NLRED 2MW
7300 Industry Drive, North Little Rock, AR 72117Plant Summary Information
NLRED 2MW is ranked #66 out of 66 solar farms in Arkansas in terms of total annual net electricity generation.
NLRED 2MW generated 80.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | NLRED 2MW |
|---|---|
| Utility Name | Today's Power, Inc. |
| Location | Pulaski County, AR |
| Initial Operation Date | December 2024 |
| Last Update | Dec 2024 |
| Annual Generation | 80.0 MWh |
| Annual Consumption | 273 MMBtu |
| Ranked #12,166 out of 12,539 Power Plants Nationwide | |
| Ranked #6,327 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #112 out of 112 Arkansas Power Plants | |
| Ranked #66 out of 66 Arkansas Solar Power Plants | |
| Fuel Types | Solar |
Map of NLRED 2MW
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for NLRED 2MW.
Monthly Net Generation for NLRED 2MW
NLRED 2MW Details
| Summary Information | |
|---|---|
| Plant Name | NLRED 2MW (68701) |
| Plant Address | 7300 Industry Drive, North Little Rock, AR 72117 |
| Utility | Today's Power, Inc. (61204) |
| Latitude, Longitude | 34.74116, -92.18193 |
| Generation Dates on File | Dec 2024 to Dec 2024 |
| Initial Operation Date | December 2024 |
| Annual Generation | 80.0 MWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | City of North Little Rock - (AR) (13718) AR |
| Grid Voltage | 13.20 kV / 0.48 kV |
| Energy Storage | No |
Generator NLR2 Details Operating December 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 2 MW |
| Summer Capacity | 2 MW |
| Winter Capacity | 2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2024 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 2.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
NLRED 2MW Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6317 | Buck Run | Clarkson, NY | 114.0 MWh |
| #6318 | Kankakee Solar 3 | Manteno, IL | 107.0 MWh |
| #6319 | Mars Hill | Mars Hill, ME | 95.0 MWh |
| #6320 | William G Mennen Sports Solar | Morristown, NJ | 90.0 MWh |
| #6321 | Enfield Solar Site 2 | Enfield, NY | 90.0 MWh |
| #6322 | Tipton 2 - (CA) | Tipton, CA | 83.0 MWh |
| #6323 | Dakota | Rock City, IL | 82.0 MWh |
| #6324 | Clinton Solar 2b | Centralia, IL | 81.0 MWh |
| #6325 | HCE Millboro Springs Solar, LLC | Millboro, VA | 80.0 MWh |
| #6326 | Auburn Solar WI, LLC | Campbellsport, WI | 80.0 MWh |
| #6328 | ECA CO Greeley | Greeley, CO | 78.0 MWh |
| #6329 | Agua Fria | Glendale, AZ | 243.5 GWh |
| #6330 | Walden Solar Maine V | Leeds, ME | 76.0 MWh |
| #6331 | Beaver Solar LLC | Beaver, PA | 73.0 MWh |
| #6332 | Princeton Energy Center, LLC | Plainsboro, NJ | 24.6 GWh |
| #6333 | Madera Community Hospital | Madera, CA | 72.0 MWh |
| #6334 | Morey Road | Lake City, MI | 71.0 MWh |
| #6335 | Acer | Madrid, NY | 68.0 MWh |
| #6336 | Pivot Energy PPA 22 | Visalia, CA | 68.0 MWh |
| #6337 | Bolthouse S&P and Rowen Farms Solar | Palmdale, CA | 67.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding NLRED 2MW.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| FECC Solar Benton | Benton, AR | 967.0 MWh | 23.6 mi |
| Happy Solar 1 | Searcy, AR | 221.2 GWh | 41.7 mi |
| Harry L. Oswald | Little Rock, AR | 1.1 TWh | 10.5 mi |
| Hot Spring Generating Facility | Malvern, AR | 2.6 TWh | 49.7 mi |
| Lake Catherine | Jones Mill, AR | 299.6 GWh | 46.3 mi |
| Magnet Cove | Malvern, AR | 3.6 TWh | 42.8 mi |
| Murray | North Little Rock, AR | 113.5 GWh | 10.6 mi |
| NLRED 5MW | North Little Rock, AR | 2.9 GWh | 0.2 mi |
| Pine Bluff Energy Center | Pine Bluff, AR | 827.1 GWh | 39.5 mi |
| Pine Bluff Mill | Pine Bluff, AR | 289.0 GWh | 39.2 mi |
| Remmel | Malvern, AR | 30.4 GWh | 46 mi |
| Searcy Solar Hybrid | Searcy, AR | 206.5 GWh | 43.9 mi |
| Searcy Water I | Searcy, AR | 834.0 MWh | 44.8 mi |
| Searcy Water II | Searcy, AR | 3.5 GWh | 41.4 mi |
| Southside SD | Little Rock, AR | 1.7 GWh | 1.4 mi |
| Stuttgart Solar | Stuttgart, AR | 155.0 GWh | 47.1 mi |
| Two Pine Landfill Gas Recovery | North Little Rock, AR | 27.2 GWh | 6.5 mi |
| Whillock | Morrilton, AR | 139.3 GWh | 43.6 mi |
| White Bluff | Redfield, AR | 3.1 TWh | 22.1 mi |
| Zeuber | Little Rock, AR | 7.3 GWh | 3.4 mi |