Horizon Hill Wind Project
TBD, Crescent, OK 73028Plant Summary Information
Horizon Hill Wind Project is ranked #40 out of 135 power plants in Oklahoma in terms of total annual net electricity generation.
Horizon Hill Wind Project generated 147.9 GWh during the 3-month period between August 2025 to November 2025.
| Plant Name | Horizon Hill Wind Project |
|---|---|
| Utility Name | Horizon Hill Wind, LLC |
| Location | Logan County, OK |
| Initial Operation Date | February 2024 |
| Last Update | Nov 2025 |
| Annual Generation | 612.7 GWh |
| Annual Consumption | 2.3 M MMBtu |
| Ranked #1,115 out of 12,574 Power Plants Nationwide | |
| Ranked #262 out of 1,370 Wind Power Plants Nationwide | |
| Ranked #40 out of 135 Oklahoma Power Plants | |
| Ranked #24 out of 69 Oklahoma Wind Power Plants | |
| Fuel Types | Wind |
Map of Horizon Hill Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Horizon Hill Wind Project.
Monthly Net Generation for Horizon Hill Wind Project
Horizon Hill Wind Project Details
| Summary Information | |
|---|---|
| Plant Name | Horizon Hill Wind Project (64339) |
| Plant Address | TBD, Crescent, OK 73028 |
| Utility | Horizon Hill Wind, LLC (63959) |
| Latitude, Longitude | 35.98938, -97.58951 |
| Generation Dates on File | Feb 2024 to Nov 2025 |
| Initial Operation Date | February 2024 |
| Annual Generation | 612.7 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Southwest Power Pool (SWPP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Oklahoma Gas & Electric Co (14063) OK |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator HHILL Details Operating February 2024
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 201.5 MW |
| Summer Capacity | 201.5 MW |
| Winter Capacity | 201.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 2024 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 34 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 34 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V162-5.6 |
| Design Wind Speed | 18 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 390 |
Horizon Hill Wind Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #252 | FPL Energy Illinois Wind LLC Hybrid | Shabbona, IL | 620.5 GWh |
| #253 | Chevelon Butte Wind Farm | Winslow, AZ | 622.0 GWh |
| #254 | Kelly Creek Wind Project | Cabery, IL | 621.9 GWh |
| #255 | Pilot Hill Wind Farm | Herscher, IL | 618.3 GWh |
| #256 | Mesteno | Rio Grande City, TX | 618.0 GWh |
| #257 | Headwaters Wind Farm LLC | Winchester, IN | 617.8 GWh |
| #258 | Dakota Range III Wind Project | Summit, SD | 615.9 GWh |
| #259 | Border Winds Wind Farm | Rolla, ND | 614.0 GWh |
| #260 | Pattern Panhandle Wind 2 LLC | Panhandle, TX | 614.0 GWh |
| #261 | Carousel Wind Farm LLC | Burlington, CO | 613.9 GWh |
| #263 | Aragonne Wind LLC | Santa Rosa, NM | 611.9 GWh |
| #264 | Route 66 Wind Plant | Panhandle, TX | 608.2 GWh |
| #265 | Cedar Creek II | New Raymer, CO | 606.6 GWh |
| #266 | Pioneer Hutt Wind Energy | Midland, TX | 606.1 GWh |
| #267 | Ledyard Windpower, LLC | Lakota, IA | 605.2 GWh |
| #268 | Weatherford Wind Energy Center | Weatherford, OK | 602.5 GWh |
| #269 | Stella Wind Farm | Armstrong, TX | 598.8 GWh |
| #270 | Merricourt Wind Energy Center | Kulm, ND | 598.4 GWh |
| #271 | Reloj del Sol Wind Farm | San Ygnacio, TX | 597.8 GWh |
| #272 | Prairie Breeze | Elgin, NE | 595.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Horizon Hill Wind Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Armadillo Flats Wind Project, LLC | Enid, OK | 734.9 GWh | 21.6 mi |
| Breckinridge Wind Project LLC | Enid, OK | 362.2 GWh | 34.1 mi |
| Cana Gas Processing Plant | Calumet, OK | 1.6 GWh | 42.6 mi |
| Canadian Hills Wind | El Rino, OK | 413.2 GWh | 34.8 mi |
| Chisholm View Wind Project | Hunter, OK | 859.8 GWh | 40.7 mi |
| Covington Solar Farm | Covington, OK | 18.6 GWh | 22.7 mi |
| Frontier | Oklahoma City, OK | 553.7 GWh | 37.9 mi |
| Horseshoe Lake | Harrah, OK | 614.9 GWh | 40.4 mi |
| King Plains Wind Project | Garber, OK | 577.1 GWh | 29.1 mi |
| Kingfisher | Kingfisher, OK | 173.0 MWh | 21 mi |
| Kingfisher Wind LLC | Kingfisher, OK | 924.1 GWh | 19.2 mi |
| Maverick Wind Project, LLC | Meno, OK | 840.8 GWh | 38.4 mi |
| Mustang | Oklahoma City, OK | 477.5 GWh | 36.2 mi |
| Red Dirt Wind Project | Hennessy, OK | 752.6 GWh | 11.7 mi |
| Redbud Power Plant | Luther, OK | 4.5 TWh | 29.2 mi |
| Sooner | Red Rock, OK | 2.9 TWh | 43.8 mi |
| Spring Creek Energy Center | Edmond, OK | 187.9 GWh | 17.5 mi |
| Stillwater Energy Center | Stillwater, OK | 138.8 GWh | 33.1 mi |
| Tinker | Oklahoma City, OK | 30.7 GWh | 41.5 mi |
| Willow Creek Wind (OK) | Morrison, OK | 46.4 GWh | 32.5 mi |