Directory of Power Plants in Iowa
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
IA - City of Ames - Airport Road | Forefront Power, LLC | Ames, IA | Midcontinent Independent System Operator, Inc. (MISO) | 3.1 GWh | Nov 2020 | Dec 2023 | Solar |
Bloomfield | City of Bloomfield - (IA) | Bloomfield, IA | Associated Electric Cooperative, Inc. (AECI) | 16.0 MWh | Mar 1945 | Dec 2023 | Distillate Fuel Oil |
West Diesel Generation Unit | City of Pocahontas - (IA) | Pocahontas, IA | Midcontinent Independent System Operator, Inc. (MISO) | 10.0 MWh | May 2006 | Dec 2023 | Distillate Fuel Oil |
POET Biorefining-Hanlontown, LLC | POET Biorefining-Hanlontown, LLC | Hanlontown, IA | Midcontinent Independent System Operator, Inc. (MISO) | 16.1 GWh | Dec 2018 | Dec 2023 | Natural Gas |
Archer Daniels Midland Des Moines | Archer Daniels Midland Co | Des Moines, IA | Midcontinent Independent System Operator, Inc. (MISO) | 6.1 GWh | Apr 1988 | Dec 2023 | Subbituminous Coal |
Bloomfield Municipal Utilities Solar | AEP Onsite Partners, LLC | Bloomfield, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Mar 2019 | Dec 2023 | Solar |
Kirkwood Wind Turbine | Kirkwood Community College | Cedar Rapids, IA | Midcontinent Independent System Operator, Inc. (MISO) | 223.0 MWh | Jan 2012 | Dec 2023 | Wind |
Rock Rapids | Rock Rapids Municipal Utility | Rock Rapids, IA | Southwest Power Pool (SWPP) | 13.0 MWh | Mar 1968 | Dec 2023 | Distillate Fuel Oil |
Ottumwa City of | Ottumwa City of | Ottumwa, IA | Midcontinent Independent System Operator, Inc. (MISO) | 4.5 GWh | Jul 1931 | Apr 2024 | Water |
Anchor Wind, LLC | Acciona Energy USA Global, LLC | Mechanicsville, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.9 GWh | Sep 2012 | May 2024 | Wind |
University of Iowa Main Power Plant | University of Iowa | Iowa City, IA | Midcontinent Independent System Operator, Inc. (MISO) | 3.8 GWh | Dec 1946 | Sep 2024 | Natural Gas : 51.7% Other Biomass Solids : 19.1% Wood/Wood Waste Solids : 18.4% Bituminous Coal : 10.8% |
Windwalkers LLC | Consolidated Edison Development Inc. | Kensett, IA | Midcontinent Independent System Operator, Inc. (MISO) | 3.2 GWh | Aug 2011 | Oct 2024 | Wind |
Alliant SBD 9203 Profol | American Profol Incorporated | Cedar Rapids, IA | Midcontinent Independent System Operator, Inc. (MISO) | 133.0 MWh | Aug 1996 | Nov 2024 | Distillate Fuel Oil |
Macksburg Wind Project | MidAmerican Energy Co | Macksburg, IA | Midcontinent Independent System Operator, Inc. (MISO) | 329.9 GWh | Nov 2014 | Dec 2024 | Wind |
Old Gold Energy Center, LLC | Old Gold Energy Center, LLC | Joice, IA | Midcontinent Independent System Operator, Inc. (MISO) | 78.4 GWh | Sep 2001 | Dec 2024 | Wind |
Hawkeye Power Partners LLC | Hawkeye Power Partners LLC | Garner, IA | Midcontinent Independent System Operator, Inc. (MISO) | 176.1 GWh | Mar 1999 | Dec 2024 | Wind |
Alliant SBD0201 Ingredion | Industrial Energy Applications Inc | Cedar Rapids, IA | Midcontinent Independent System Operator, Inc. (MISO) | 18.6 MWh | May 2003 | Dec 2024 | Distillate Fuel Oil |
Exira | Western Minnesota Mun Pwr Agny | Brayton, IA | Southwest Power Pool (SWPP) | 313.7 GWh | Mar 2004 | Dec 2024 | Natural Gas : 99.5% |
