Directory of Power Plants in Ohio
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Cardinal | Cardinal Operating Company | Brillant, OH | PJM Interconnection, LLC (PJM) | 9.4 TWh | Jan 1967 | Mar 2025 | Bituminous Coal : 99.6% |
Miami Fort | Luminant Miami Fort | North Bend, OH | PJM Interconnection, LLC (PJM) | 6.4 TWh | Oct 1960 | Mar 2025 | Bituminous Coal : 99.8% |
Kyger Creek | Ohio Valley Electric Corp | Cheshire, OH | PJM Interconnection, LLC (PJM) | 5.0 TWh | Jan 1955 | Mar 2025 | Bituminous Coal : 93.9% Subbituminous Coal : 5.9% |
Perry | Energy Harbor Nuclear Generation LLC | Perry, OH | PJM Interconnection, LLC (PJM) | 9.6 TWh | Oct 1987 | Mar 2025 | Nuclear |
Davis Besse | Energy Harbor Nuclear Generation LLC | Oak Harbor, OH | PJM Interconnection, LLC (PJM) | 7.9 TWh | Oct 1977 | Mar 2025 | Nuclear |
Woodsdale | Duke Energy Kentucky Inc | Trenton, OH | PJM Interconnection, LLC (PJM) | 369.5 GWh | Apr 1992 | Mar 2025 | Natural Gas : 98.5% Distillate Fuel Oil : 1.5% |
Gavin Power, LLC | Gavin Power, LLC | Cheshire, OH | PJM Interconnection, LLC (PJM) | 12.2 TWh | Sep 1974 | Mar 2025 | Bituminous Coal : 99.5% Distillate Fuel Oil : 0.5% |
Cleveland Works | Cleveland Cliffs | Cleveland, OH | PJM Interconnection, LLC (PJM) | 346.1 GWh | Dec 1949 | Mar 2025 | Blast Furnace Gas : 59.7% Natural Gas : 40.3% |
Sauder Power Plant | Sauder Woodworking Co | Archbold, OH | PJM Interconnection, LLC (PJM) | 7.6 GWh | Sep 1993 | Mar 2025 | Wood/Wood Waste Solids : 99.2% Natural Gas : 0.8% |
Dresden Energy Facility | Appalachian Power Co | Dresden, OH | PJM Interconnection, LLC (PJM) | 4.6 TWh | Jan 2012 | Mar 2025 | Natural Gas |
Washington Energy Facility | Dynegy Washington Energy Facility | Beverly, OH | PJM Interconnection, LLC (PJM) | 5.2 TWh | May 2002 | Mar 2025 | Natural Gas |
Waterford Power, LLC | Waterford Power, LLC | Waterford, OH | PJM Interconnection, LLC (PJM) | 6.4 TWh | Jul 2003 | Mar 2025 | Natural Gas |
Fremont Energy Center | American Mun Power-Ohio, Inc | Fremont, OH | PJM Interconnection, LLC (PJM) | 4.2 TWh | Dec 2011 | Mar 2025 | Natural Gas |
Hanging Rock Energy Facility | Dynegy Hanging Rock Energy Facility | Ironton, OH | PJM Interconnection, LLC (PJM) | 8.0 TWh | May 2003 | Mar 2025 | Natural Gas |
Ashtabula | DTE Ashtabula, LLC | Ashtabula, OH | PJM Interconnection, LLC (PJM) | 168.0 GWh | Jan 2001 | Mar 2025 | Natural Gas |
Wyandot Solar Farm | Wyandot Solar LLC | Upper Sandusky, OH | PJM Interconnection, LLC (PJM) | 11.5 GWh | Mar 2010 | Mar 2025 | Solar |
Blue Creek Wind Project | Avangrid Renewables LLC | Paulding, OH | PJM Interconnection, LLC (PJM) | 802.3 GWh | Nov 2011 | Mar 2025 | Wind |
Paulding Wind Farm II | Paulding Wind Farm II LLC | Payne, OH | PJM Interconnection, LLC (PJM) | 318.7 GWh | Jun 2011 | Mar 2025 | Wind |
Central Utility Plant Cincinnati | University of Cincinnati | Cincinnati, OH | PJM Interconnection, LLC (PJM) | 217.3 GWh | May 2004 | Mar 2025 | Natural Gas : 99.2% Distillate Fuel Oil : 0.8% |
