Findlay Wind Farm
12367 Township Road 215, Findlay, OH 45840Plant Summary Information
Findlay Wind Farm is ranked #16 out of 23 wind farms in Ohio in terms of total annual net electricity generation.
Findlay Wind Farm generated 2.3 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Findlay Wind Farm |
---|---|
Utility Name | Findlay Wind Farm |
Location | Hancock County, OH |
Initial Operation Date | December 2015 |
Last Update | Dec 2024 |
Annual Generation | 5.0 GWh |
Annual Consumption | 19.3 k MMBtu |
Ranked #7,901 out of 12,288 Power Plants Nationwide | |
Ranked #1,221 out of 1,353 Wind Power Plants Nationwide | |
Ranked #104 out of 191 Ohio Power Plants | |
Ranked #16 out of 23 Ohio Wind Power Plants | |
Fuel Types | Wind |
Map of Findlay Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Findlay Wind Farm.
Monthly Net Generation for Findlay Wind Farm
Findlay Wind Farm Details
Summary Information | |
---|---|
Plant Name | Findlay Wind Farm (60015) |
Plant Address | 12367 Township Road 215, Findlay, OH 45840 |
Utility | Findlay Wind Farm (59760) |
Latitude, Longitude | 41.10122, -83.64439 |
Generation Dates on File | Jan 2016 to Dec 2024 |
Initial Operation Date | December 2015 |
Annual Generation | 5.0 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Plastics and Rubber Products Manufacturing (326) |
Sector | Industrial Non-CHP (6) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Ohio Power Co (14006) OH |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator WNDW1 Details Operating December 2015
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Jointly Owned |
Nameplate Capacity | 3 MW |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Minimum Load | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2015 |
Combined Heat & Power | No |
Sector Name | Industrial Non-CHP (6) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 2 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 2 |
---|---|
Predominant Turbine Manufacturer | Goldwind |
Predominant Turbine Model Number | GW 87/1500 |
Design Wind Speed | 13.1 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 262 |
Findlay Wind Farm Plant Owners
Owner Name | Address | Ownership |
---|---|---|
One Energy Capital LLC | 12385 Township Road 215, Findlay, OH 48540 | 5.00% |
Todd A.Stoller Living Trust | 100 W. Main Street, Haviland, OH 45851 | 95.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1211 | Boeve Windfarm LLC | Woodstock, MN | 5.3 GWh |
#1212 | Springfield Wind | Springfield, CO | 5.3 GWh |
#1213 | Dept of Corrections NCCI Wind | Gardner, MA | 5.3 GWh |
#1214 | Meadow Ridge | Greenfield, IA | 5.3 GWh |
#1215 | Cumberland Rose | Orient, IA | 5.2 GWh |
#1216 | Wind GEM | Stuart, IA | 5.1 GWh |
#1217 | Windcurrent Farms LLC | Woodstock, MN | 5.1 GWh |
#1218 | Fey Windfarm LLC | Woodstock, MN | 5.1 GWh |
#1219 | Sky Volt | Greenfield, IA | 5.1 GWh |
#1220 | Story City Wind Project | Story City, IA | 5.1 GWh |
#1222 | Willmar | Willmar, MN | 5.0 GWh |
#1223 | Mt Wachusett Community College | Gardner, MA | 4.9 GWh |
#1224 | Greenback Energy | Pipestone, MN | 4.9 GWh |
#1225 | Flat Iron Wind (7) LLC | Sunray, TX | 4.9 GWh |
#1226 | Wolverine | Greenfield, IA | 4.9 GWh |
#1227 | Dinosaur Point | Los Banos, CA | 4.9 GWh |
#1228 | Buffalo Center Wind LLC | Little Cedar, IA | 4.8 GWh |
#1229 | Winters Spawn LLC | Lake Benton, MN | 4.8 GWh |
#1230 | Twin Lake Hills LLC | Lake Benton, MN | 4.8 GWh |
#1231 | Spartan Hills LLC | Lake Benton, MN | 4.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Findlay Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bowling Green Generating Station | Bowling Green, OH | 3.1 GWh | 20.5 mi |
Bowling Green Peaking | Bowling Green, OH | 2.4 GWh | 19.8 mi |
Bowling Green Wind | Bowling Green, OH | 3.6 GWh | 19.8 mi |
Buckeye Power Inc. | Marion, OH | 3.6 GWh | 5.5 mi |
DG AMP Solar Bowling Green | Bowling Green, OH | 38.8 GWh | 20.6 mi |
Energy Developments, Hancock | Findlay, OH | 20.6 GWh | 12.5 mi |
Hardin Solar III | Alger, OH | 41.4 GWh | 30 mi |
Hog Creek Wind Project | Ada, OH | 203.2 GWh | 21.7 mi |
Martin Marietta Wind Project | Woodville, OH | 7.2 GWh | 29 mi |
Ohio Northern University Solar Site | Ada, OH | 4.2 GWh | 25.7 mi |
POET Biorefining - Fostoria | Fostoria, OH | 19.8 GWh | 14.7 mi |
POET Biorefining - Leipsic, LLC | Leipsic, OH | 6.0 GWh | 17 mi |
Sycamore | Sycamore, OH | 1.9 GWh | 27.3 mi |
Troy Energy LLC | Luckey, OH | 988.6 GWh | 27.7 mi |
Valfilm Wind Project | Findlay, OH | 3.6 GWh | 1.2 mi |
Whirlpool Corporation - Ottawa Wind Farm | Ottawa, OH | 1.9 GWh | 21.4 mi |
Woodville RTO BTM | Woodville, OH | 144.0 MWh | 28.5 mi |
Wyandot Solar Farm | Upper Sandusky, OH | 11.5 GWh | 22.9 mi |
Zephyr Wind | Findlay, OH | 6.7 GWh | 0.4 mi |
Zephyr Wind Project - 2.0 | Findlay, OH | 3.9 GWh | 0.7 mi |