Alliant SBG 9802 Toyota | Industrial Energy Applications Inc | Cedar Rapids, IA | Midcontinent Independent System Operator, Inc. (MISO) | 9.8 MWh | Nov 1998 | Dec 2024 | Natural Gas |
Anderson Erickson | Anderson Erickson Dairy | Des Moines, IA | Midcontinent Independent System Operator, Inc. (MISO) | 19.0 MWh | Mar 2000 | Dec 2024 | Distillate Fuel Oil |
Flying Cloud Power Partners LLC | Avangrid Power LLC | Lake Park, IA | Midcontinent Independent System Operator, Inc. (MISO) | 81.0 GWh | Nov 2003 | Dec 2024 | Wind |
Dike City Power Plant | City of Dike | Dike, IA | Midcontinent Independent System Operator, Inc. (MISO) | 50.0 MWh | May 2005 | Dec 2024 | Distillate Fuel Oil |
Intrepid | MidAmerican Energy Co | Schaller, IA | Midcontinent Independent System Operator, Inc. (MISO) | 549.4 GWh | Nov 2004 | Dec 2024 | Wind |
Century | MidAmerican Energy Co | Blairsburg, IA | Midcontinent Independent System Operator, Inc. (MISO) | 572.0 GWh | Aug 2005 | Dec 2024 | Wind |
Whispering Willow Wind Farm - East | Interstate Power and Light Co | Iowa Falls, IA | Midcontinent Independent System Operator, Inc. (MISO) | 425.2 GWh | Nov 2009 | Dec 2024 | Wind |
Victory Wind Farm | MidAmerican Energy Co | Westside, IA | Midcontinent Independent System Operator, Inc. (MISO) | 378.4 GWh | Nov 2006 | Dec 2024 | Wind |
Northern Iowa Windpower II | Avangrid Power LLC | Kensett, IA | Midcontinent Independent System Operator, Inc. (MISO) | 130.2 GWh | Dec 2007 | Dec 2024 | Wind |
Top of Iowa Windfarm III | Madison Gas & Electric Co | Kensett, IA | Midcontinent Independent System Operator, Inc. (MISO) | 43.8 GWh | Jan 2008 | Dec 2024 | Wind |
Lake Mills Gas Recovery | WM Renewable Energy LLC | Lake Mills, IA | Midcontinent Independent System Operator, Inc. (MISO) | 24.8 GWh | Feb 2006 | Dec 2024 | Landfill Gas |
Charles City Wind Farm | MidAmerican Energy Co | Charles City, IA | Midcontinent Independent System Operator, Inc. (MISO) | 274.1 GWh | Mar 2008 | Dec 2024 | Wind |
Winnebago Wind Power Project | Avangrid Power LLC | Forest City, IA | Midcontinent Independent System Operator, Inc. (MISO) | 59.3 GWh | Aug 2008 | Dec 2024 | Wind |
Barton Windpower LLC | Avangrid Power LLC | Kensett, IA | Midcontinent Independent System Operator, Inc. (MISO) | 360.9 GWh | May 2009 | Dec 2024 | Wind |
Carroll Wind Farm | MidAmerican Energy Co | Carroll, IA | Midcontinent Independent System Operator, Inc. (MISO) | 562.6 GWh | Nov 2008 | Dec 2024 | Wind |
Adair Wind Farm | MidAmerican Energy Co | Adair, IA | Midcontinent Independent System Operator, Inc. (MISO) | 554.8 GWh | Nov 2008 | Dec 2024 | Wind |
Crane Creek Wind Energy Center | Wisconsin Public Service Corp | Riceville, IA | Midcontinent Independent System Operator, Inc. (MISO) | 302.0 GWh | Nov 2009 | Dec 2024 | Wind |
Crosswind Energy Project | Junction Hilltop Management LLC | Ruthven, IA | Southwest Power Pool (SWPP) | 55.3 GWh | May 2007 | Dec 2024 | Wind |
Hardin Hilltop Wind LLC | Junction Hilltop Management LLC | Jefferson, IA | Midcontinent Independent System Operator, Inc. (MISO) | 32.4 GWh | Apr 2007 | Dec 2024 | Wind |
Lost Lakes Wind Farm LLC | Lost Lakes Wind Farm LLC | Lake Park, IA | Midcontinent Independent System Operator, Inc. (MISO) | 243.7 GWh | Nov 2009 | Dec 2024 | Wind |