East Campus Utility Plant | University of Cincinnati | Cincinnati, OH | PJM Interconnection, LLC (PJM) | 129.4 MWh | Jun 2006 | Mar 2025 | Distillate Fuel Oil |
Summit Street Power Plant | Kent State University | Kent, OH | PJM Interconnection, LLC (PJM) | 34.1 GWh | Dec 2002 | Mar 2025 | Natural Gas : 99.9% |
Scioto Ridge Wind Farm | RWE Renewables Americas, LLC | Belle Center, OH | PJM Interconnection, LLC (PJM) | 551.0 GWh | Apr 2021 | Mar 2025 | Wind |
Akron WRF | City of Akron | Akron, OH | PJM Interconnection, LLC (PJM) | 7.9 GWh | Apr 2014 | Mar 2025 | Other Biomass Gas |
Northwest Ohio Wind | Northwest Ohio Wind, LLC | Haviland, OH | PJM Interconnection, LLC (PJM) | 280.0 GWh | Aug 2018 | Mar 2025 | Wind : 99.3% Solar : 0.7% |
Middletown Energy Center | Ohio Power Partners, LLC | Middletown, OH | PJM Interconnection, LLC (PJM) | 3.6 TWh | Apr 2018 | Mar 2025 | Natural Gas |
Foxconn Ohio | Foxconn | Warren, OH | PJM Interconnection, LLC (PJM) | 379.0 MWh | Dec 2014 | Mar 2025 | Solar |
Oregon Clean Energy Center | Oregon Clean Energy Center | Oregon, OH | PJM Interconnection, LLC (PJM) | 6.0 TWh | Jun 2017 | Mar 2025 | Natural Gas |
Carroll County Energy | Carroll County Energy LLC | Carrollton, OH | PJM Interconnection, LLC (PJM) | 5.4 TWh | Nov 2017 | Mar 2025 | Natural Gas |
Harpster Wind | OEE XVII, LLC | Harpster, OH | PJM Interconnection, LLC (PJM) | 2.8 GWh | Dec 2015 | Mar 2025 | Wind |
South Field Energy | South Field Energy, LLC | Wellsville, OH | PJM Interconnection, LLC (PJM) | 8.4 TWh | Jul 2021 | Mar 2025 | Natural Gas |
Clean Energy Future-Lordstown, LLC | Clean Energy Future-Lordstown, LLC | Lordstown, OH | PJM Interconnection, LLC (PJM) | 6.4 TWh | Sep 2018 | Mar 2025 | Natural Gas |
Paulding Wind Farm III | Paulding Wind Farm III LLC | Payne, OH | PJM Interconnection, LLC (PJM) | 315.3 GWh | Nov 2016 | Mar 2025 | Wind |
Ohio Northern University Solar Site | AEP Onsite Partners, LLC | Ada, OH | PJM Interconnection, LLC (PJM) | 4.2 GWh | Nov 2016 | Mar 2025 | Solar |
Clyde Solar Array | AEP Onsite Partners, LLC | Clyde, OH | PJM Interconnection, LLC (PJM) | 4.2 GWh | May 2016 | Mar 2025 | Solar |
Long Ridge Energy Generation | Long Ridge Energy Generation LLC | Hannibal, OH | PJM Interconnection, LLC (PJM) | 3.8 TWh | Sep 2021 | Mar 2025 | Natural Gas |
Hog Creek Wind Project | Hog Creek Wind Project LLC | Ada, OH | PJM Interconnection, LLC (PJM) | 203.2 GWh | Nov 2017 | Mar 2025 | Wind |
Denison Solar Array | AEP Onsite Partners, LLC | Granville, OH | PJM Interconnection, LLC (PJM) | 2.2 GWh | Nov 2017 | Mar 2025 | Solar |
Hillcrest Solar | Hillcrest Solar I, LLC | Mt. Orab, OH | PJM Interconnection, LLC (PJM) | 386.0 GWh | Jun 2021 | Mar 2025 | Solar |
Hecate Energy Highland LLC | Hecate Energy Highland LLC | Buford, OH | PJM Interconnection, LLC (PJM) | 470.0 GWh | - | Mar 2025 | Solar |
Timber Road IV | Paulding Wind Farm IV LLC | Payne, OH | PJM Interconnection, LLC (PJM) | 401.2 GWh | Dec 2019 | Mar 2025 | Wind |
