Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Dayton (IA) | City of Dayton - (IA) | Dayton, IA | Midcontinent Independent System Operator, Inc. (MISO) | 16.0 MWh | Sep 2000 | Dec 2024 | Distillate Fuel Oil |
La Porte | La Porte City Utilities | La Porte City, IA | Midcontinent Independent System Operator, Inc. (MISO) | 30.0 MWh | Nov 2000 | Dec 2024 | Distillate Fuel Oil |
Gilliam South | City of Stuart - (IA) | Stuart, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 MWh | Jan 2001 | Dec 2024 | Distillate Fuel Oil |
Farmers Electric Cooperative - Kalona | Farmers Electric Coop - (IA) | Kalona, IA | Midcontinent Independent System Operator, Inc. (MISO) | 83.0 MWh | Feb 2001 | Dec 2024 | Distillate Fuel Oil |
Amana Society Service Company | Amana Society Service Co | Middle Amana, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.0 GWh | Apr 2001 | Dec 2024 | Distillate Fuel Oil |
Harlan | Harlan Municipal Utilities - (IA) | Harlan, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 MWh | Jun 2001 | Dec 2024 | Distillate Fuel Oil |
Earlville | City of Earlville - (IA) | Earlville, IA | Midcontinent Independent System Operator, Inc. (MISO) | 7.0 MWh | Jun 2001 | Dec 2024 | Distillate Fuel Oil |
Coon Rapids II | City of Coon Rapids | Coon Rapids, IA | Southwest Power Pool (SWPP) | 232.0 MWh | Sep 2001 | Dec 2024 | Distillate Fuel Oil |
Old Gold Energy Center, LLC | Old Gold Energy Center, LLC | Joice, IA | Midcontinent Independent System Operator, Inc. (MISO) | 78.4 GWh | Sep 2001 | Dec 2024 | Wind |
Waverly Community Wind Project | Waverly Municipal Elec Utility | Waverly, IA | Midcontinent Independent System Operator, Inc. (MISO) | 6.5 GWh | Nov 2001 | Dec 2024 | Wind |
North Generation Plant | City of Greenfield - (IA) | Greenfield, IA | Midcontinent Independent System Operator, Inc. (MISO) | 105.0 MWh | Dec 2001 | Dec 2024 | Distillate Fuel Oil |
South Strawberry | City of Strawberry Point | Strawberry Point, IA | Midcontinent Independent System Operator, Inc. (MISO) | 13.0 MWh | Dec 2001 | Dec 2024 | Distillate Fuel Oil |
Mt Pleasant | City of Mt Pleasant - (IA) | Mt Pleasant, IA | Associated Electric Cooperative, Inc. (AECI) | 33.0 MWh | Jan 2002 | Dec 2024 | Distillate Fuel Oil |
Brooklyn City North Plant | City of Brooklyn - (IA) | Brooklyn, IA | Midcontinent Independent System Operator, Inc. (MISO) | 14.0 MWh | Apr 2002 | Dec 2024 | Distillate Fuel Oil |
Hancock County Wind Energy Center | FPL Energy Hancock County Wind, LLC | Garner, IA | Midcontinent Independent System Operator, Inc. (MISO) | 268.0 GWh | Nov 2002 | Apr 2025 | Wind |
Greater Des Moines | MidAmerican Energy Co | Pleasant Hill, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 TWh | Apr 2003 | Dec 2024 | Natural Gas |
Villisca Municipal Power Plant | City of Villisca - (IA) | Villisca, IA | Midcontinent Independent System Operator, Inc. (MISO) | 7.0 MWh | May 2003 | Dec 2024 | Distillate Fuel Oil |
Pella Peaking | City of Pella - (IA) | Pella, IA | Midcontinent Independent System Operator, Inc. (MISO) | 227.0 MWh | May 2003 | Dec 2024 | Distillate Fuel Oil |
Alliant SBD0201 Ingredion | Industrial Energy Applications Inc | Cedar Rapids, IA | Midcontinent Independent System Operator, Inc. (MISO) | 18.6 MWh | May 2003 | Dec 2024 | Distillate Fuel Oil |
