Beaver
80997 Kallunki Rd, Clatskanie, OR 97016Plant Summary Information
Beaver is ranked #13 out of 274 power plants in Oregon in terms of total annual net electricity generation.
Beaver is comprised of 8 generators and generated 359.0 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Beaver |
|---|---|
| Utility Name | Portland General Electric Co |
| Location | Columbia County, OR |
| Initial Operation Date | August 1974 |
| Last Update | Dec 2024 |
| Annual Generation | 1.7 TWh |
| Annual Consumption | 20.0 M MMBtu |
| Ranked #559 out of 12,539 Power Plants Nationwide | |
| Ranked #356 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #13 out of 274 Oregon Power Plants | |
| Ranked #8 out of 18 Oregon Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 99.2% Distillate Fuel Oil : 0.8% |
Map of Beaver
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Beaver.
Monthly Net Generation for Beaver
Beaver Details
| Summary Information | |
|---|---|
| Plant Name | Beaver (8073) |
| Plant Address | 80997 Kallunki Rd, Clatskanie, OR 97016 |
| Utility | Portland General Electric Co (15248) |
| Latitude, Longitude | 46.1724, -123.17392 |
| Generation Dates on File | Jan 2001 to Dec 2024 |
| Initial Operation Date | August 1974 |
| Annual Generation | 1.7 TWh |
| Fuel Types | Natural Gas : 99.2% Distillate Fuel Oil : 0.8% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | Portland General Electric Company (PGE) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Columbia River |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Portland General Electric Co (15248) OR |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | NORTHWEST NATURAL GAS CO |
| Pipeline Name |
PACIFIC GAS PACIFIC GAS |
| Natural Gas Storage | No |
Generator 1 Details Operating August 1974
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| RTO ISO LMP Node Designation | BRP1_2_GNODE1-7 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BRP1_2_BEAVER1-7 |
| Nameplate Capacity | 68.3 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 55.3 MW |
| Winter Capacity | 63 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 1974 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 55.3 MW |
| Net Winter Capacity With Natural Gas | 63 MW |
| Net Summer Capacity With Oil | 55.3 MW |
| Net Winter Capacity With Oil | 63 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator 2 Details Operating August 1974
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| RTO ISO LMP Node Designation | BRP1_2_GNODE1-7 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BRP1_2_BEAVER1-7 |
| Nameplate Capacity | 68.3 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 55.3 MW |
| Winter Capacity | 63 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 1974 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 55.3 MW |
| Net Winter Capacity With Natural Gas | 63 MW |
| Net Summer Capacity With Oil | 55.3 MW |
| Net Winter Capacity With Oil | 63 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator 3 Details Operating August 1974
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| RTO ISO LMP Node Designation | BRP1_2_GNODE1-7 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BRP1_2_BEAVER1-7 |
| Nameplate Capacity | 68.3 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 55.3 MW |
| Winter Capacity | 63 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 1974 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 55.3 MW |
| Net Winter Capacity With Natural Gas | 63 MW |
| Net Summer Capacity With Oil | 55.3 MW |
| Net Winter Capacity With Oil | 63 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator 4 Details Operating August 1974
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| RTO ISO LMP Node Designation | BRP1_2_GNODE1-7 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BRP1_2_BEAVER1-7 |
| Nameplate Capacity | 68.3 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 55.3 MW |
| Winter Capacity | 63 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 1974 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 55.3 MW |
| Net Winter Capacity With Natural Gas | 63 MW |
| Net Summer Capacity With Oil | 55.3 MW |
| Net Winter Capacity With Oil | 63 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator 5 Details Operating August 1974
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| RTO ISO LMP Node Designation | BRP1_2_GNODE1-7 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BRP1_2_BEAVER1-7 |