Guernsey Power Station | Guernsey Power Station LLC | Byesville, OH | PJM Interconnection, LLC (PJM) | 11.5 TWh | Jan 2023 | Mar 2025 | Natural Gas |
Hardin Solar Energy LLC | Invenergy Services LLC | Alger, OH | PJM Interconnection, LLC (PJM) | 286.6 GWh | Jan 2021 | Mar 2025 | Solar |
Shelby Solar Array | AEP Onsite Partners, LLC | Shelby, OH | PJM Interconnection, LLC (PJM) | 1.9 GWh | Nov 2019 | Mar 2025 | Solar |
Hardin Solar Energy II LLC | Invenergy Services LLC | Belle Center, OH | PJM Interconnection, LLC (PJM) | 80.4 GWh | - | Mar 2025 | Solar |
Willowbrook Solar I, LLC | RWE Renewables Americas, LLC | Morystown, OH | PJM Interconnection, LLC (PJM) | 144.7 GWh | - | Mar 2025 | Solar |
Big Plain Solar, LLC | Leeward Asset Management, LLC | London, OH | PJM Interconnection, LLC (PJM) | 408.4 GWh | Aug 2023 | Mar 2025 | Solar |
AEUG Union Solar, LLC | Acciona Energy USA Global, LLC | West Mansfield, OH | PJM Interconnection, LLC (PJM) | 158.1 GWh | - | Mar 2025 | Solar |
Yellowbud Solar, LLC | Yellowbud Solar LLC | Williamsport, OH | PJM Interconnection, LLC (PJM) | 516.7 GWh | May 2023 | Mar 2025 | Solar |
New Market Solar | New Market Solar | Sardinia, OH | PJM Interconnection, LLC (PJM) | 69.1 GWh | Jun 2023 | Mar 2025 | Solar |
Atlanta Farms Solar | Dominion Renewable Energy | Williamsport, OH | PJM Interconnection, LLC (PJM) | 68.9 GWh | - | Mar 2025 | Solar |
Nestlewood Solar | Vesper Energy Development LLC | Hamersville, OH | PJM Interconnection, LLC (PJM) | 142.0 GWh | Nov 2023 | Mar 2025 | Solar |
Salt City Solar Project - Hybrid | Salt City Solar LLC | Circleville, OH | PJM Interconnection, LLC (PJM) | 105.0 GWh | Apr 2023 | Mar 2025 | Solar |
Ross County Solar, LLC | Ross County Solar, LLC | Greenfield, OH | PJM Interconnection, LLC (PJM) | 40.4 GWh | - | Mar 2025 | Solar |
Arche Energy Project, LLC | Lightsource Renewable Energy Asset Management, LLC | Fulton, OH | PJM Interconnection, LLC (PJM) | 192.4 GWh | - | Mar 2025 | Solar |
Madison Fields Solar Project, LLC | Madison Fields Solar Project, LLC | Irwin, OH | PJM Interconnection, LLC (PJM) | 379.5 GWh | - | Mar 2025 | Solar |
Blue Harvest Solar Park | Blue Harvest Solar Park LLC | Continental, OH | PJM Interconnection, LLC (PJM) | 105.5 GWh | Nov 2023 | Mar 2025 | Solar |
Timber Road Solar Park | Timber Road Solar Park | Payne, OH | PJM Interconnection, LLC (PJM) | 104.6 GWh | Nov 2023 | Mar 2025 | Solar |
Fayette Solar | National Grid Renewables | Greenfield, OH | PJM Interconnection, LLC (PJM) | 16.6 GWh | - | Mar 2025 | Solar |
Fox Squirrel Solar | EDF Renewable Asset Holdings, Inc. | Mt Sterling, OH | PJM Interconnection, LLC (PJM) | 782.7 GWh | Nov 2023 | Mar 2025 | Solar |
Clearview Solar 1 | Clearview Solar I, LLC | Champaign County, OH | 51.6 GWh | - | Mar 2025 | Solar | |
Hardin Solar III | Hardin Solar Energy III | Hardin County, OH | 41.4 GWh | - | Mar 2025 | Solar | |