Flying Cloud Power Partners LLC | Avangrid Power LLC | Lake Park, IA | Midcontinent Independent System Operator, Inc. (MISO) | 81.0 GWh | Nov 2003 | Dec 2024 | Wind |
Otter Creek Ethanol Poet - Ashton | Otter Creek Ethanol LLC - Poet Ashton | Ashton, IA | Midcontinent Independent System Operator, Inc. (MISO) | 42.6 GWh | Feb 2004 | Apr 2025 | Natural Gas |
Exira | Western Minnesota Mun Pwr Agny | Brayton, IA | Southwest Power Pool (SWPP) | 313.7 GWh | Mar 2004 | Dec 2024 | Natural Gas : 99.5% |
Emery Station | Interstate Power and Light Co | Clear Lake, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 TWh | Apr 2004 | Apr 2025 | Natural Gas |
Roquette America | Roquette America | Keokuk, IA | Midcontinent Independent System Operator, Inc. (MISO) | 198.1 GWh | Jun 2004 | Apr 2025 | Natural Gas |
Intrepid | MidAmerican Energy Co | Schaller, IA | Midcontinent Independent System Operator, Inc. (MISO) | 549.4 GWh | Nov 2004 | Dec 2024 | Wind |
Iowa Lakes Community College Wind Farm | Iowa Lakes Community College | Estherville, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Jan 2005 | Apr 2025 | Wind |
Lake Park | City of Lake Park - (IA) | Lake Park, IA | Midcontinent Independent System Operator, Inc. (MISO) | 46.0 MWh | Mar 2005 | Dec 2024 | Distillate Fuel Oil |
Dike City Power Plant | City of Dike | Dike, IA | Midcontinent Independent System Operator, Inc. (MISO) | 50.0 MWh | May 2005 | Dec 2024 | Distillate Fuel Oil |
Century | MidAmerican Energy Co | Blairsburg, IA | Midcontinent Independent System Operator, Inc. (MISO) | 572.0 GWh | Aug 2005 | Dec 2024 | Wind |
Lake Mills Gas Recovery | WM Renewable Energy LLC | Lake Mills, IA | Midcontinent Independent System Operator, Inc. (MISO) | 24.8 GWh | Feb 2006 | Dec 2024 | Landfill Gas |
West Diesel Generation Unit | City of Pocahontas - (IA) | Pocahontas, IA | Midcontinent Independent System Operator, Inc. (MISO) | 10.0 MWh | May 2006 | Dec 2023 | Distillate Fuel Oil |
Victory Wind Farm | MidAmerican Energy Co | Westside, IA | Midcontinent Independent System Operator, Inc. (MISO) | 378.4 GWh | Nov 2006 | Dec 2024 | Wind |
Hardin Hilltop Wind LLC | Junction Hilltop Management LLC | Jefferson, IA | Midcontinent Independent System Operator, Inc. (MISO) | 32.4 GWh | Apr 2007 | Dec 2024 | Wind |
Crosswind Energy Project | Junction Hilltop Management LLC | Ruthven, IA | Southwest Power Pool (SWPP) | 55.3 GWh | May 2007 | Dec 2024 | Wind |
Pomeroy Wind Farm | MidAmerican Energy Co | Fonda, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.0 TWh | Nov 2007 | Apr 2025 | Wind |
Northern Iowa Windpower II | Avangrid Power LLC | Kensett, IA | Midcontinent Independent System Operator, Inc. (MISO) | 130.2 GWh | Dec 2007 | Dec 2024 | Wind |
Top of Iowa Windfarm III | Madison Gas & Electric Co | Kensett, IA | Midcontinent Independent System Operator, Inc. (MISO) | 43.8 GWh | Jan 2008 | Dec 2024 | Wind |
Charles City Wind Farm | MidAmerican Energy Co | Charles City, IA | Midcontinent Independent System Operator, Inc. (MISO) | 274.1 GWh | Mar 2008 | Dec 2024 | Wind |
Osceola Windpower LLC | Osceola Windpower LLC | Harris, IA | Southwest Power Pool (SWPP) | 410.1 GWh | Jun 2008 | Apr 2025 | Wind |
