Directory of Power Plants in Ohio
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Sauder Power Plant | Sauder Woodworking Co | Archbold, OH | PJM Interconnection, LLC (PJM) | 7.4 GWh | Sep 1993 | Apr 2025 | Wood/Wood Waste Solids : 99.3% Natural Gas : 0.7% |
| Paulding Wind Farm III | Paulding Wind Farm III LLC | Payne, OH | PJM Interconnection, LLC (PJM) | 319.9 GWh | Nov 2016 | May 2026 | Wind |
| Euclid Farm, Stamco N-54 | Case Western Reserve University | Euclid, OH | PJM Interconnection, LLC (PJM) | 1.1 GWh | Sep 2012 | Dec 2025 | Wind |
| Blue Creek Wind Project | Avangrid Power LLC | Paulding, OH | PJM Interconnection, LLC (PJM) | 808.5 GWh | Nov 2011 | May 2026 | Wind |
| Scioto Ridge Wind Farm | RWE Clean Energy | Belle Center, OH | PJM Interconnection, LLC (PJM) | 464.9 GWh | Apr 2021 | May 2026 | Wind |
| LE Wind Turbine 1 | Lincoln Electric Company | Euclid, OH | PJM Interconnection, LLC (PJM) | 1.8 GWh | Jun 2011 | Dec 2025 | Wind |
| Findlay Wind Farm | Findlay Wind 20, LLC | Findlay, OH | PJM Interconnection, LLC (PJM) | 5.0 GWh | Nov 2015 | Dec 2024 | Wind |
| RP Wind | RWE Clean Energy | Russells Point, OH | PJM Interconnection, LLC (PJM) | 7.2 GWh | Nov 2013 | Dec 2025 | Wind |
| Harpster Wind | Wyandot Wind 17, LLC | Harpster, OH | PJM Interconnection, LLC (PJM) | 3.1 GWh | Dec 2015 | May 2026 | Wind |
| Zephyr Wind | Findlay Wind 19, LLC | Findlay, OH | PJM Interconnection, LLC (PJM) | 6.7 GWh | Nov 2015 | Dec 2024 | Wind |
| Timber Road IV | Paulding Wind Farm IV LLC | Payne, OH | PJM Interconnection, LLC (PJM) | 397.9 GWh | Dec 2019 | May 2026 | Wind |
| Paulding Wind Farm II | Paulding Wind Farm II LLC | Payne, OH | PJM Interconnection, LLC (PJM) | 312.0 GWh | Jun 2011 | May 2026 | Wind |
| Whirlpool Corp-Greenville Wind Farm | Greenville Wind 26, LLC | Greenville, OH | PJM Interconnection, LLC (PJM) | 6.4 GWh | Aug 2018 | Dec 2024 | Wind |
| Martin Marietta Wind Project | Sandusky Wind 33, LLC | Woodville, OH | PJM Interconnection, LLC (PJM) | 7.2 GWh | Nov 2023 | Dec 2024 | Wind |
| LafargeHolcim - Paulding Wind Project | Paulding Wind 28, LLC | Paulding, OH | PJM Interconnection, LLC (PJM) | 5.7 GWh | Jul 2020 | Dec 2024 | Wind |
| Bowling Green Wind | American Mun Power-Ohio, Inc | Bowling Green, OH | PJM Interconnection, LLC (PJM) | 3.3 GWh | Sep 2003 | Mar 2025 | Wind |
| Whirlpool Corporation - Ottawa Wind Farm | Ottawa Wind 24, LLC | Ottawa, OH | PJM Interconnection, LLC (PJM) | 1.9 GWh | Dec 2017 | Dec 2024 | Wind |
| Whirlpool Corporation - Marion Wind Farm | Marion Wind 23, LLC | Marion, OH | PJM Interconnection, LLC (PJM) | 5.7 GWh | Sep 2017 | Dec 2024 | Wind |
| Zephyr Wind Project - 2.0 | Findlay Wind 30, LLC | Findlay, OH | PJM Interconnection, LLC (PJM) | 3.9 GWh | Jul 2020 | Dec 2024 | Wind |
