002
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | DECO.JUDD12 |
| Nameplate Capacity | 85 MW |
| Nameplate Power Factor | 0.83 |
| Summer Capacity | 76.4 MW |
| Winter Capacity | 101.1 MW |
| Minimum Load | 45 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator 3 Details Operating July 2002
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | DECO.JUDD13 |
| Nameplate Capacity | 85 MW |
| Nameplate Power Factor | 0.83 |
| Summer Capacity | 74.6 MW |
| Winter Capacity | 98.9 MW |
| Minimum Load | 45 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator 4 Details Operating July 2002
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | DECO.JUDD14 |
| Nameplate Capacity | 85 MW |
| Nameplate Power Factor | 0.83 |
| Summer Capacity | 75.3 MW |
| Winter Capacity | 99.6 MW |
| Minimum Load | 45 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2002 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
Sumpter Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #652 | Georgetown | Indianapolis, IN | 307.0 GWh |
| #653 | Georgia-Pacific Muskogee | Muskogee, OK | 351.8 GWh |
| #654 | West Campus Cogeneration Facility | Madison, WI | 305.2 GWh |
| #655 | Gordon Evans Energy Center | Colwich, KS | 313.7 GWh |
| #656 | Blue Spruce Energy Center | Aurora, CO | 304.6 GWh |
| #657 | Combined Locks Energy Center | Combined Locks, WI | 301.6 GWh |
| #658 | Denton Energy Center | Denton, TX | 301.0 GWh |
| #659 | Nevada Cogen Assoc#1 GarnetVly | Las Vegas, NV | 298.7 GWh |
| #660 | Antelope Station | Abernathy, TX | 296.6 GWh |
| #661 | Malburg | Vernon, CA | 291.4 GWh |
| #663 | Rio Bravo | Albuquerque, NM | 287.6 GWh |
| #664 | San Jacinto County Peaking Facility | Shepherd, TX | 287.4 GWh |
| #665 | Wolf Hills Energy | Bristol, VA | 287.0 GWh |
| #666 | Fulton (AR) | Fulton, AR | 285.3 GWh |
| #667 | Flint Hills Resources Pine Bend, LLC | Rosemount, MN | 361.6 GWh |
| #668 | Stony Brook Cogen Plant | Stony Brook, NY | 284.6 GWh |
| #669 | Woodland | Modesto, CA | 283.1 GWh |
| #670 | Silver Creek | Prentiss, MS | 282.3 GWh |
| #671 | V H Braunig | Elmendorf, TX | 281.9 GWh |
| #672 | Chino Mines | Hurley, NM | 276.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sumpter.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Dearborn Energy Center | Dearborn, MI | 237.3 GWh | 17.8 mi |
| Dearborn Industrial Generation | Dearborn, MI | 4.9 TWh | 21.5 mi |
| Delray | Detroit, MI | 145.1 GWh | 23.7 mi |
| Domino Farms Solar | Ann Arbor, MI | 844.0 MWh | 13.2 mi |
| East. Michigan Univ. Heating Plant | Ypsilanti, MI | 33.1 GWh | 7.5 mi |
| Fermi | Frenchtown Twp, MI | 8.1 TWh | 19.9 mi |
| French Landing Dam | Belleville, MI | 5.2 GWh | 5.7 mi |
| GRS Arbor Hills | Northville, MI | 1.2 GWh | 15.8 mi |
| Hancock | Commerce Twp, MI | 20.4 GWh | 26.8 mi |
| Hendershot Solar, LLC | Tecumseh, MI | 4.1 GWh | 22.3 mi |
| IKEA Canton Rooftop PV System | Canton, MI | 264.0 MWh | 12 mi |
| Monroe (MI) | Monroe, MI | 15.8 TWh | 21.3 mi |
| O'Shea Solar Farm | Detroit, MI | 2.9 GWh | 22.4 mi |
| Riverview Energy Systems | Riverview, MI | 1.1 GWh | 16.3 mi |
| Sumpter Energy Associates | Belleville, MI | 52.5 GWh | 4.6 mi |
| Superior | Superior Twp, MI | 789.0 MWh | 8.8 mi |
| University of Michigan | Ann Arbor, MI | 232.3 GWh | 13 mi |
| Warner Lambert | Ann Arbor, MI | 24.2 GWh | 12.7 mi |
| White Tail Solar | Milan, MI | 99.0 GWh | 6.9 mi |
| Wyandotte | Wyandotte, MI | 110.0 MWh | 20 mi |