Southside SD
6700 Fourche Dam, Little Rock, AR 72206Plant Summary Information
Southside SD is ranked #66 out of 71 solar farms in Arkansas in terms of total annual net electricity generation.
Southside SD generated 316.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Southside SD |
|---|---|
| Utility Name | Entegrity Solar Southside SD, LLC |
| Location | Pulaski County, AR |
| Initial Operation Date | June 2023 |
| Last Update | Dec 2025 |
| Annual Generation | 1.6 GWh |
| Annual Consumption | 5.6 k MMBtu |
| Ranked #11,567 out of 13,285 Power Plants Nationwide | |
| Ranked #6,360 out of 7,198 Solar Power Plants Nationwide | |
| Ranked #110 out of 117 Arkansas Power Plants | |
| Ranked #66 out of 71 Arkansas Solar Power Plants | |
| Fuel Types | Solar |
Map of Southside SD
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Southside SD.
Monthly Net Generation for Southside SD
Monthly Plant Fuel Consumption for Southside SD
Southside SD Details
| Summary Information | |
|---|---|
| Plant Name | Southside SD (67524) |
| Plant Address | 6700 Fourche Dam, Little Rock, AR 72206 |
| Utility | Entegrity Solar Southside SD, LLC (66246) |
| Latitude, Longitude | 34.72442, -92.1968 |
| Generation Dates on File | Jan 2024 to Dec 2025 |
| Initial Operation Date | June 2023 |
| Annual Generation | 1.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 23-345-001 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Entergy Arkansas LLC (814) AR |
| Grid Voltage | 13.20 kV |
| Energy Storage | No |
Generator 60334 Details Operating June 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1 MW |
| Summer Capacity | 1 MW |
| Winter Capacity | 0.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 15 |
| DC Net Capacity | 1.4 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | Yes |
| Virtual Net Metering DC Capacity | 1.4 MW |
Southside SD Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6350 | Star Garden | Starbuck, MN | 1.6 GWh |
| #6351 | Malmedal Solar Garden | Starbuck, MN | 1.6 GWh |
| #6352 | SMPA Solar 1 Community Solar | Bedrock, CO | 1.6 GWh |
| #6353 | Lyman Garden | Northfield, MN | 1.6 GWh |
| #6354 | Norton | Norton, MA | 1.6 GWh |
| #6355 | Brickyard Solar | Farmingdale, NJ | 1.6 GWh |
| #6356 | GSPP Imholte CSG | St. Cloud, MN | 1.6 GWh |
| #6357 | Villa Roma Rd #4 CSG | Delaware, NY | 1.6 GWh |
| #6358 | Jordan Energy-DFA Middlebury Center Plan | Middlebury Center, PA | 1.6 GWh |
| #6359 | City of Atwater NEM | Atwater, CA | 1.6 GWh |
| #6361 | Goodhue Community Solar Three LLC CSG | Zumbrota, MN | 1.6 GWh |
| #6362 | Letchworth Solar Project | Gainesville, NY | 1.6 GWh |
| #6363 | ZPD-PT Solar Project 2017-021 LLC Hybrid | Wilbraham, MA | 1.6 GWh |
| #6364 | NSF Edmeston Site 2 | South Edmeston, NY | 1.6 GWh |
| #6365 | Innovative Solar 48 | Maxton, NC | 1.6 GWh |
| #6366 | Sunnyside Ranch Community Solar Array | Carbondale, CO | 1.6 GWh |
| #6367 | Whitfield Cooper | Cohutta, GA | 1.6 GWh |
| #6368 | GSPP NESV, LLC | Attleboro, MA | 1.6 GWh |
| #6369 | ESIL-PFCHICAGO 2, LLC | Chicago, IL | 1.6 GWh |
| #6370 | Novel Historical Society Solar CSG | Sacred Heart, MN | 1.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Southside SD.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| C&L | Star City, AR | 2.2 GWh | 49.5 mi |
| Happy Solar 1 | Searcy, AR | 209.9 GWh | 43.1 mi |
| Harry L. Oswald | Little Rock, AR | 929.3 GWh | 9.2 mi |
| Hot Spring Generating Facility | Malvern, AR | 2.9 TWh | 48.3 mi |
| Lake Catherine | Jones Mill, AR | 336.2 GWh | 45 mi |
| Magnet Cove | Malvern, AR | 4.1 TWh | 41.5 mi |
| Murray | North Little Rock, AR | 116.4 GWh | 10.3 mi |
| NLRED 2MW | North Little Rock, AR | 4.5 GWh | 1.4 mi |
| NLRED 5MW | North Little Rock, AR | 11.3 GWh | 1.6 mi |
| Pine Bluff Energy Center | Pine Bluff, AR | 1.0 TWh | 38.8 mi |
| Redfield Solar | Sheridan, AR | 87.9 GWh | 31.4 mi |
| Remmel | Malvern, AR | 46.1 GWh | 44.7 mi |
| Searcy Solar Hybrid | Searcy, AR | 173.0 GWh | 45.4 mi |
| Searcy Water I | Searcy, AR | 1.8 GWh | 46.3 mi |
| Searcy Water II | Searcy, AR | 5.5 GWh | 42.9 mi |
| Stuttgart Solar | Stuttgart, AR | 149.0 GWh | 47.3 mi |
| Two Pine Landfill Gas Recovery | North Little Rock, AR | 29.8 GWh | 7.8 mi |
| Whillock | Morrilton, AR | 130.9 GWh | 43.7 mi |
| White Bluff | Redfield, AR | 2.9 TWh | 21.1 mi |
| Zeuber | Little Rock, AR | 7.0 GWh | 1.9 mi |