Waverly Community Wind Project | Waverly Municipal Elec Utility | Waverly, IA | Midcontinent Independent System Operator, Inc. (MISO) | 6.5 GWh | Nov 2001 | Dec 2024 | Wind |
Lakota Wind Wind Farm | Iowa Lakes Electric Coop | Lakota, IA | Southwest Power Pool (SWPP) | 34.7 GWh | Feb 2009 | Dec 2024 | Wind |
Iowa Lakes Superior Wind Farm | Iowa Lakes Electric Coop | Superior, IA | Southwest Power Pool (SWPP) | 36.0 GWh | Mar 2009 | Dec 2024 | Wind |
Elk Wind Farm | Greenbacker Renewable Energy Corporation | Greeley, IA | Midcontinent Independent System Operator, Inc. (MISO) | 178.3 GWh | Nov 2011 | Dec 2024 | Wind |
Laurel Wind Farm | MidAmerican Energy Co | Laurel, IA | Midcontinent Independent System Operator, Inc. (MISO) | 463.1 GWh | Nov 2011 | Dec 2024 | Wind |
New Harvest Wind Project LLC | Avangrid Power LLC | Schleswig, IA | Midcontinent Independent System Operator, Inc. (MISO) | 287.5 GWh | Nov 2011 | Dec 2024 | Wind |
Wolverine | Wolverine Wind Energy, LLC | Greenfield, IA | Midcontinent Independent System Operator, Inc. (MISO) | 4.9 GWh | Sep 2010 | Dec 2024 | Wind |
Bulldog | Bulldog Wind Energy, LLC | Orient, IA | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Sep 2010 | Dec 2024 | Wind |
Rippey Wind Farm | Greenbacker Renewable Energy Corporation | Grand Junction, IA | Midcontinent Independent System Operator, Inc. (MISO) | 154.4 GWh | Jul 2012 | Dec 2024 | Wind |
Hawkeye Wind Farm | Greenbacker Renewable Energy Corporation | Sumner, IA | Midcontinent Independent System Operator, Inc. (MISO) | 173.3 GWh | Sep 2012 | Dec 2024 | Wind |
Franklin County Wind Farm | Interstate Power and Light Co | Iowa Falls, IA | Midcontinent Independent System Operator, Inc. (MISO) | 190.7 GWh | Nov 2012 | Dec 2024 | Wind |
Vienna Wind Farm | MidAmerican Energy Co | Marshalltown, IA | Midcontinent Independent System Operator, Inc. (MISO) | 397.6 GWh | Oct 2012 | Dec 2024 | Wind |
Morning Light Wind Farm | MidAmerican Energy Co | Adair, IA | Midcontinent Independent System Operator, Inc. (MISO) | 413.3 GWh | Sep 2012 | Dec 2024 | Wind |
Pocahontas Prairie Wind Farm | MidAmerican Energy Co | Pomeroy, IA | Midcontinent Independent System Operator, Inc. (MISO) | 382.0 GWh | Jan 2012 | Dec 2024 | Wind |
Buffalo Center Wind LLC | Buffalo Center Wind LLC | Little Cedar, IA | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Oct 2011 | Dec 2024 | Wind |
Roeder Family Wind Farm LLC | Consolidated Edison Development Inc. | Manly, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Aug 2011 | Dec 2024 | Wind |
Luther College Wind Project | Luther College Wind Energy Project LLC | Decorah, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.7 GWh | Sep 2011 | Dec 2024 | Wind |
NLMU Wind | New London Municipal Utilities | New London, IA | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 GWh | Oct 2011 | Dec 2024 | Wind |
Junction Hilltop Wind Farm | Junction Hilltop Management LLC | Dana, IA | Midcontinent Independent System Operator, Inc. (MISO) | 25.4 GWh | Feb 2012 | Dec 2024 | Wind |
Cumberland Rose | Cumberland Rose Wind Energy, LLC | Orient, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.2 GWh | Jul 2012 | Dec 2024 | Wind |
Fontanelle | Forward Fontanelle Power, LLC | Fontanelle, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.7 GWh | Jul 2012 | Dec 2024 | Wind |
