Zephyr Wind Project - 2.0
12385 Township Road 215, Findlay, OH 45840Plant Summary Information
Zephyr Wind Project - 2.0 is ranked #17 out of 23 wind farms in Ohio in terms of total annual net electricity generation.
Zephyr Wind Project - 2.0 generated 2.1 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Zephyr Wind Project - 2.0 |
|---|---|
| Utility Name | Findlay Wind 30, LLC |
| Location | Hancock County, OH |
| Initial Operation Date | August 2020 |
| Last Update | Dec 2024 |
| Annual Generation | 3.9 GWh |
| Annual Consumption | 16.5 k MMBtu |
| Ranked #8,985 out of 13,081 Power Plants Nationwide | |
| Ranked #1,274 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #119 out of 206 Ohio Power Plants | |
| Ranked #17 out of 23 Ohio Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
OEE XXX LLC (2018 to 2024) Findlay Wind 30, LLC (2025 to 2025) |
Map of Zephyr Wind Project - 2.0
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Zephyr Wind Project - 2.0.
Monthly Net Generation for Zephyr Wind Project - 2.0
Monthly Plant Fuel Consumption for Zephyr Wind Project - 2.0
Zephyr Wind Project - 2.0 Details
| Summary Information | |
|---|---|
| Plant Name | Zephyr Wind Project - 2.0 (62653) |
| Plant Address | 12385 Township Road 215, Findlay, OH 45840 |
| Utility | Findlay Wind 30, LLC (62128) |
| Latitude, Longitude | 41.09308, -83.63778 |
| Generation Dates on File | Aug 2020 to Dec 2024 |
| Initial Operation Date | August 2020 |
| Annual Generation | 3.9 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Fabricated Metal Product Manufacturing (332) |
| Sector | Industrial Non-CHP (6) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Ohio Power Co (14006) OH |
| Grid Voltage | 34.50 kV |
| Energy Storage | No |
Generator T1 Details Operating August 2020
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | August 2020 |
| Combined Heat & Power | No |
| Sector Name | Industrial Non-CHP (6) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Turbines/Hydrokinetic Buoys | 1 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 1 |
|---|---|
| Predominant Turbine Manufacturer | Goldwind |
| Predominant Turbine Model Number | GW 87/1500 |
| Design Wind Speed | 13 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 262 |
Generator T2 Details Operating August 2020
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | August 2020 |
| Combined Heat & Power | No |
| Sector Name | Industrial Non-CHP (6) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Turbines/Hydrokinetic Buoys | 1 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 1 |
|---|---|
| Predominant Turbine Manufacturer | Goldwind |
| Predominant Turbine Model Number | GW 87/1500 |
| Design Wind Speed | 13 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 262 |
Generator T3 Details Operating August 2020
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | August 2020 |
| Combined Heat & Power | No |
| Sector Name | Industrial Non-CHP (6) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Turbines/Hydrokinetic Buoys | 1 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 1 |
|---|---|
| Predominant Turbine Manufacturer | Goldwind |
| Predominant Turbine Model Number | GW 87/1500 |
| Design Wind Speed | 13 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 262 |
Zephyr Wind Project - 2.0 Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1264 | Hilltop Power | Edgerton, MN | 4.1 GWh |
| #1265 | Princeton Wind Farm | Princeton, MA | 4.0 GWh |
| #1266 | Buffalo Center Wind LLC | Little Cedar, IA | 4.0 GWh |
| #1267 | Fey Windfarm LLC | Woodstock, MN | 4.0 GWh |
| #1268 | University of Delaware Wind Turbine | Lewes, DE | 4.0 GWh |
| #1269 | Mt Wachusett Community College | Gardner, MA | 4.0 GWh |
| #1270 | Cumberland Rose | Orient, IA | 4.0 GWh |
| #1271 | Marshall Wind 3 LLC | Marshall, MN | 4.0 GWh |
| #1272 | Foundation Cemex BMQ | Apple Valley, CA | 3.9 GWh |
| #1273 | Marshall Wind 4 LLC | Marshall, MN | 3.9 GWh |
| #1275 | Valley View Transmission LLC | Chandler, MN | 3.8 GWh |
| #1276 | Taylor Farms | Gonzales, CA | 3.8 GWh |
| #1277 | Iowa Distributed Wind Generation Project | Algona, IA | 3.7 GWh |
| #1278 | Tsar Nicholas LLC | Hendricks, MN | 3.7 GWh |
| #1279 | Sun River LLC | Hendricks, MN | 3.7 GWh |
| #1280 | Julia Hills LLC | Hendricks, MN | 3.7 GWh |
| #1281 | Jessica Mills LLC | Hendricks, MN | 3.7 GWh |
| #1282 | Jack River LLC | Hendricks, MN | 3.7 GWh |
| #1283 | Autumn Hills LLC | Hendricks, MN | 3.7 GWh |
| #1284 | TG Windfarm LLC | Pipestone, MN | 3.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Zephyr Wind Project - 2.0.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bowling Green Generating Station | Bowling Green, OH | 2.8 GWh | 21 mi |
| Bowling Green Peaking | Bowling Green, OH | 2.3 GWh | 20.4 mi |
| Bowling Green Wind | Bowling Green, OH | 3.3 GWh | 20.4 mi |
| Buckeye Power Inc. | Marion, OH | 3.7 GWh | 4.9 mi |
| DG AMP Solar Bowling Green | Bowling Green, OH | 38.7 GWh | 21.1 mi |
| Energy Developments, Hancock | Findlay, OH | 17.8 GWh | 12 mi |
| Findlay Wind Farm | Findlay, OH | 5.0 GWh | 0.7 mi |
| Hog Creek Wind Project | Ada, OH | 211.1 GWh | 21.3 mi |
| Martin Marietta Wind Project | Woodville, OH | 7.2 GWh | 29.4 mi |
| Ohio Northern University Solar Site | Ada, OH | 3.9 GWh | 25.3 mi |
| POET Biorefining - Fostoria | Fostoria, OH | 18.5 GWh | 14.6 mi |
| POET Biorefining - Leipsic, LLC | Leipsic, OH | 14.2 GWh | 17.4 mi |
| Powell Creek Solar | Miller City, OH | 304.7 GWh | 24.9 mi |
| Sycamore | Sycamore, OH | 1.7 GWh | 26.8 mi |
| Troy Energy LLC | Luckey, OH | 1.3 TWh | 28.1 mi |
| Valfilm Wind Project | Findlay, OH | 3.6 GWh | 0.7 mi |
| Whirlpool Corporation - Ottawa Wind Farm | Ottawa, OH | 1.9 GWh | 21.6 mi |
| Woodville RTO BTM | Woodville, OH | 130.0 MWh | 28.9 mi |
| Wyandot Solar Farm | Upper Sandusky, OH | 10.7 GWh | 22.3 mi |
| Zephyr Wind | Findlay, OH | 6.7 GWh | 0.3 mi |