Winnebago Wind Power Project | Avangrid Power LLC | Forest City, IA | Midcontinent Independent System Operator, Inc. (MISO) | 59.3 GWh | Aug 2008 | Dec 2024 | Wind |
Osceola Windpower II | Osceola Windpower II | Harris, IA | Midcontinent Independent System Operator, Inc. (MISO) | 208.2 GWh | Aug 2008 | Apr 2025 | Wind |
Pioneer Prairie Wind Farm | Pioneer Prairie Wind Farm I, LLC | McIntire, IA | Midcontinent Independent System Operator, Inc. (MISO) | 903.9 GWh | Sep 2008 | Apr 2025 | Wind |
Carroll Wind Farm | MidAmerican Energy Co | Carroll, IA | Midcontinent Independent System Operator, Inc. (MISO) | 562.6 GWh | Nov 2008 | Dec 2024 | Wind |
Adair Wind Farm | MidAmerican Energy Co | Adair, IA | Midcontinent Independent System Operator, Inc. (MISO) | 554.8 GWh | Nov 2008 | Dec 2024 | Wind |
Walnut Wind Farm | MidAmerican Energy Co | Walnut, IA | Midcontinent Independent System Operator, Inc. (MISO) | 584.1 GWh | Nov 2008 | Dec 2024 | Wind |
FPL Energy Crystal Lake Wind LLC | FPL Energy Crystal Lake Wind LLC | Britt, IA | Midcontinent Independent System Operator, Inc. (MISO) | 610.9 GWh | Nov 2008 | Apr 2025 | Wind |
FPL Energy Story Wind LLC | FPL Energy Story Wind LLC | Zearing, IA | Midcontinent Independent System Operator, Inc. (MISO) | 555.0 GWh | Nov 2008 | Apr 2025 | Wind |
FPL Energy Crystal Lake Wind II LLC | FPL Energy Crystal Lake Wind II LLC | Britt, IA | Midcontinent Independent System Operator, Inc. (MISO) | 749.8 GWh | Dec 2008 | Apr 2025 | Wind |
Archer Daniels Midland Clinton | Archer Daniels Midland Co | Clinton, IA | Midcontinent Independent System Operator, Inc. (MISO) | 793.3 GWh | Jan 2009 | Apr 2025 | Subbituminous Coal : 90.4% Other Biomass Solids : 8.9% Bituminous Coal : 0.7% |
Lakota Wind Wind Farm | Iowa Lakes Electric Coop | Lakota, IA | Southwest Power Pool (SWPP) | 34.7 GWh | Feb 2009 | Dec 2024 | Wind |
Iowa Lakes Superior Wind Farm | Iowa Lakes Electric Coop | Superior, IA | Southwest Power Pool (SWPP) | 36.0 GWh | Mar 2009 | Dec 2024 | Wind |
Barton Windpower LLC | Avangrid Power LLC | Kensett, IA | Midcontinent Independent System Operator, Inc. (MISO) | 360.9 GWh | May 2009 | Dec 2024 | Wind |
Whispering Willow Wind Farm - East | Interstate Power and Light Co | Iowa Falls, IA | Midcontinent Independent System Operator, Inc. (MISO) | 425.2 GWh | Nov 2009 | Dec 2024 | Wind |
Crane Creek Wind Energy Center | Wisconsin Public Service Corp | Riceville, IA | Midcontinent Independent System Operator, Inc. (MISO) | 302.0 GWh | Nov 2009 | Dec 2024 | Wind |
Lost Lakes Wind Farm LLC | Lost Lakes Wind Farm LLC | Lake Park, IA | Midcontinent Independent System Operator, Inc. (MISO) | 243.7 GWh | Nov 2009 | Dec 2024 | Wind |
Crystal Lake 3 LLC | Crystal Lake 3 LLC | Britt, IA | Midcontinent Independent System Operator, Inc. (MISO) | 249.6 GWh | Nov 2009 | Apr 2025 | Wind |
Garden Wind LLC | Garden Wind LLC | Zearing, IA | Midcontinent Independent System Operator, Inc. (MISO) | 352.5 GWh | Nov 2009 | Apr 2025 | Wind |
Wolverine | Wolverine Wind Energy, LLC | Greenfield, IA | Midcontinent Independent System Operator, Inc. (MISO) | 4.9 GWh | Sep 2010 | Dec 2024 | Wind |