Greenfield Wind | Greenfield Wind Power, LLC | Greenfield, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.3 GWh | Jul 2012 | Dec 2024 | Wind |
Meadow Ridge | Meadow Ridge Wind Energy, LLC | Greenfield, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.3 GWh | Jun 2012 | Dec 2024 | Wind |
August Wind Farm | August Wind Energy, LLC | Clearfield, IA | Midcontinent Independent System Operator, Inc. (MISO) | 6.5 GWh | Jan 2017 | Dec 2024 | Wind |
Poet Bioprocessing Emmetsburg | Poet Bioprocessing Emmetsburg | Emmetsburg, IA | Midcontinent Independent System Operator, Inc. (MISO) | 18.0 GWh | Nov 2023 | Dec 2024 | Natural Gas : 83.1% Other Biomass Solids : 16.9% |
DPC Madison | SoCore Energy LLC | Ridgeway, IA | Midcontinent Independent System Operator, Inc. (MISO) | 3.1 GWh | Jan 2019 | Dec 2024 | Solar |
Perry Customer Hosted 1MW Solar Project | Interstate Power and Light Co | Perry, IA | Midcontinent Independent System Operator, Inc. (MISO) | 739.0 MWh | Jun 2024 | Dec 2024 | Solar |
ISU Customer Hosted 1MW Solar Project | Interstate Power and Light Co | Ames, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Apr 2024 | Dec 2024 | Solar |
Hy-Vee Customer Hosted 2.25MW Solar | Interstate Power and Light Co | Chariton, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Jun 2024 | Dec 2024 | Solar |
Fareway Customer Hosted 1 MW Solar | Interstate Power and Light Co | Boone, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.1 GWh | Apr 2024 | Dec 2024 | Solar |
Cedar Rapids Community Solar | Interstate Power and Light Co | Cedar Rapids, IA | Midcontinent Independent System Operator, Inc. (MISO) | 7.7 GWh | Jan 2024 | Dec 2024 | Solar |
Maple City | Greenbacker Renewable Energy Corporation | Osage Township, IA | Associated Electric Cooperative, Inc. (AECI) | 3.1 GWh | Nov 2022 | Dec 2024 | Solar |
Neal Energy Center Solar | MidAmerican Energy Co | Salix, IA | Midcontinent Independent System Operator, Inc. (MISO) | 7.4 GWh | Jan 2022 | Dec 2024 | Solar |
Grinnell College | Azimuth 180 Solar Electric, LLC | Grinnell, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Mar 2024 | Dec 2024 | Solar |
Franklin County Solar | MidAmerican Energy Co | Hampton, IA | Midcontinent Independent System Operator, Inc. (MISO) | 11.7 GWh | Dec 2021 | Dec 2024 | Solar |
Johnson County Hills Solar | MidAmerican Energy Co | Iowa City, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.6 GWh | Dec 2021 | Dec 2024 | Solar |
Waterloo Solar (IA) | MidAmerican Energy Co | Waterloo, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.9 GWh | Feb 2022 | Dec 2024 | Solar |
Downtown Generation Plant | City of Greenfield - (IA) | Greenfield, IA | Midcontinent Independent System Operator, Inc. (MISO) | 58.0 MWh | Jun 2020 | Dec 2024 | Distillate Fuel Oil |
CED Centerville Wind | Consolidated Edison Development Inc. | Centerville, IA | Midcontinent Independent System Operator, Inc. (MISO) | 26.6 GWh | Nov 2021 | Dec 2024 | Wind |
CED Manchester Wind | Consolidated Edison Development Inc. | Manchester, IA | Midcontinent Independent System Operator, Inc. (MISO) | 31.0 GWh | Mar 2022 | Dec 2024 | Wind |
POET Biorefining - Gowrie | POET Biorefining - Gowrie | Gowrie, IA | Midcontinent Independent System Operator, Inc. (MISO) | 20.9 GWh | Oct 2018 | Dec 2024 | Natural Gas |
