Bayou Cogen Plant
11777 Bay Area Blvd, Pasadena, TX 77507Plant Summary Information
Bayou Cogen Plant is ranked #50 out of 308 natural gas power plants in Texas in terms of total annual net electricity generation.
Bayou Cogen Plant is comprised of 4 generators and generated 566.7 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Bayou Cogen Plant |
|---|---|
| Utility Name | Air Liquide Large Industries U S LP |
| Location | Harris County, TX |
| Initial Operation Date | December 1984 |
| Last Update | Mar 2026 |
| Annual Generation | 2.3 TWh |
| Annual Consumption | 36.4 M MMBtu |
| Ranked #466 out of 12,332 Power Plants Nationwide | |
| Ranked #301 out of 2,179 Natural Gas Power Plants Nationwide | |
| Ranked #62 out of 814 Texas Power Plants | |
| Ranked #50 out of 308 Texas Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 91.5% Other Gas : 8.5% |
Map of Bayou Cogen Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bayou Cogen Plant.
Monthly Net Generation for Bayou Cogen Plant
Monthly Plant Fuel Consumption for Bayou Cogen Plant
Bayou Cogen Plant Details
| Summary Information | |
|---|---|
| Plant Name | Bayou Cogen Plant (10298) |
| Plant Address | 11777 Bay Area Blvd, Pasadena, TX 77507 |
| Utility | Air Liquide Large Industries U S LP (327) |
| Latitude, Longitude | 29.6225, -95.0458 |
| Generation Dates on File | Jan 2001 to Mar 2026 |
| Initial Operation Date | December 1984 |
| Annual Generation | 2.3 TWh |
| Fuel Types | Natural Gas : 91.5% Other Gas : 8.5% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | Yes |
| FERC Cogeneration Docket Number | 83-403-000 |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Chemical Manufacturing (325) |
| Sector | Industrial CHP (7) |
| Water Source | Coastal Water Authority |
| Ash Impoundment | No |
| Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name |
HOUSTON PL CO LP KINDER MORGAN TEJAS PIPELINE LLC KINDER MORGAN TEXAS PIPELINE LLC |
| Natural Gas Storage | No |
Generator GT1 Details Operating May 2014
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 79.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 75 MW |
| Winter Capacity | 93 MW |
| Minimum Load | 65 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2014 |
| Combined Heat & Power | Yes |
|---|---|
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Other Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / OG |
|---|---|
Generator GT3 Details Operating January 2015
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 79.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 75 MW |
| Winter Capacity | 93 MW |
| Minimum Load | 65 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 2015 |
| Combined Heat & Power | Yes |
|---|---|
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Other Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / OG |
|---|---|
Generator GT4 Details Operating January 2015
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 79.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 75 MW |
| Winter Capacity | 93 MW |
| Minimum Load | 65 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 2015 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Other Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / OG |
|---|---|
Generator GT2 Details Operating January 2016
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 79.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 75 MW |
| Winter Capacity | 93 MW |
| Minimum Load | 65 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 2016 |
| Combined Heat & Power | Yes |
|---|---|
| Sector Name | Industrial CHP (7) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas / Other Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Other Planned Modifications | No |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / OG |
|---|---|
Bayou Cogen Plant Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #291 | Hinds Energy Facility | Jackson, MS | 2.2 TWh |
| #292 | Holland Energy Facility | Beecher City, IL | 2.2 TWh |
| #293 | Sunrise Power LLC | Fellows, CA | 2.2 TWh |
| #294 | Rolling Hills Generating | Wilkesville, OH | 2.2 TWh |
| #295 | Intermountain Power Project | Delta, UT | 4.5 TWh |
| #296 | PSEG Sewaren Generating Station | Sewaren, NJ | 2.2 TWh |
| #297 | Greater Des Moines | Pleasant Hill, IA | 2.2 TWh |
| #298 | Astoria Energy II | Astoria, NY | 2.3 TWh |
| #299 | Chalk Point Power | Aquasco, MD | 2.2 TWh |
| #300 | Seminole (OK) | Konowa, OK | 2.1 TWh |
| #302 | Harrington | Amarillo, TX | 2.1 TWh |
| #303 | Goldendale Generating Station | Goldendale, WA | 2.1 TWh |
| #304 | Yates | Newnan, GA | 2.1 TWh |
| #305 | Chesterfield | Chester, VA | 2.2 TWh |
| #306 | Anclote | Holiday, FL | 2.1 TWh |
| #307 | Colusa Generating Station | Maxwell, CA | 2.1 TWh |
| #308 | Colorado Bend Energy Center | Wharton, TX | 2.1 TWh |
| #309 | Lewis Creek | Willis, TX | 2.0 TWh |
| #310 | Coyote Springs II | Boardman, OR | 2.0 TWh |
| #311 | Gulf Clean Energy Center | Pensacola, FL | 2.0 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bayou Cogen Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bacliff | Bacliff, TX | 103.0 GWh | 9.7 mi |
| Cedar Bayou | Baytown, TX | 1.8 TWh | 11.4 mi |
| Deer Park Energy Center | Deer Park, TX | 7.8 TWh | 8.2 mi |
| Exelon LaPorte Generating Station | LaPorte, TX | 164.9 GWh | 5.8 mi |
| ExxonMobil Baytown Refinery | Baytown, TX | 1.2 TWh | 9.5 mi |
| ExxonMobil Baytown Turbine | Baytown, TX | 2.6 TWh | 9.7 mi |
| HEB00028 | League City, TX | 223.0 MWh | 11.2 mi |
| HEB00769 | Webster, TX | 177.0 MWh | 7.9 mi |
| Houston Chemical Complex Battleground | Houston, TX | 1.8 TWh | 7.9 mi |
| NASA Johnson Space Center CHP | Houston, TX | 82.7 GWh | 4.9 mi |
| Pasadena Cogeneration | Pasadena, TX | 5.0 TWh | 10.6 mi |
| San Jacinto Steam Electric Station | La Porte, TX | 857.9 GWh | 5 mi |
| Shell Deer Park | Deer Park, TX | 1.0 TWh | 8.6 mi |
| WAL1062 | Friendswood, TX | 237.0 MWh | 8.4 mi |
| WAL194 | Baytown, TX | 209.0 MWh | 11.5 mi |
| WAL2724 | Pasadena, TX | 177.0 MWh | 11 mi |
| WAL3298 | Kemah, TX | 209.0 MWh | 6.2 mi |
| WAL5116 | Deer Park, TX | 263.0 MWh | 4.3 mi |
| WAL5388 | League City, TX | 128.0 MWh | 10.9 mi |
| WAL752 | Pasadena, TX | 183.0 MWh | 7.1 mi |