Bulldog | Bulldog Wind Energy, LLC | Orient, IA | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Sep 2010 | Dec 2024 | Wind |
Story City Wind Project | Hamilton Wind Energy LLC | Story City, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Sep 2010 | Dec 2024 | Wind |
Traer Wind Project | City of Traer - (IA) | Traer, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.8 GWh | Sep 2010 | Dec 2024 | Wind |
Windwalkers LLC | Consolidated Edison Development Inc. | Kensett, IA | Midcontinent Independent System Operator, Inc. (MISO) | 3.2 GWh | Aug 2011 | Oct 2024 | Wind |
Roeder Family Wind Farm LLC | Consolidated Edison Development Inc. | Manly, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Aug 2011 | Dec 2024 | Wind |
Luther College Wind Project | Luther College Wind Energy Project LLC | Decorah, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.7 GWh | Sep 2011 | Dec 2024 | Wind |
Buffalo Center Wind LLC | Buffalo Center Wind LLC | Little Cedar, IA | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Oct 2011 | Dec 2024 | Wind |
NLMU Wind | New London Municipal Utilities | New London, IA | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 GWh | Oct 2011 | Dec 2024 | Wind |
Elk Wind Farm | Greenbacker Renewable Energy Corporation | Greeley, IA | Midcontinent Independent System Operator, Inc. (MISO) | 178.3 GWh | Nov 2011 | Dec 2024 | Wind |
Laurel Wind Farm | MidAmerican Energy Co | Laurel, IA | Midcontinent Independent System Operator, Inc. (MISO) | 463.1 GWh | Nov 2011 | Dec 2024 | Wind |
Rolling Hills Wind Farm | MidAmerican Energy Co | Massena, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 TWh | Nov 2011 | Apr 2025 | Wind |
New Harvest Wind Project LLC | Avangrid Power LLC | Schleswig, IA | Midcontinent Independent System Operator, Inc. (MISO) | 287.5 GWh | Nov 2011 | Dec 2024 | Wind |
Pocahontas Prairie Wind Farm | MidAmerican Energy Co | Pomeroy, IA | Midcontinent Independent System Operator, Inc. (MISO) | 382.0 GWh | Jan 2012 | Dec 2024 | Wind |
Kirkwood Wind Turbine | Kirkwood Community College | Cedar Rapids, IA | Midcontinent Independent System Operator, Inc. (MISO) | 223.0 MWh | Jan 2012 | Dec 2023 | Wind |
Junction Hilltop Wind Farm | Junction Hilltop Management LLC | Dana, IA | Midcontinent Independent System Operator, Inc. (MISO) | 25.4 GWh | Feb 2012 | Dec 2024 | Wind |
Wiota | Wiota Wind Energy, LLC #1 | Wiota, IA | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Apr 2012 | Dec 2024 | Wind |
Meadow Ridge | Meadow Ridge Wind Energy, LLC | Greenfield, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.3 GWh | Jun 2012 | Dec 2024 | Wind |
Rippey Wind Farm | Greenbacker Renewable Energy Corporation | Grand Junction, IA | Midcontinent Independent System Operator, Inc. (MISO) | 154.4 GWh | Jul 2012 | Dec 2024 | Wind |
Cumberland Rose | Cumberland Rose Wind Energy, LLC | Orient, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.2 GWh | Jul 2012 | Dec 2024 | Wind |
Fontanelle | Forward Fontanelle Power, LLC | Fontanelle, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.7 GWh | Jul 2012 | Dec 2024 | Wind |
Greenfield Wind | Greenfield Wind Power, LLC | Greenfield, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.3 GWh | Jul 2012 | Dec 2024 | Wind |