| Haviland Plastic Products | Haviland Plastic Products Co | Haviland, OH | PJM Interconnection, LLC (PJM) | 12.9 GWh | Apr 2013 | Dec 2024 | Wind |
| Hog Creek Wind Project | Hog Creek Wind Project LLC | Ada, OH | PJM Interconnection, LLC (PJM) | 211.1 GWh | Nov 2017 | May 2026 | Wind |
| Valfilm Wind Project | Findlay Wind 25, LLC | Findlay, OH | PJM Interconnection, LLC (PJM) | 3.6 GWh | Aug 2018 | Dec 2024 | Wind |
| Northwest Ohio Wind | Northwest Ohio Wind, LLC | Haviland, OH | PJM Interconnection, LLC (PJM) | 300.4 GWh | Aug 2018 | May 2026 | Wind |
| Cooper Farms VW Project | Cooper Hatchery Inc. | Van Wert, OH | PJM Interconnection, LLC (PJM) | 12.8 GWh | Feb 2012 | Dec 2024 | Wind |
| Auglaize Hydro | City of Bryan - (OH) | Bryan, OH | PJM Interconnection, LLC (PJM) | 6.1 GWh | Nov 1986 | Dec 2025 | Water |
| Racine | Eagle Creek Renewable Energy, LLC | Racine, OH | PJM Interconnection, LLC (PJM) | 190.0 GWh | Aug 1982 | Dec 2025 | Water |
| Greenup Hydro | City of Hamilton - (OH) | Franklin Furnace, OH | PJM Interconnection, LLC (PJM) | 265.6 GWh | Nov 1982 | Dec 2025 | Water |
| Hamilton Hydro | City of Hamilton - (OH) | HAMILTON, OH | PJM Interconnection, LLC (PJM) | 8.8 GWh | Apr 1994 | Dec 2025 | Water |
| Fox Squirrel Solar | EDF Renewable Asset Holdings, Inc. | Mt Sterling, OH | PJM Interconnection, LLC (PJM) | 1.2 TWh | Nov 2023 | May 2026 | Solar |
| Clearview Solar 1 | Clearview Solar I, LLC | Quincy, OH | PJM Interconnection, LLC (PJM) | 280.9 GWh | Nov 2024 | May 2026 | Solar |
| Minster 3 | Madison Energy Investments LLC | Minster, OH | PJM Interconnection, LLC (PJM) | 1.5 GWh | Nov 2022 | Dec 2025 | Solar |
| Sycamore | Madison Energy Investments LLC | Sycamore, OH | PJM Interconnection, LLC (PJM) | 1.7 GWh | Nov 2023 | Dec 2025 | Solar |
| Great Bend Solar Project | Great Bend Solar LLC | Portland, OH | PJM Interconnection, LLC (PJM) | 41.0 GWh | Nov 2025 | May 2026 | Solar |
| Cadence Solar Energy Center | Cadence Solar Energy LLC | Marysville, OH | PJM Interconnection, LLC (PJM) | 170.5 GWh | - | May 2026 | Solar |
| Pickaway Solar | Dominion Renewable Energy | Williamsport, OH | PJM Interconnection, LLC (PJM) | 185.6 GWh | Dec 2024 | May 2026 | Solar |
| Toledo Air National Guard | 180th Fighter Wing | Swanton, OH | PJM Interconnection, LLC (PJM) | 296.0 MWh | Dec 2009 | Dec 2025 | Solar |
| Montpelier Solar Project | Montpelier Solar, LLC | Montpelier, OH | PJM Interconnection, LLC (PJM) | 32.3 GWh | - | May 2026 | Solar |
| Maumee Solar | Madison Energy Investments LLC | Maumee, OH | PJM Interconnection, LLC (PJM) | 1.9 GWh | Oct 2024 | Dec 2025 | Solar |
| Wheatsborough Solar | Wheatsborough Solar, LLC | Bellevue, OH | PJM Interconnection, LLC (PJM) | 172.8 GWh | Jun 2025 | May 2026 | Solar |
| 3100 Valleyview Drive | Madison Energy Investments LLC | Columbus, OH | PJM Interconnection, LLC (PJM) | 916.0 MWh | Jul 2023 | Dec 2025 | Solar |
