Allora Solar, LLC
1140 Crout Pond Way, Gilbert, SC 29054Plant Summary Information
Allora Solar, LLC is ranked #33 out of 192 power plants in South Carolina in terms of total annual net electricity generation.
Allora Solar, LLC generated 33.7 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Allora Solar, LLC |
---|---|
Utility Name | Allora Solar, LLC |
Location | Lexington County, SC |
Initial Operation Date | January 2023 |
Last Update | Mar 2025 |
Annual Generation | 152.9 GWh |
Annual Consumption | 567.8 k MMBtu |
Ranked #2,716 out of 12,288 Power Plants Nationwide | |
Ranked #445 out of 6,174 Solar Power Plants Nationwide | |
Ranked #33 out of 192 South Carolina Power Plants | |
Ranked #5 out of 115 South Carolina Solar Power Plants | |
Fuel Types | Solar |
Map of Allora Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Allora Solar, LLC.
Monthly Net Generation for Allora Solar, LLC
Allora Solar, LLC Details
Summary Information | |
---|---|
Plant Name | Allora Solar, LLC (63808) |
Plant Address | 1140 Crout Pond Way, Gilbert, SC 29054 |
Utility | Allora Solar, LLC (63494) |
Latitude, Longitude | 33.89934, -81.40047 |
Generation Dates on File | Feb 2023 to Mar 2025 |
Initial Operation Date | January 2023 |
Annual Generation | 152.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 19-163-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | South Carolina Public Service Authority (SC) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | South Carolina Public Service Authority (17543) SC |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator PGR30 Details Operating January 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 75 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 75 MW |
Winter Capacity | 75 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Bifacial | Yes |
DC Net Capacity | 98.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Allora Solar, LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#435 | Crescent Dunes Solar Energy | Tonopah, NV | 154.4 GWh |
#436 | Columbia Solar Power Plant | Fort White, FL | 154.3 GWh |
#437 | Caloosahatchee | Clewiston, FL | 154.3 GWh |
#438 | Gutenberg Solar | Garysburg, NC | 154.0 GWh |
#439 | Immokalee | Immokalee, FL | 153.8 GWh |
#440 | Sandy Creek Solar Power Plant | Panama City, FL | 153.8 GWh |
#441 | Regulus Solar Project | Bakersfield, CA | 153.6 GWh |
#442 | Okeechobee Solar | Vero Beach, FL | 153.6 GWh |
#443 | Hobnail Solar | Hephzibah, GA | 153.5 GWh |
#444 | High Springs Solar Power Plant | High Springs, FL | 153.4 GWh |
#446 | Midlands | St. Matthews, SC | 152.7 GWh |
#447 | Pelican Solar Center | Ft. Pierce, FL | 152.4 GWh |
#448 | Pink Trial Solar Energy Center | Port St. Lucie, FL | 152.0 GWh |
#449 | Solar Star California, XLI, LLC | Rosamond, CA | 151.9 GWh |
#450 | Titan Solar 1 (CA) | Borrego Springs, CA | 151.9 GWh |
#451 | Mesquite Solar 4, LLC | Tonopah, AZ | 151.1 GWh |
#452 | Bluefield Preserve Solar | Okeechobee, FL | 150.6 GWh |
#453 | Bay Trail Solar Power Plant | Crystal River, FL | 150.5 GWh |
#454 | River Bend Solar, LLC | Florence, AL | 150.2 GWh |
#455 | Santa Fe Solar Power Plant | Fort White, FL | 150.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Allora Solar, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Beulah Solar | Batesburg, SC | 142.7 GWh | 10.3 mi |
Champion Solar | Pelion, SC | 20.9 GWh | 10.7 mi |
Coit GT | Columbia, SC | 606.0 MWh | 21.4 mi |
Columbia Energy Center (SC) | Gaston, SC | 3.1 TWh | 22 mi |
Diamond Solar | Pelion, SC | 8.5 GWh | 10.7 mi |
Fairfield Pumped Storage | Jenkinsville, SC | 501.0 GWh | 28.4 mi |
Gaston II | Swansea, SC | 10.1 GWh | 18.6 mi |
Gaston Solar I - SC | Gaston, SC | 16.6 GWh | 18.7 mi |
Gunsight Solar, LLC | Swansea, SC | 168.4 GWh | 21.4 mi |
Hecate Energy West Newberry, LLC | Newberry, SC | 6.4 GWh | 28.1 mi |
McMeekin | Columbia, SC | 793.9 GWh | 15.1 mi |
Odyssey Solar | Pelion, SC | 11.6 GWh | 10.8 mi |
Otarre Solar Park | Cayce, SC | 2.6 GWh | 20.1 mi |
Parr Hydro | Jenkinsville, SC | 51.1 GWh | 25.3 mi |
Saluda Lexington | Columbia, SC | 143.3 GWh | 14.9 mi |
Saluda Solar II | Saluda, SC | 6.0 GWh | 20.9 mi |
Saluda Solar, LLC | Saluda, SC | 13.1 GWh | 22.4 mi |
Shaw Creek Solar, LLC | Aiken, SC | 169.0 GWh | 25.6 mi |
Swamp Fox Solar | Pelion, SC | 22.8 GWh | 11.1 mi |
V C Summer | Jenkinsville, SC | 7.3 TWh | 28 mi |