Sky Volt | Sky Volt, LLC | Greenfield, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Jul 2012 | Dec 2024 | Wind |
Brooklyn | City of Brooklyn - (IA) | Brooklyn, IA | Midcontinent Independent System Operator, Inc. (MISO) | 18.0 MWh | Aug 2012 | Dec 2024 | Distillate Fuel Oil |
Eclipse Wind Farm | MidAmerican Energy Co | Adair, IA | Midcontinent Independent System Operator, Inc. (MISO) | 859.6 GWh | Aug 2012 | Apr 2025 | Wind |
Hawkeye Wind Farm | Greenbacker Renewable Energy Corporation | Sumner, IA | Midcontinent Independent System Operator, Inc. (MISO) | 173.3 GWh | Sep 2012 | Dec 2024 | Wind |
Morning Light Wind Farm | MidAmerican Energy Co | Adair, IA | Midcontinent Independent System Operator, Inc. (MISO) | 413.3 GWh | Sep 2012 | Dec 2024 | Wind |
Anchor Wind, LLC | Acciona Energy USA Global, LLC | Mechanicsville, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.9 GWh | Sep 2012 | May 2024 | Wind |
Vienna Wind Farm | MidAmerican Energy Co | Marshalltown, IA | Midcontinent Independent System Operator, Inc. (MISO) | 397.6 GWh | Oct 2012 | Dec 2024 | Wind |
Franklin County Wind Farm | Interstate Power and Light Co | Iowa Falls, IA | Midcontinent Independent System Operator, Inc. (MISO) | 190.7 GWh | Nov 2012 | Dec 2024 | Wind |
Gowrie | Gowrie Municipal Utilities | Gowrie, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.0 MWh | Dec 2012 | Dec 2024 | Distillate Fuel Oil |
Lundgren Wind Project | MidAmerican Energy Co | Otho, IA | Midcontinent Independent System Operator, Inc. (MISO) | 804.2 GWh | Jul 2014 | Dec 2024 | Wind |
Macksburg Wind Project | MidAmerican Energy Co | Macksburg, IA | Midcontinent Independent System Operator, Inc. (MISO) | 329.9 GWh | Nov 2014 | Dec 2024 | Wind |
Wellsburg Wind Project | MidAmerican Energy Co | Wellsburg, IA | Midcontinent Independent System Operator, Inc. (MISO) | 468.7 GWh | Nov 2014 | Dec 2024 | Wind |
Carroll Area Wind Farm | SRIV Partnership LLC | Templeton, IA | Midcontinent Independent System Operator, Inc. (MISO) | 53.8 GWh | Dec 2014 | Dec 2024 | Wind |
Highland Wind Project (IA) | MidAmerican Energy Co | Primghar, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 TWh | May 2015 | Apr 2025 | Wind |
Wind GEM | Wind GEM, LLC | Stuart, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Aug 2015 | Dec 2024 | Wind |
Adams Wind | MidAmerican Energy Co | Lenox, IA | Midcontinent Independent System Operator, Inc. (MISO) | 474.5 GWh | Sep 2015 | Dec 2024 | Wind |
Cedar Falls Solar Farm | Altus Power America Management, LLC | Cedar Falls, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Mar 2016 | Dec 2024 | Solar |
Green Energy Machine | Green Energy Machine, LLC | Anita, IA | Midcontinent Independent System Operator, Inc. (MISO) | 6.7 GWh | May 2016 | Dec 2024 | Wind |
O'Brien Wind | MidAmerican Energy Co | Primghar, IA | Midcontinent Independent System Operator, Inc. (MISO) | 875.9 GWh | Aug 2016 | Dec 2024 | Wind |
Ida Grove Wind | MidAmerican Energy Co | Ida Grove, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.1 TWh | Aug 2016 | Dec 2024 | Wind |
Eastern Iowa Solar | Central Iowa Power Cooperative | Wilton, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | Oct 2016 | Dec 2024 | Solar |