| Hardin Solar III | Hardin Solar Energy III | Alger, OH | PJM Interconnection, LLC (PJM) | 533.0 GWh | Feb 2025 | May 2026 | Solar |
| DG AMP Solar Piqua Manier | DG AMP Solar, LLC | Piqua, OH | PJM Interconnection, LLC (PJM) | 20.0 GWh | Jun 2019 | Dec 2025 | Solar |
| Big Plain Solar, LLC | Leeward Asset Management, LLC | London, OH | PJM Interconnection, LLC (PJM) | 395.3 GWh | Aug 2023 | May 2026 | Solar |
| Arche Energy Project, LLC | Lightsource Renewable Energy Asset Management, LLC | Fayette, OH | PJM Interconnection, LLC (PJM) | 194.5 GWh | Dec 2023 | May 2026 | Solar |
| KSU Trumbull | Madison Energy Holdings LLC | Warren, OH | PJM Interconnection, LLC (PJM) | 1.5 GWh | May 2021 | Dec 2025 | Solar |
| Ross County Solar, LLC | Ross County Solar, LLC | Greenfield, OH | PJM Interconnection, LLC (PJM) | 223.2 GWh | Dec 2024 | May 2026 | Solar |
| Salt City Solar Project - Hybrid | Salt City Solar LLC | Circleville, OH | PJM Interconnection, LLC (PJM) | 105.8 GWh | Apr 2023 | May 2026 | Solar |
| Wapakoneta-Pratt | Madison Energy Holdings LLC | Wapakoneta, OH | PJM Interconnection, LLC (PJM) | 22.4 GWh | Oct 2021 | Dec 2025 | Solar |
| Nestlewood Solar | Nestlewood Solar | Hamersville, OH | PJM Interconnection, LLC (PJM) | 160.9 GWh | Nov 2023 | May 2026 | Solar |
| CZ Solar Warren, LLC | CZ Solar Warren, LLC | Lebanon, OH | PJM Interconnection, LLC (PJM) | 32.2 GWh | Sep 2024 | Dec 2025 | Solar |
| New Market Solar | New Market Solar | Sardinia, OH | PJM Interconnection, LLC (PJM) | 119.6 GWh | Jun 2023 | May 2026 | Solar |
| Yellowbud Solar, LLC | Yellowbud Solar LLC | Williamsport, OH | PJM Interconnection, LLC (PJM) | 513.5 GWh | May 2023 | May 2026 | Solar |
| AEUG Union Solar, LLC | Acciona Energy USA Global, LLC | West Mansfield, OH | PJM Interconnection, LLC (PJM) | 664.8 GWh | Oct 2024 | May 2026 | Solar |
| Fayette Solar | Geronimo Power | Greenfield, OH | PJM Interconnection, LLC (PJM) | 92.2 GWh | Dec 2024 | May 2026 | Solar |
| Solvita | IGS Solar I, LLC | Kettering, OH | PJM Interconnection, LLC (PJM) | 67.0 MWh | Nov 2025 | Dec 2025 | Solar |
| IGS CMH4, LLC | Altus Power America Management, LLC | Madison, OH | PJM Interconnection, LLC (PJM) | 6.4 GWh | Jun 2023 | Dec 2025 | Solar |
| IGS PCW1 | Altus Power America Management, LLC | Rossford, OH | PJM Interconnection, LLC (PJM) | 1.9 GWh | Jun 2023 | Dec 2025 | Solar |
| PNA Rossford Solar Array | Onsite Partners, LLC | Rossford, OH | PJM Interconnection, LLC (PJM) | 2.3 GWh | Jun 2022 | Dec 2025 | Solar |
| Madison Fields Solar Project, LLC | Madison Fields Solar Project, LLC | Irwin, OH | PJM Interconnection, LLC (PJM) | 403.2 GWh | Dec 2023 | May 2026 | Solar |
| Blue Harvest Solar Park | Blue Harvest Solar Park LLC | Continental, OH | PJM Interconnection, LLC (PJM) | 98.6 GWh | Nov 2023 | May 2026 | Solar |