| Nameplate Capacity | 68.3 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 55.3 MW |
| Winter Capacity | 63 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 1974 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 55.3 MW |
| Net Winter Capacity With Natural Gas | 63 MW |
| Net Summer Capacity With Oil | 55.3 MW |
| Net Winter Capacity With Oil | 63 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator 6 Details Operating August 1974
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| RTO ISO LMP Node Designation | BRP1_2_GNODE1-7 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BRP1_2_BEAVER1-7 |
| Nameplate Capacity | 68.3 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 55.3 MW |
| Winter Capacity | 63 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 1974 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 55.3 MW |
| Net Winter Capacity With Natural Gas | 63 MW |
| Net Summer Capacity With Oil | 55.3 MW |
| Net Winter Capacity With Oil | 63 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator 7 Details Operating November 1977
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Duct Burners | No |
| RTO ISO LMP Node Designation | BRP1_2_GNODE1-7 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BRP1_2_BEAVER1-7 |
| Nameplate Capacity | 176.4 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 137 MW |
| Winter Capacity | 139 MW |
| Minimum Load | 10 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 1977 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 8 Details Operating August 2001
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | BRP1_2_GNODE8 |
| Nameplate Capacity | 24.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 24 MW |
| Winter Capacity | 24 MW |
| Minimum Load | 17 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 2001 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Beaver Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #346 | Ferndale Generating Station | Ferndale, WA | 1.7 TWh |
| #347 | Nichols | Amarillo, TX | 1.7 TWh |
| #348 | PPG Powerhouse C | Lake Charles, LA | 1.7 TWh |
| #349 | Nueces Bay | Corpus Christi, TX | 1.7 TWh |
| #350 | Frederickson Power LP | Tacoma, WA | 1.7 TWh |
| #351 | Rockingham County CT Station | Reidsville, NC | 1.7 TWh |
| #352 | Moselle | Moselle, MS | 1.7 TWh |
| #353 | C D McIntosh Jr | Lakeland, FL | 1.7 TWh |
| #354 | Treasure Coast Energy Center | Ft. Pierce, FL | 1.7 TWh |
| #355 | Salem Harbor Power Development LP | Salem, MA | 1.7 TWh |
| #357 | West Lorain | Lorain, OH | 1.7 TWh |
| #358 | Luna Energy Facility | Deming, NM | 1.7 TWh |
| #359 | Mustang Station Unit 4 | Denver City, TX | 1.7 TWh |
| #360 | Sutter Energy Center | Yuba City, CA | 1.7 TWh |
| #361 | Tiverton Power Plant | Tiverton, RI | 1.7 TWh |
| #362 | Ennis Power Company LLC | Ennis, TX | 1.7 TWh |
| #363 | Newington Energy Center | Newington, NH | 1.7 TWh |
| #364 | Lake Hubbard | Sunnyvale, TX | 1.7 TWh |
| #365 | Haynes | Long Beach, CA | 1.6 TWh |
| #366 | Shell Chemical Appalachia LLC | Monaca, PA | 1.6 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Beaver.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Chehalis Generating Facility | Chehalis, WA | 2.6 TWh | 33.5 mi |
| Cowlitz Falls | Randle, WA | 196.3 GWh | 54.7 mi |
| Georgia-Pacific Wauna Mill | Clatskanie, OR | 172.2 GWh | 11.2 mi |
| Longview Fibre | Longview, WA | 235.4 GWh | 13.1 mi |
| Mayfield | Silver Creek, WA | 576.4 GWh | 36.1 mi |
| Merwin | Ariel, WA | 467.3 GWh | 33.2 mi |
| MilfordSolar OR | Forest Grove, OR | 4.6 GWh | 42 mi |
| Mint Farm Generating Station | Longview, WA | 2.3 TWh | 9.3 mi |
| Mossyrock | Silver Creek, WA | 783.2 GWh | 43.6 mi |
| Nippon Dynawave Packaging Longview WA | Longview, WA | 273.7 GWh | 10.2 mi |
| O'Neill Creek Solar | Gaston, OR | 3.4 GWh | 48.4 mi |
| Oregon Convention Center | Portland, OR | 1.6 GWh | 50.8 mi |
| Port Westward | Clatskanie, OR | 3.3 TWh | 0.5 mi |
| Port Westward Unit 2 | Clatskanie, OR | 1.1 TWh | 0.5 mi |
| River Road Gen Plant | Vancouver, WA | 1.5 TWh | 42.1 mi |
| Skookumchuck | Tenino, WA | 2.2 GWh | 47.5 mi |
| Skookumchuck Wind Facility | Rainier, WA | 391.7 GWh | 52.8 mi |
| Swift 1 | Cougar, WA | 459.1 GWh | 47.2 mi |
| Transalta Centralia Generation | Centralia, WA | 3.3 TWh | 43 mi |
| Yale | Amboy, WA | 488.4 GWh | 42.7 mi |