Pixelle Specialty Solutions LLC - Chillicothe Facility | Pixelle Specialty Solution, LLC | Chillicothe, OH | PJM Interconnection, LLC (PJM) | 203.9 GWh | Jan 1952 | Feb 2025 | Black Liquor : 42.3% Natural Gas : 39.9% Wood/Wood Waste Solids : 14.5% Tire-derived Fuels : 2.1% Distillate Fuel Oil : 1.2% |
Toledo Ref Power Recovery Train | Toledo Refining Company | Oregon, OH | PJM Interconnection, LLC (PJM) | 572.3 MWh | May 1986 | Jan 2025 | Petroleum Coke |
Broshco Fabricated Products | Broshco Fabricated Products | Mansfield, OH | PJM Interconnection, LLC (PJM) | 2.2 GWh | Aug 2001 | Jan 2025 | Natural Gas |
Clevelandcliffs Warren | Clevelandcliffs Warren | Warren, OH | PJM Interconnection, LLC (PJM) | 53.3 GWh | Sep 1934 | Sep 2024 | Other Gas : 62.9% Natural Gas : 37.1% |
Dicks Creek | Luminant Dick's Creek | Monroe, OH | PJM Interconnection, LLC (PJM) | 1.9 GWh | Aug 1965 | Dec 2023 | Natural Gas |
Tait Electric Generating Station | Kimura Power LLC | Moraine, OH | PJM Interconnection, LLC (PJM) | 1.3 TWh | Apr 1967 | Dec 2023 | Natural Gas : 99.9% |
O H Hutchings | Kimura Power LLC | Miamisburg, OH | PJM Interconnection, LLC (PJM) | 208.0 MWh | Jun 1948 | Dec 2023 | Natural Gas |
Monument | Kimura Power LLC | Dayton, OH | PJM Interconnection, LLC (PJM) | 30.0 MWh | May 1968 | Dec 2023 | Distillate Fuel Oil |
Sidney (OH) | Kimura Power LLC | Sidney, OH | PJM Interconnection, LLC (PJM) | 38.0 MWh | Jun 1968 | Dec 2023 | Distillate Fuel Oil |
Yankee Street | Kimura Power LLC | Centerville, OH | PJM Interconnection, LLC (PJM) | 4.7 GWh | Jun 1969 | Dec 2023 | Natural Gas : 72.4% Solar : 26.9% Distillate Fuel Oil : 0.7% |
West Lorain | Vermillion Power LLC | Lorain, OH | PJM Interconnection, LLC (PJM) | 1.1 TWh | May 1973 | Dec 2023 | Natural Gas : 99.9% |
FirstEnergy Bay Shore | Walleye Power, LLC | Oregon, OH | PJM Interconnection, LLC (PJM) | 938.3 GWh | Jul 1955 | Dec 2023 | Petroleum Coke : 99.5% |
Richland | Richland-Stryker Generation LLC | Defiance, OH | PJM Interconnection, LLC (PJM) | 231.5 GWh | Nov 1965 | Dec 2023 | Natural Gas |
Stryker | Richland-Stryker Generation LLC | Stryker, OH | PJM Interconnection, LLC (PJM) | 27.0 MWh | Jan 1968 | Dec 2023 | Distillate Fuel Oil |
Bryan (OH) | City of Bryan - (OH) | Bryan, OH | PJM Interconnection, LLC (PJM) | 916.8 MWh | Apr 1948 | Dec 2023 | Natural Gas : 93.5% Distillate Fuel Oil : 6.5% |
Hamilton (OH) | City of Hamilton - (OH) | Hamilton, OH | PJM Interconnection, LLC (PJM) | 776.0 MWh | Feb 1954 | Dec 2023 | Natural Gas |
Oberlin (OH) | City of Oberlin - (OH) | Oberlin, OH | PJM Interconnection, LLC (PJM) | 292.0 MWh | Dec 1947 | Dec 2023 | Natural Gas : 84.0% Distillate Fuel Oil : 16.0% |
Painesville | City of Painesville | Painesville, OH | PJM Interconnection, LLC (PJM) | 749.0 MWh | Dec 1948 | Dec 2023 | Bituminous Coal : 71.7% Natural Gas : 21.6% Distillate Fuel Oil : 6.7% |
St Marys | City of St Marys - (OH) | St. Marys, OH | PJM Interconnection, LLC (PJM) | 73.0 MWh | Jul 1992 | Dec 2023 | Distillate Fuel Oil : 99.9% |