| Timber Road Solar Park | Timber Road Solar Park | Payne, OH | PJM Interconnection, LLC (PJM) | 98.1 GWh | Nov 2023 | May 2026 | Solar |
| Marion County Solar Project | Marion County Solar Project, LLC | Marion, OH | PJM Interconnection, LLC (PJM) | 50.2 GWh | - | May 2026 | Solar |
| Dodson Creek Solar, LLC | Geronimo Power | Hillsboro, OH | PJM Interconnection, LLC (PJM) | 230.5 GWh | May 2025 | May 2026 | Solar |
| Buckeye Power Inc. | Township Road 215 Solar Project 2021, LLC | Marion, OH | PJM Interconnection, LLC (PJM) | 3.7 GWh | Jun 2022 | Dec 2025 | Solar |
| HMW Minster PV I | Madison Energy Holdings LLC | Village of Minster, OH | PJM Interconnection, LLC (PJM) | 7.7 GWh | Nov 2015 | Dec 2025 | Solar |
| MCCo Solar Generating Facility | The Medical Center Company | Cleveland, OH | PJM Interconnection, LLC (PJM) | 1.1 GWh | Oct 2014 | Dec 2025 | Solar |
| Hillcrest Solar | Hillcrest Solar I, LLC | Mt. Orab, OH | PJM Interconnection, LLC (PJM) | 367.5 GWh | Jun 2021 | May 2026 | Solar |
| Cuyahoga County Landfill | Madison Energy Holdings LLC | Brooklyn, OH | PJM Interconnection, LLC (PJM) | 4.6 GWh | Aug 2018 | Dec 2025 | Solar |
| Anthony Wayne Solar #1 | Toledo Zoological Society | Toledo, OH | PJM Interconnection, LLC (PJM) | 1.7 GWh | May 2014 | Dec 2025 | Solar |
| Springfield Solar LLC | Laurel Capital Partners | Springfield, OH | PJM Interconnection, LLC (PJM) | 277.0 MWh | Oct 2012 | Dec 2024 | Solar |
| Foxconn Ohio | Foxconn | Warren, OH | PJM Interconnection, LLC (PJM) | 160.0 MWh | Dec 2014 | Oct 2025 | Solar |
| DG AMP Solar Brewster | DG AMP Solar, LLC | Brewster, OH | PJM Interconnection, LLC (PJM) | 2.1 GWh | Nov 2018 | Dec 2025 | Solar |
| Owens Corning Headquarters | Luminace Solar Holding, LLC | Toledo, OH | PJM Interconnection, LLC (PJM) | 1.5 GWh | Aug 2015 | Dec 2025 | Solar |
| Celina Solar Project #1, LLC | Celina Solar Project #1, LLC | Celina, OH | PJM Interconnection, LLC (PJM) | 6.5 GWh | Nov 2012 | Dec 2025 | Solar |
| DG AMP Solar Piqua Staunton | DG AMP Solar, LLC | Piqua, OH | PJM Interconnection, LLC (PJM) | 2.5 GWh | Aug 2018 | Dec 2025 | Solar |
| DG AMP Solar Bowling Green | DG AMP Solar, LLC | Bowling Green, OH | PJM Interconnection, LLC (PJM) | 38.7 GWh | Dec 2016 | Dec 2025 | Solar |
| Ohio Northern University Solar Site | Onsite Partners, LLC | Ada, OH | PJM Interconnection, LLC (PJM) | 3.9 GWh | Nov 2016 | May 2026 | Solar |
| Clyde Solar Array | Onsite Partners, LLC | Clyde, OH | PJM Interconnection, LLC (PJM) | 3.7 GWh | May 2016 | May 2026 | Solar |
| Denison Solar Array | Onsite Partners, LLC | Granville, OH | PJM Interconnection, LLC (PJM) | 2.6 GWh | Nov 2017 | May 2026 | Solar |
| DG AMP Solar Jackson Center | DG AMP Solar, LLC | Jackson Center, OH | PJM Interconnection, LLC (PJM) | 2.7 GWh | Jan 2018 | Dec 2025 | Solar |
