Michelangelo Wind 1 LLC
535th St & Hwy 210, Huxley, IA 50124Plant Summary Information
Michelangelo Wind 1 LLC is ranked #90 out of 123 wind farms in Iowa in terms of total annual net electricity generation.
Michelangelo Wind 1 LLC generated 3.2 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Michelangelo Wind 1 LLC |
|---|---|
| Utility Name | Novis Renewables, LLC |
| Location | Story County, IA |
| Initial Operation Date | March 2017 |
| Last Update | Dec 2025 |
| Annual Generation | 10.2 GWh |
| Annual Consumption | 36.8 k MMBtu |
| Ranked #6,197 out of 13,081 Power Plants Nationwide | |
| Ranked #1,144 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #131 out of 283 Iowa Power Plants | |
| Ranked #90 out of 123 Iowa Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Michelangelo Wind 1 LLC (2013 to 2024) Novis Renewables, LLC (2025 to 2025) |
Map of Michelangelo Wind 1 LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Michelangelo Wind 1 LLC.
Monthly Net Generation for Michelangelo Wind 1 LLC
Monthly Plant Fuel Consumption for Michelangelo Wind 1 LLC
Michelangelo Wind 1 LLC Details
| Summary Information | |
|---|---|
| Plant Name | Michelangelo Wind 1 LLC (59231) |
| Plant Address | 535th St & Hwy 210, Huxley, IA 50124 |
| Utility | Novis Renewables, LLC (67467) |
| Latitude, Longitude | 41.881, -93.62306 |
| Generation Dates on File | Mar 2017 to Dec 2025 |
| Initial Operation Date | March 2017 |
| Annual Generation | 10.2 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF13-616-001 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Interstate Power and Light Co (9417) IA |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator WT1 Details Operating March 2017
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 3 MW |
| Summer Capacity | 3 MW |
| Winter Capacity | 3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2017 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 1 |
| Turbine Details | |
| Number Of Turbines | 1 |
|---|---|
| Predominant Turbine Manufacturer | Acciona |
| Predominant Turbine Model Number | AW125/3000 |
| Design Wind Speed | 22.8 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 287 |
Michelangelo Wind 1 LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1134 | Wind Turbine | Casco, WI | 12.0 GWh |
| #1135 | UL Advanced Wind Turbine Test Facility | Canyon, TX | 12.0 GWh |
| #1136 | Cisco | Brewster, MN | 11.9 GWh |
| #1137 | Western Plains Wind | Oakley, KS | 11.7 GWh |
| #1138 | Holiday Hill Community Wind | Russell, MA | 11.6 GWh |
| #1139 | Polk County Renewables, LLC | Osceola, NE | 11.5 GWh |
| #1140 | Beaver Ridge Wind | Freedom, ME | 10.9 GWh |
| #1141 | Cuming County Renewables, LLC | Wisner, NE | 10.6 GWh |
| #1142 | Wind Colebrook South | Colebrook, CT | 10.5 GWh |
| #1143 | Fort Hays State University Wind Farm | Hays, KS | 10.3 GWh |
| #1145 | Springview | Springview, NE | 10.2 GWh |
| #1146 | Adams Wind Farm | Adams, MN | 10.2 GWh |
| #1147 | Wagner Wind LLC | Palm Springs, CA | 10.1 GWh |
| #1148 | Michelangelo Wind 4 LLC | Ames, IA | 9.9 GWh |
| #1149 | Searsburg Wind Turbine | Searsburg, VT | 9.9 GWh |
| #1150 | Michelangelo Wind 3 LLC | Huxley, IA | 9.9 GWh |
| #1151 | GL Wind | Lewiston, MN | 9.8 GWh |
| #1152 | Cashton Greens Wind Farm | Cashton, WI | 9.8 GWh |
| #1153 | Broadview Energy Prime 2 | Grady, NM | 9.8 GWh |
| #1154 | Butter Creek Power LLC | Echo, OR | 9.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Michelangelo Wind 1 LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ames Electric Services Power Plant | Ames, IA | 285.0 GWh | 10 mi |
| Anderson Erickson | Des Moines, IA | 9.0 MWh | 19.5 mi |
| Archer Daniels Midland Des Moines | Des Moines, IA | 1.9 GWh | 17.8 mi |
| Des Moines Wastewater Reclamation Fac | Des Moines, IA | 74.5 MWh | 21.5 mi |
| Fareway Customer Hosted 1 MW Solar | Boone, IA | 1.9 GWh | 17.4 mi |
| IA - City of Ames - Airport Road | Ames, IA | 3.1 GWh | 8.4 mi |
| Iowa State University | Ames, IA | 71.0 GWh | 10.2 mi |
| ISU Customer Hosted 1MW Solar Project | Ames, IA | 2.5 GWh | 7 mi |
| Michelangelo Wind 3 LLC | Huxley, IA | 9.9 GWh | 11.1 mi |
| Michelangelo Wind 4 LLC | Ames, IA | 9.9 GWh | 7.8 mi |
| NCAH Central Utility Plant | Ames, IA | 439.1 MWh | 11.6 mi |
| Optimum Wind 3 LLC | Nevada, IA | 7.4 GWh | 11.1 mi |
| Optimum Wind 4 LLC | Nevada, IA | 8.2 GWh | 10.9 mi |
| Optimum Wind 5 LLC | Nevada, IA | 8.7 GWh | 10.7 mi |
| Optimum Wind 6 LLC | Nevada, IA | 9.5 GWh | 10.1 mi |
| Optimum Wind 7 LLC | Nevada, IA | 9.2 GWh | 14.2 mi |
| River Hills | Des Moines, IA | 2.2 GWh | 20.1 mi |
| Story City | Story City, IA | 315.0 MWh | 21.1 mi |
| Story City Wind Project | Story City, IA | 5.2 GWh | 22.6 mi |
| Sycamore (IA) | Johnston, IA | 30.5 GWh | 14.7 mi |