Martin Marietta Wind Project
755 Lime Road, Woodville, OH 43402Plant Summary Information
Martin Marietta Wind Project is ranked #11 out of 23 wind farms in Ohio in terms of total annual net electricity generation.
Martin Marietta Wind Project generated 3.4 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Martin Marietta Wind Project |
|---|---|
| Utility Name | Sandusky Wind 33, LLC |
| Location | Sandusky County, OH |
| Initial Operation Date | December 2023 |
| Last Update | Dec 2024 |
| Annual Generation | 7.2 GWh |
| Annual Consumption | 24.5 k MMBtu |
| Ranked #7,337 out of 13,081 Power Plants Nationwide | |
| Ranked #1,185 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #105 out of 206 Ohio Power Plants | |
| Ranked #11 out of 23 Ohio Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
OEE XXXIII LLC (2022 to 2024) Sandusky Wind 33, LLC (2025 to 2025) |
Map of Martin Marietta Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Martin Marietta Wind Project.
Monthly Net Generation for Martin Marietta Wind Project
Monthly Plant Fuel Consumption for Martin Marietta Wind Project
Martin Marietta Wind Project Details
| Summary Information | |
|---|---|
| Plant Name | Martin Marietta Wind Project (66261) |
| Plant Address | 755 Lime Road, Woodville, OH 43402 |
| Utility | Sandusky Wind 33, LLC (65369) |
| Latitude, Longitude | 41.466, -83.367 |
| Generation Dates on File | Apr 2024 to Dec 2024 |
| Initial Operation Date | December 2023 |
| Annual Generation | 7.2 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | The Toledo Edison Co (18997) OH |
| Grid Voltage | 34.50 kV |
| Energy Storage | No |
Generator WTG01 Details Operating December 2023
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 1 |
| Turbine Details | |
| Number Of Turbines | 1 |
|---|---|
| Predominant Turbine Manufacturer | Goldwind |
| Predominant Turbine Model Number | GW 87/1500 |
| Design Wind Speed | 14.8 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 262 |
Generator WTG02 Details Operating December 2023
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 1 |
| Turbine Details | |
| Number Of Turbines | 1 |
|---|---|
| Predominant Turbine Manufacturer | Goldwind |
| Predominant Turbine Model Number | GW 87/1500 |
| Design Wind Speed | 14.8 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 262 |
Generator WTG03 Details Operating December 2023
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 1 |
| Turbine Details | |
| Number Of Turbines | 1 |
|---|---|
| Predominant Turbine Manufacturer | Goldwind |
| Predominant Turbine Model Number | GW 87/1500 |
| Design Wind Speed | 14.8 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 262 |
Martin Marietta Wind Project Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1175 | Ralls Wind Farm | Ralls, TX | 7.7 GWh |
| #1176 | WED Plainfield II, LLC | Johnston, RI | 7.7 GWh |
| #1177 | WED Coventry 6 | Coventry, RI | 7.6 GWh |
| #1178 | REG Juhl Glenville Wind, LLC | Albert Lea, MN | 7.6 GWh |
| #1179 | WED Shun II, LLC | Johnston, RI | 7.4 GWh |
| #1180 | Optimum Wind 3 LLC | Nevada, IA | 7.4 GWh |
| #1181 | WED Plainfield III, LLC | Johnston, RI | 7.3 GWh |
| #1182 | RP Wind | Russells Point, OH | 7.2 GWh |
| #1183 | WED Plainfield, LLC | Johnston, RI | 7.2 GWh |
| #1184 | WED Shun I, LLC | Johnston, RI | 7.2 GWh |
| #1186 | Com Adam 1WF-1 | Sublette, IL | 7.0 GWh |
| #1187 | Roseman | Anita, IA | 6.8 GWh |
| #1188 | CCC Hastings Wind Turbine | Hastings, NE | 6.8 GWh |
| #1189 | Zephyr Wind | Findlay, OH | 6.7 GWh |
| #1190 | Shane's Wind Machine | Ruthton, MN | 6.6 GWh |
| #1191 | NBC Field's Point Wind Farm | Providence, RI | 6.6 GWh |
| #1192 | Loess Hills | Rock Port, MO | 6.6 GWh |
| #1193 | Birch | Clearfield, IA | 6.6 GWh |
| #1194 | Somerset Windpower LLC | Ohiopyle, PA | 6.6 GWh |
| #1195 | Uilk Wind LLC | Pipestone, MN | 6.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Martin Marietta Wind Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Anthony Wayne Solar #1 | Toledo, OH | 1.7 GWh | 15.5 mi |
| Bay View Backup Power Facility | Toledo, OH | 629.0 MWh | 16.5 mi |
| Bowling Green Generating Station | Bowling Green, OH | 2.8 GWh | 15 mi |
| Bowling Green Peaking | Bowling Green, OH | 2.3 GWh | 15.1 mi |
| Bowling Green Wind | Bowling Green, OH | 3.3 GWh | 20.2 mi |
| Davis Besse | Oak Harbor, OH | 7.1 TWh | 17.1 mi |
| DG AMP Solar Bowling Green | Bowling Green, OH | 38.7 GWh | 12.1 mi |
| FirstEnergy Bay Shore | Oregon, OH | 1.0 TWh | 16 mi |
| Fremont Energy Center | Fremont, OH | 4.2 TWh | 12.3 mi |
| Genoa Diesel Generating Station | Genoa, OH | 239.0 MWh | 3 mi |
| IGS PCW1 | Rossford, OH | 1.9 GWh | 12.3 mi |
| Maumee Solar | Maumee, OH | 1.9 GWh | 18.4 mi |
| Oregon Clean Energy Center | Oregon, OH | 5.9 TWh | 14.5 mi |
| Owens Corning Headquarters | Toledo, OH | 1.5 GWh | 15.1 mi |
| PNA Rossford Solar Array | Rossford, OH | 2.3 GWh | 14.2 mi |
| POET Biorefining - Fostoria | Fostoria, OH | 18.5 GWh | 20.3 mi |
| Temperance Solar, LLC | Erie, MI | 42.2 GWh | 21.4 mi |
| Toledo Ref Power Recovery Train | Oregon, OH | 81.5 MWh | 13.5 mi |
| Troy Energy LLC | Luckey, OH | 1.3 TWh | 4.9 mi |
| Woodville RTO BTM | Woodville, OH | 130.0 MWh | 0.5 mi |