| DG AMP Solar Orrville 3 | DG AMP Solar, LLC | Orrville, OH | PJM Interconnection, LLC (PJM) | 3.2 GWh | Jan 2018 | Dec 2025 | Solar |
| DG AMP Solar Versailles | DG AMP Solar, LLC | Versailles, OH | PJM Interconnection, LLC (PJM) | 2.6 GWh | Dec 2017 | Dec 2025 | Solar |
| DG AMP 1048 Wadsworth | DG AMP Solar, LLC | Wadsworth, OH | PJM Interconnection, LLC (PJM) | 10.4 GWh | Nov 2019 | Dec 2025 | Solar |
| Buckeye Solar | Dominion Renewable Energy | Williamsport, OH | PJM Interconnection, LLC (PJM) | 188.7 GWh | Dec 2024 | May 2026 | Solar |
| Willowbrook Solar I, LLC | RWE Clean Energy | Morystown, OH | PJM Interconnection, LLC (PJM) | 293.2 GWh | Aug 2024 | May 2026 | Solar |
| Hardin Solar Energy II LLC | Invenergy Services LLC | Belle Center, OH | PJM Interconnection, LLC (PJM) | 315.5 GWh | Nov 2024 | May 2026 | Solar |
| Shelby Solar Array | Onsite Partners, LLC | Shelby, OH | PJM Interconnection, LLC (PJM) | 3.1 GWh | Nov 2019 | May 2026 | Solar |
| Parking Lot Array | Cincinnati Zoo & Botanical Garden | Cincinnati, OH | PJM Interconnection, LLC (PJM) | 1.4 GWh | Apr 2011 | Dec 2025 | Solar |
| Monroeville Solar | Solar Planet Power | Monroeville, OH | PJM Interconnection, LLC (PJM) | 2.5 GWh | Nov 2017 | Dec 2025 | Solar |
| Hardin Solar Energy LLC | Dominion Renewable Energy | Alger, OH | PJM Interconnection, LLC (PJM) | 303.7 GWh | Jan 2021 | May 2026 | Solar |
| Wyandot Solar Farm | Wyandot Solar LLC | Upper Sandusky, OH | PJM Interconnection, LLC (PJM) | 10.7 GWh | Mar 2010 | May 2026 | Solar |
| Clinton Solar (OH) | Clinton Solar (OH) LLC | Martinsville, OH | PJM Interconnection, LLC (PJM) | 48.6 GWh | Sep 2025 | May 2026 | Solar |
| DG AMP Rittman Rd | DG AMP Solar, LLC | Wadsworth, OH | PJM Interconnection, LLC (PJM) | 3.4 GWh | Apr 2020 | Dec 2025 | Solar |
| Sycamore Creek Solar, LLC | Geronimo Power | New Washington, OH | PJM Interconnection, LLC (PJM) | 60.4 GWh | Nov 2025 | May 2026 | Solar |
| Napoleon Solar I | Enfinity BNB Napoleon Solar LLC | Napoleon, OH | PJM Interconnection, LLC (PJM) | 10.9 GWh | Nov 2011 | Dec 2025 | Solar |
| AMP Napoleon Solar Facility | American Mun Power-Ohio, Inc | Napoleon, OH | PJM Interconnection, LLC (PJM) | 4.2 GWh | Aug 2012 | Dec 2025 | Solar |
| Oberlin Spear Point Solar One | Oberlin College | Oberlin, OH | PJM Interconnection, LLC (PJM) | 2.5 GWh | Oct 2012 | Dec 2025 | Solar |
| Hecate Energy Highland LLC | Hecate Energy Highland LLC | Buford, OH | PJM Interconnection, LLC (PJM) | 628.8 GWh | Apr 2024 | May 2026 | Solar |
| Bryan Solar Field | City of Bryan - (OH) | Bryan, OH | PJM Interconnection, LLC (PJM) | 2.4 GWh | Jan 2012 | Dec 2025 | Solar |
| CU Solar Plant | CU Solar LLC | Cedarville, OH | PJM Interconnection, LLC (PJM) | 2.1 GWh | Mar 2013 | Dec 2025 | Solar |