Anadarko | City of Woodsfield - (OH) | Woodsfield, OH | PJM Interconnection, LLC (PJM) | 16.0 MWh | Dec 1948 | Dec 2023 | Distillate Fuel Oil |
Greenup Hydro | City of Hamilton - (OH) | Franklin Furnace, OH | PJM Interconnection, LLC (PJM) | 262.2 GWh | Nov 1982 | Dec 2023 | Water |
Racine | Eagle Creek Renewable Energy, LLC | Racine, OH | PJM Interconnection, LLC (PJM) | 215.3 GWh | Aug 1982 | Dec 2023 | Water |
Prospect Municipal | American Mun Power-Ohio, Inc | Prospect, OH | PJM Interconnection, LLC (PJM) | 100.0 MWh | Jan 1998 | Dec 2023 | Distillate Fuel Oil |
Auglaize Hydro | City of Bryan - (OH) | Bryan, OH | PJM Interconnection, LLC (PJM) | 6.8 GWh | Nov 1986 | Dec 2023 | Water |
Cleveland Peaking | American Mun Power-Ohio, Inc | Cleveland, OH | PJM Interconnection, LLC (PJM) | 187.0 MWh | Jun 2000 | Dec 2023 | Distillate Fuel Oil |
Versailles Peaking | American Mun Power-Ohio, Inc | Versailles, OH | PJM Interconnection, LLC (PJM) | 100.0 MWh | May 1999 | Dec 2023 | Distillate Fuel Oil |
Napoleon Peaking | American Mun Power-Ohio, Inc | Napoleon, OH | PJM Interconnection, LLC (PJM) | 140.0 MWh | Jun 1999 | Dec 2023 | Distillate Fuel Oil |
Dover Peaking | American Mun Power-Ohio, Inc | Dover, OH | PJM Interconnection, LLC (PJM) | 134.0 MWh | Jun 1999 | Dec 2023 | Distillate Fuel Oil |
Orrville Peaking | American Mun Power-Ohio, Inc | Orrville, OH | PJM Interconnection, LLC (PJM) | 103.0 MWh | Jun 1999 | Dec 2023 | Distillate Fuel Oil |
Bryan Peaking | American Mun Power-Ohio, Inc | Bryan, OH | PJM Interconnection, LLC (PJM) | 237.0 MWh | Jun 1999 | Dec 2023 | Distillate Fuel Oil |
Jackson Cntr Peaking | American Mun Power-Ohio, Inc | Jackson Center, OH | PJM Interconnection, LLC (PJM) | 34.0 MWh | May 1999 | Dec 2023 | Distillate Fuel Oil |
Hamilton Peaking | American Mun Power-Ohio, Inc | Hamilton, OH | PJM Interconnection, LLC (PJM) | 1.5 GWh | May 2000 | Dec 2023 | Natural Gas |
Bowling Green Peaking | American Mun Power-Ohio, Inc | Bowling Green, OH | PJM Interconnection, LLC (PJM) | 1.5 GWh | May 2000 | Dec 2023 | Natural Gas |
Montpelier | American Mun Power-Ohio, Inc | Montpelier, OH | PJM Interconnection, LLC (PJM) | 323.0 MWh | Jun 2000 | Dec 2023 | Distillate Fuel Oil |
Hamilton Hydro | City of Hamilton - (OH) | HAMILTON, OH | PJM Interconnection, LLC (PJM) | 5.7 GWh | Apr 1994 | Dec 2023 | Water |
Shelby North | American Mun Power-Ohio, Inc | Shelby, OH | PJM Interconnection, LLC (PJM) | 23.0 MWh | May 2000 | Dec 2023 | Distillate Fuel Oil |
Shelby South | City of Shelby - (OH) | Shelby, OH | PJM Interconnection, LLC (PJM) | 37.0 MWh | May 2000 | Dec 2023 | Distillate Fuel Oil |
Robert P Mone Plant | Buckeye Power, Inc | Convoy, OH | PJM Interconnection, LLC (PJM) | 185.0 GWh | Jun 2002 | Dec 2023 | Natural Gas : 99.6% |
Edgerton | American Mun Power-Ohio, Inc | Edgerton, OH | PJM Interconnection, LLC (PJM) | 110.0 MWh | Jul 2000 | Dec 2023 | Distillate Fuel Oil |