Lamesa Solar
1236 County Rd 20, Lamesa, TX 79331Plant Summary Information
Lamesa Solar is ranked #112 out of 219 solar farms in Texas in terms of total annual net electricity generation.
Lamesa Solar generated 30.9 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Lamesa Solar |
|---|---|
| Utility Name | Southern Power Co |
| Location | Dawson County, TX |
| Initial Operation Date | April 2017 |
| Last Update | Feb 2026 |
| Annual Generation | 214.0 GWh |
| Annual Consumption | 780.1 k MMBtu |
| Ranked #2,416 out of 12,637 Power Plants Nationwide | |
| Ranked #398 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #436 out of 820 Texas Power Plants | |
| Ranked #112 out of 219 Texas Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
RES America Developments Inc (2015 to 2015) Southern Power Co (2016 to 2024) |
Map of Lamesa Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lamesa Solar.
Monthly Net Generation for Lamesa Solar
Monthly Plant Fuel Consumption for Lamesa Solar
Lamesa Solar Details
| Summary Information | |
|---|---|
| Plant Name | Lamesa Solar (60372) |
| Plant Address | 1236 County Rd 20, Lamesa, TX 79331 |
| Utility | Southern Power Co (17650) |
| Latitude, Longitude | 32.71561, -101.92652 |
| Generation Dates on File | Apr 2017 to Feb 2026 |
| Initial Operation Date | April 2017 |
| Annual Generation | 214.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG16-125-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator LSPV1 Details Operating April 2017
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 102 MW |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2017 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 77 |
| DC Net Capacity | 130.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Lamesa Solar Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| BNB Lamesa Solar LLC | 30 Ivan Allen Jr. Blvd, NW, Atlanta, GA 30308 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #388 | East Pecos Solar | McCamey, TX | 220.2 GWh |
| #389 | Lapetus | Andrews, TX | 219.3 GWh |
| #390 | Ivanpah 2 | Nipton, CA | 229.2 GWh |
| #391 | Winfield Solar | Winfield, MO | 218.7 GWh |
| #392 | Ross County Solar, LLC | Greenfield, OH | 218.0 GWh |
| #393 | Henrietta Solar Project | Lemoore, CA | 218.0 GWh |
| #394 | Rosamond South 1 | Rosamond, CA | 205.6 GWh |
| #395 | Briar Creek Solar 1 | Corsicana, TX | 217.6 GWh |
| #396 | Happy Solar 1 | Searcy, AR | 216.4 GWh |
| #397 | BPL Crown Solar LLC | Chilton, TX | 214.7 GWh |
| #399 | Chicot Solar | Lake Village, AR | 213.4 GWh |
| #400 | Black Bear Solar 1 | Montgomery, AL | 213.3 GWh |
| #401 | Orange Grove | Jim Wells, TX | 212.6 GWh |
| #402 | Elektron Solar, LLC | Grantsville, UT | 212.3 GWh |
| #403 | BPL Sol Solar LLC | Chilton, TX | 211.9 GWh |
| #404 | Escalante Solar II, LLC | Milford, UT | 211.7 GWh |
| #405 | Iron Springs Solar, LLC | Cedar City, UT | 211.6 GWh |
| #406 | Martin County Solar Project, LLC | Pilgrim, KY | 211.5 GWh |
| #407 | Fern Solar LLC | Battleboro, NC | 211.4 GWh |
| #408 | Escalante Solar I, LLC | Milford, UT | 211.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lamesa Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bakke | Andrews, TX | 221.0 MWh | 46 mi |
| Big Spring Wind Power Facility | Big Spring, TX | 56.0 GWh | 47.1 mi |
| Brazos Wind Farm | Fluvanna, TX | 658.7 GWh | 48 mi |
| Bull Creek Wind | O'Donnell, TX | 265.2 GWh | 25 mi |
| C R Wing Cogen Plant | Big Spring, TX | 133.7 GWh | 42.4 mi |
| ENGIE Long Draw Solar LLC | Gail, TX | 513.5 GWh | 17.8 mi |
| Fluvanna | Fluvanna, TX | 534.3 GWh | 47.9 mi |
| Gopher Creek Wind Farm | Fluvanna, TX | 601.0 GWh | 43.1 mi |
| Gunsight Mountain Wind Energy LLC | Big Spring, TX | 460.7 GWh | 42.1 mi |
| Highpeak Solar 1 | Coahoma, TX | 13.8 GWh | 40.8 mi |
| Juno Solar Project | Lamesa, TX | 761.1 GWh | 31.4 mi |
| Lamesa II | Lamesa, TX | 117.1 GWh | 2.4 mi |
| Lapetus | Andrews, TX | 219.3 GWh | 46.9 mi |
| Mesquite Creek Wind | Lamesa, TX | 490.9 GWh | 10.8 mi |
| Post Wind Farm LP | Fluvanna, TX | 314.8 GWh | 43.5 mi |
| Sage Draw Wind | Wilson, TX | 1.2 TWh | 43.5 mi |
| Stanton Wind Energy LLC | Lenorah, TX | 253.9 GWh | 33.6 mi |
| Stephens Ranch Wind Energy LLC | O'Donnell, TX | 906.0 GWh | 21.8 mi |
| Tahoka Wind | Tahoka, TX | 1.2 TWh | 33.3 mi |
| Tumbleweed | Andrews, TX | 200.0 MWh | 44.6 mi |