Lapetus

7351 Northwest 2001, Andrews, TX 79714

Plant Summary Information

Lapetus is ranked #104 out of 201 solar farms in Texas in terms of total annual net electricity generation.

Lapetus generated 71.2 GWh during the 3-month period between June 2025 to September 2025.

Plant NameLapetus
Utility NameDuke Energy Renewables Services
LocationAndrews County, TX
Initial Operation DateDecember 2019
Last Update Sep 2025
Annual Generation 226.2 GWh
Annual Consumption 839.1 k MMBtu
Ranked #2,322 out of 12,539 Power Plants Nationwide
Ranked #361 out of 6,400 Solar Power Plants Nationwide
Ranked #420 out of 799 Texas Power Plants
Ranked #104 out of 201 Texas Solar Power Plants
Fuel Types Solar
Previous Operator Lapetus Energy Project LLC (2018 to 2021)
Duke Energy Renewables Services (2022 to 2024)

Map of Lapetus

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lapetus.

Create Your Account Today

Monthly Net Generation for Lapetus

Lapetus Details

Summary Information
Plant NameLapetus (62448)
Plant Address7351 Northwest 2001, Andrews, TX 79714
UtilityDuke Energy Renewables Services (65411)
Latitude, Longitude32.46005, -102.67281
Generation Dates on FileDec 2019 to Sep 2025
Initial Operation DateDecember 2019
Annual Generation 226.2 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc. (ERCO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerOncor Electric Delivery Company LLC (44372) TX
Grid Voltage 138.00 kV
Energy StorageNo

Generator LAP Details Operating December 2019

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipWholly Owned by Other Entity
Nameplate Capacity100 MW
Summer Capacity100 MW
Winter Capacity100 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2019
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Single Axis TrackingYes
Azimuth Angle180
DC Net Capacity133 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Lapetus Plant Owners

Owner NameAddressOwnership
Lapetus Energy Project, LLC550 S. Caldwell Street, NAS09, Suite 925, Charlotte, NC 28202100.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#351Comanche SolarPueblo, CO230.4 GWh
#352Albemarle Beach SolarRoper, NC229.9 GWh
#353Bright Arrow Solar, LLCSulphur Springs, TX226.3 GWh
#354SR Arlington IIBlakely, GA228.4 GWh
#355Swift Air Solar IGoldsmith, TX228.1 GWh
#356Harquahala Sun Solar ProjectTonopah, AZ228.0 GWh
#357Walnut Bend Solar Station PVMoro, AR227.5 GWh
#358Alamo 6Fort Stockton, TX227.3 GWh
#359SR Clay, LLCFort Gaines, GA227.1 GWh
#360Assembly Solar II LLCLennon, MI226.8 GWh
#362Three Peaks PowerCedar City, UT225.8 GWh
#363Prairie Mist SolarMontrose, AR225.1 GWh
#364Blue Bird Solar, LLCWarrenton, MO224.2 GWh
#365Butler Solar Project 103Butler, GA223.7 GWh
#366Great Cove Solar IISaint Thomas, PA223.3 GWh
#367Lamesa SolarLamesa, TX223.3 GWh
#368Happy Solar 1Searcy, AR221.2 GWh
#369Techren Solar I LLCBoulder, NV220.9 GWh
#370Pixley Solar EnergyPixley, KS220.1 GWh
#371Enterprise Solar, LLCNewcastle, UT220.1 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Lapetus.

Plant NamePlant LocationAnnual GenerationDistance
2W Permian Solar Project HybridAndrews, TX974.1 GWh25.2 mi
BakkeAndrews, TX221.0 MWh13.7 mi
Ector County Energy CenterGoldsmith, TX648.7 GWh27.5 mi
FrankelAndrews, TX165.0 MWh8.4 mi
GoldsmithGoldsmith, TX184.0 MWh33.6 mi
Jumbo Hill Wind ProjectAndrews, TX595.9 GWh16.9 mi
MaddoxHobbs, NM536.7 GWh40.6 mi
Mustang StationDenver City, TX2.6 TWh35.7 mi
Mustang Station Unit 4Denver City, TX1.7 TWh35.8 mi
N. Mary FrancisOdessa, TX216.0 MWh39.8 mi
Notrees Windpower HybridGoldsmith, TX264.5 GWh33.4 mi
Oxy Renewable Energy - GoldsmithGoldsmith, TX40.5 GWh31.8 mi
Prospero SolarAndrews, TX758.9 GWh15.4 mi
Prospero Solar IIAndrews, TX671.4 GWh16.2 mi
SPS1 DollarhideJal, NM23.0 GWh35.6 mi
SPS2 JalJal, NM21.1 GWh35.4 mi
SPS3 LeaEunice, NM23.0 GWh37.9 mi
SPS4 MonumentMonument, NM22.9 GWh39.8 mi
TumbleweedAndrews, TX200.0 MWh10.1 mi
Wasson CO2 Removal PlantDenver City, TX145.6 GWh38.3 mi