POET Biorefining LLC - Corning | POET Biorefining LLC - Corning | Corning, IA | Midcontinent Independent System Operator, Inc. (MISO) | 14.0 GWh | Sep 2018 | Dec 2024 | Natural Gas |
POET Biorefining - Jewell | POET Biorefining - Jewell | Jewell, IA | Midcontinent Independent System Operator, Inc. (MISO) | 21.7 GWh | Feb 2019 | Dec 2024 | Natural Gas |
CED Mason City Wind | Consolidated Edison Development Inc. | Mason City, IA | Midcontinent Independent System Operator, Inc. (MISO) | 23.9 GWh | Apr 2020 | Dec 2024 | Wind |
Forest City Solar | Butter Solar, LLC | Forest City, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Aug 2019 | Dec 2024 | Solar |
Farmers Electric Cooperative - Kalona | Farmers Electric Coop - (IA) | Kalona, IA | Midcontinent Independent System Operator, Inc. (MISO) | 83.0 MWh | Feb 2001 | Dec 2024 | Distillate Fuel Oil |
Cedar Falls Solar Farm | Altus Power America Management, LLC | Cedar Falls, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Mar 2016 | Dec 2024 | Solar |
Birch | Birch Power LLC | Clearfield, IA | Midcontinent Independent System Operator, Inc. (MISO) | 6.9 GWh | Jan 2017 | Dec 2024 | Wind |
Roseman | Roseman Energy, LLC | Anita, IA | Midcontinent Independent System Operator, Inc. (MISO) | 7.2 GWh | Jan 2017 | Dec 2024 | Wind |
Amana Society Service Company | Amana Society Service Co | Middle Amana, IA | Midcontinent Independent System Operator, Inc. (MISO) | 1.0 GWh | Apr 2001 | Dec 2024 | Distillate Fuel Oil |
Traer Wind Project | City of Traer - (IA) | Traer, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.8 GWh | Sep 2010 | Dec 2024 | Wind |
Optimum Wind 4 LLC | Optimum Wind 4 LLC | Nevada, IA | Midcontinent Independent System Operator, Inc. (MISO) | 10.5 GWh | Feb 2017 | Dec 2024 | Wind |
Optimum Wind 7 LLC | Optimum Wind 7 LLC | Nevada, IA | Midcontinent Independent System Operator, Inc. (MISO) | 11.0 GWh | Feb 2017 | Dec 2024 | Wind |
Optimum Wind 6 LLC | Optimum Wind 6 LLC | Nevada, IA | Midcontinent Independent System Operator, Inc. (MISO) | 8.7 GWh | Feb 2017 | Dec 2024 | Wind |
Optimum Wind 5 LLC | Optimum Wind 5 LLC | Nevada, IA | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 GWh | Feb 2017 | Dec 2024 | Wind |
Carroll Area Wind Farm | SRIV Partnership LLC | Templeton, IA | Midcontinent Independent System Operator, Inc. (MISO) | 53.8 GWh | Dec 2014 | Dec 2024 | Wind |
Michelangelo Wind 3 LLC | Michelangelo Wind 3 LLC | Huxley, IA | Midcontinent Independent System Operator, Inc. (MISO) | 8.6 GWh | Jan 2017 | Dec 2024 | Wind |
Walnut Wind Farm | MidAmerican Energy Co | Walnut, IA | Midcontinent Independent System Operator, Inc. (MISO) | 584.1 GWh | Nov 2008 | Dec 2024 | Wind |
Wiota | Wiota Wind Energy, LLC #1 | Wiota, IA | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Apr 2012 | Dec 2024 | Wind |
Lundgren Wind Project | MidAmerican Energy Co | Otho, IA | Midcontinent Independent System Operator, Inc. (MISO) | 804.2 GWh | Jul 2014 | Dec 2024 | Wind |
Optimum Wind 3 LLC | Optimum Wind 3 LLC | Nevada, IA | Midcontinent Independent System Operator, Inc. (MISO) | 10.4 GWh | Feb 2017 | Dec 2024 | Wind |
Wellsburg Wind Project | MidAmerican Energy Co | Wellsburg, IA | Midcontinent Independent System Operator, Inc. (MISO) | 468.7 GWh | Nov 2014 | Dec 2024 | Wind |