Harrington

8400 N.Lakeside Dr., Amarillo, TX 79108

Plant Summary Information

Harrington is ranked #56 out of 314 natural gas power plants in Texas in terms of total annual net electricity generation.

Harrington is comprised of 3 generators and generated 751.4 GWh during the 3-month period between June 2025 to September 2025.

Plant NameHarrington
Utility NameSouthwestern Public Service Co
LocationPotter County, TX
Initial Operation DateJanuary 1976
Last Update Sep 2025
Annual Generation 2.3 TWh
Annual Consumption 27.7 M MMBtu
Ranked #480 out of 12,539 Power Plants Nationwide
Ranked #313 out of 2,243 Natural Gas Power Plants Nationwide
Ranked #65 out of 799 Texas Power Plants
Ranked #56 out of 314 Texas Natural Gas Power Plants
Fuel Types Natural Gas : 88.2% Subbituminous Coal : 11.8%

Map of Harrington

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Harrington.

Create Your Account Today

Monthly Net Generation for Harrington

Harrington Details

Summary Information
Plant NameHarrington (6193)
Plant Address8400 N.Lakeside Dr., Amarillo, TX 79108
UtilitySouthwestern Public Service Co (17718)
Latitude, Longitude35.29816, -101.74719
Generation Dates on FileJan 2001 to Sep 2025
Initial Operation DateJanuary 1976
Annual Generation 2.3 TWh
Fuel Types Natural Gas : 88.2% Subbituminous Coal : 11.8%
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionMRO
Balancing AuthoritySouthwest Power Pool (SWPP)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water SourceMunicipality
Ash Impoundment No
Transmission / Distribution OwnerSouthwestern Public Service Co (17718) TX
Grid Voltage 230.00 kV
Energy StorageNo
 
Natural Gas Information
Pipeline Name ONEOK WES TEX TRANSMISSION LLC
Natural Gas StorageNo
Liquefied Natural Gas StorageNo

Generator 1 Details Operating January 1976

TechnologyNatural Gas Steam Turbine
Prime MoverSteam Turbine
OwnershipSingle Owner
RTO ISO LMP Node DesignationSPS.HARRNGTN1
RTO ISO Location Designation For Reporting Wholesale Sales DataSPS.HARRNGTN1
Nameplate Capacity360 MW
Nameplate Power Factor0.9
Summer Capacity339 MW
Winter Capacity339 MW
Minimum Load120 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1976
Planned RetirementDecember 2036
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Startup SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full LoadOVER
Planned New Prime MoverST
Planned Energy SourceNG
Planned New Nameplate Capacity360 MW
Planned RepowerFebruary 2025
Other Planned ModificationsNo
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceSUB / NG

Generator 2 Details Operating January 1978

TechnologyConventional Steam Coal
Prime MoverSteam Turbine
OwnershipSingle Owner
RTO ISO LMP Node DesignationSPS.HARRNGTN2
RTO ISO Location Designation For Reporting Wholesale Sales DataSPS.HARRNGTN2
Nameplate Capacity360 MW
Nameplate Power Factor0.9
Summer Capacity339 MW
Winter Capacity339 MW
Minimum Load120 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1978
Planned RetirementDecember 2038
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceSubbituminous Coal / Natural Gas
Startup SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full LoadOVER
Pulverized Coal TechnologyYes
Subcritical TechnologyYes
Planned New Prime MoverST
Planned Energy SourceNG
Planned New Nameplate Capacity360 MW
Planned RepowerMarch 2025
Other Planned ModificationsNo
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceSUB / NG

Generator 3 Details Operating January 1980

TechnologyConventional Steam Coal
Prime MoverSteam Turbine
OwnershipSingle Owner
RTO ISO LMP Node DesignationSPS.HARRNGTN3
RTO ISO Location Designation For Reporting Wholesale Sales DataSPS.HARRNGTN3
Nameplate Capacity360 MW
Nameplate Power Factor0.9
Summer Capacity340 MW
Winter Capacity340 MW
Minimum Load125 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1980
Planned RetirementDecember 2040
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceSubbituminous Coal / Natural Gas
Startup SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full LoadOVER
Pulverized Coal TechnologyYes
Subcritical TechnologyYes
Planned New Prime MoverST
Planned Energy SourceNG
Planned New Nameplate Capacity360 MW
Planned RepowerJune 2025
Other Planned ModificationsNo
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasNo
Multifuel Details
Cofire Energy SourceSUB / NG

Harrington Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Natural Gas.

RankPlant NamePlant LocationAnnual Generation
#303AncloteHoliday, FL2.1 TWh
#304Goldendale Generating StationGoldendale, WA2.1 TWh
#305YatesNewnan, GA2.1 TWh
#306Arthur Kill Generating StationStaten Island, NY2.1 TWh
#307Louisiana 1Baton Rouge, LA2.9 TWh
#308ChesterfieldChester, VA2.1 TWh
#309Sand HillAustin, TX2.1 TWh
#310Coyote SpringsBoardman, OR2.0 TWh
#311South Point Energy CenterMohave Valley, AZ2.0 TWh
#312PSEG Sewaren Generating StationSewaren, NJ2.0 TWh
#314Frontera Energy CenterMission, TX2.0 TWh
#315Hay RoadWilmington, DE2.0 TWh
#316Desert BasinCasa Grande, AZ2.0 TWh
#317Dow St Charles OperationsTaft, LA2.0 TWh
#318Lewis CreekWillis, TX1.9 TWh
#319Seminole (OK)Konowa, OK1.9 TWh
#320Watson CogenerationCarson, CA2.3 TWh
#321Apache StationCochise, AZ2.4 TWh
#322Jackson Generating StationJackson, MI1.9 TWh
#323Brooklyn Navy Yard CogenerationBrooklyn, NY1.9 TWh

Nearby Power Plants

Below are closest 20 power plants surrounding Harrington.

Plant NamePlant LocationAnnual GenerationDistance
Black Hawk StationBorger, TX1.3 TWh35.1 mi
Borger PlantBorger, TX46.6 GWh30.8 mi
Canadian Breaks, LLCVega, TX771.1 GWh32.8 mi
Colbeck's Corner, LLCGroom, TX799.5 GWh31.8 mi
Engineered Carbons Borger CogenBorger, TX80.2 GWh31 mi
Golden Spread Panhandle Wnd RchWilderado, TX181.7 GWh26.4 mi
GoodnightClaude, TX762.2 GWh27.6 mi
Grandview Wind Farm, LLCPanhandle, TX867.3 GWh25 mi
Llano Estacado Wind RanchWhite Deer, TX94.8 GWh30.2 mi
Majestic 1 Wind FarmPanhandle, TX365.1 GWh13.8 mi
Majestic II WindPanhandle, TX157.4 GWh11.3 mi
NicholsAmarillo, TX1.7 TWh1 mi
PantexAmarillo, TX7.0 GWh12.2 mi
Pattern Panhandle Wind 2 LLCPanhandle, TX614.0 GWh23.3 mi
Pattern Panhandle Wind LLCPanhandle, TX529.8 GWh29.2 mi
Ribeye Wind (11) LLCDumas, TX5.9 GWh37.8 mi
Route 66 Wind PlantPanhandle, TX608.2 GWh18.8 mi
Spinning Spur Wind LLCVegas, TX334.2 GWh26.1 mi
UL Advanced Wind Turbine Test FacilityCanyon, TX8.8 GWh23 mi
Wildorado Wind LLCVega, TX692.1 GWh31.4 mi