Directory of Power Plants in Wisconsin
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Fond du Lac Community Solar | SoCore Energy LLC | Fond Du Lac, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2021 | Dec 2024 | Solar |
UW Parkside | Wisconsin Electric Power Co | Kenosha, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Oct 2020 | Dec 2024 | Solar |
Lannon Stone | Wisconsin Electric Power Co | Pewaukee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Nov 2021 | Dec 2024 | Solar |
Adams PV Plant | Adams PV Plant (WI) | Adams, WI | Midcontinent Independent System Operator, Inc. (MISO) | 16.8 GWh | Jun 2023 | Dec 2024 | Solar |
Portage Solar Plant | Portage Solar Plant | Portage, WI | Midcontinent Independent System Operator, Inc. (MISO) | 22.8 GWh | May 2023 | Dec 2024 | Solar |
Antigo-Forrest Street Solar Project | Wisconsin Public Service Corp | Antigo, WI | Midcontinent Independent System Operator, Inc. (MISO) | 279.0 MWh | Oct 2024 | Dec 2024 | Solar |
Auburn Solar WI, LLC | Wisconsin Electric Power Co | Campbellsport, WI | Midcontinent Independent System Operator, Inc. (MISO) | 80.0 MWh | Nov 2024 | Dec 2024 | Solar |
Bonduel Solar WI, LLC | Wisconsin Electric Power Co | Bonduel, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Nov 2023 | Feb 2024 | Solar |
Hackbarth Solar WI, LLC | Wisconsin Electric Power Co | Fort Atkinson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 30.0 MWh | Nov 2024 | Dec 2024 | Solar |
Jackson Solar WI, LLC | Wisconsin Electric Power Co | Cedarburg, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Nov 2023 | May 2024 | Solar |
LaFayette Solar WI, LLC | Wisconsin Electric Power Co | Elkhorn, WI | Midcontinent Independent System Operator, Inc. (MISO) | 15.0 MWh | Nov 2024 | Dec 2024 | Solar |
Silver Lake Solar WI, LLC | Wisconsin Electric Power Co | Salem, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2023 | May 2024 | Solar |
Spring Prairie Solar WI, LLC | Wisconsin Electric Power Co | Burlington, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | Nov 2023 | May 2024 | Solar |
Washington County | Wisconsin Electric Power Co | West Bend, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.8 GWh | Dec 2019 | Dec 2024 | Solar |
Lake Hallie | Standard Solar | Chippewa Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.0 MWh | - | Dec 2024 | Solar |
Bluff Prairie (Vernon) | Greenbacker Renewable Energy Corporation | De Soto, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.7 GWh | Oct 2023 | Dec 2024 | Solar |
Blue Prairie Solar, LLC | Greenbacker Renewable Energy Corporation | Black River Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.8 GWh | Jul 2021 | Dec 2024 | Solar |
O'Brien Solar Fields | Madison Gas & Electric Co | Fitchburg, WI | Midcontinent Independent System Operator, Inc. (MISO) | 38.5 GWh | Apr 2021 | Dec 2024 | Solar |
Darien Solar | Wisconsin Electric Power Co | Darien, WI | Midcontinent Independent System Operator, Inc. (MISO) | 60.7 GWh | - | Apr 2025 | Solar |
Point Beach Solar | Point Beach Solar | Two Creeks, WI | Midcontinent Independent System Operator, Inc. (MISO) | 209.0 GWh | Aug 2021 | Apr 2025 | Solar |
Badger Hollow II | Wisconsin Electric Power Co | Cobb, WI | Midcontinent Independent System Operator, Inc. (MISO) | 201.9 GWh | Nov 2023 | Apr 2025 | Solar |
Dane County Airport Solar | Madison Gas & Electric Co | Madison, WI | Midcontinent Independent System Operator, Inc. (MISO) | 17.7 GWh | Nov 2020 | Dec 2024 | Solar |
West Riverside Energy Center | Wisconsin Power & Light Co | Beloit, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.6 TWh | Apr 2020 | Apr 2025 | Natural Gas : 99.9% |
Two Creeks Solar | Wisconsin Public Service Corp | Two Rivers, WI | Midcontinent Independent System Operator, Inc. (MISO) | 200.4 GWh | Oct 2020 | Apr 2025 | Solar |
Badger Hollow I | Wisconsin Public Service Corp | Montfort, WI | Midcontinent Independent System Operator, Inc. (MISO) | 200.6 GWh | Oct 2021 | Apr 2025 | Solar |
Popple Creek (Clark 1) | Greenbacker Renewable Energy Corporation | Colby, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2024 | Dec 2024 | Solar |
Barron Solar Array | AEP Onsite Partners, LLC | Barron, WI | Midcontinent Independent System Operator, Inc. (MISO) | 5.8 GWh | Jul 2021 | Dec 2024 | Solar |
Strobus | Greenbacker Renewable Energy Corporation | Merrillan, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 GWh | Aug 2021 | Dec 2024 | Solar |
Paddock Solar | Wisconsin Power & Light Co | Beloit, WI | Midcontinent Independent System Operator, Inc. (MISO) | 130.7 GWh | Oct 2023 | Apr 2025 | Solar |
Wautoma Solar | Wisconsin Power & Light Co | Wautoma, WI | Midcontinent Independent System Operator, Inc. (MISO) | 188.3 GWh | Nov 2023 | Apr 2025 | Solar |
Beaver Dam Solar | Wisconsin Power & Light Co | Dodge, WI | Midcontinent Independent System Operator, Inc. (MISO) | 97.5 GWh | Nov 2023 | Apr 2025 | Solar |
Grant County | Wisconsin Power & Light Co | Town of Potosi, WI | Midcontinent Independent System Operator, Inc. (MISO) | 307.6 GWh | Apr 2024 | Apr 2025 | Solar |
Onion River | Wisconsin Power & Light Co | Sheboygan Cedar Grove, WI | Midcontinent Independent System Operator, Inc. (MISO) | 214.1 GWh | Nov 2023 | Apr 2025 | Solar |
Bear Creek | Wisconsin Power & Light Co | Lone Rock, WI | Midcontinent Independent System Operator, Inc. (MISO) | 98.7 GWh | Aug 2022 | Apr 2025 | Solar |
North Rock | Wisconsin Power & Light Co | Edgerton, WI | Midcontinent Independent System Operator, Inc. (MISO) | 99.2 GWh | Sep 2022 | Apr 2025 | Solar |
Albany Solar (WI) | Wisconsin Power & Light Co | Broadhead, WI | Midcontinent Independent System Operator, Inc. (MISO) | 91.0 GWh | Nov 2023 | Apr 2025 | Solar |
Hay River (Dunn 1) | Greenbacker Renewable Energy Corporation | Boyceville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Jan 2024 | Dec 2024 | Solar |
Walleye (Dunn 2) | Greenbacker Renewable Energy Corporation | Colefax, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Jan 2024 | Dec 2024 | Solar |
Elroy Solar | Butter Solar, LLC | Mauston, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.5 GWh | Aug 2019 | Dec 2024 | Solar |
Trimbelle (Pierce Pepin) | Greenbacker Renewable Energy Corporation | Hager City, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 GWh | Jan 2024 | Dec 2024 | Solar |
Ogema | Greenbacker Renewable Energy Corporation | Ogema, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Feb 2024 | Dec 2024 | Solar |
Ledgeview | Greenbacker Renewable Energy Corporation | Fond du Lac, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Jul 2024 | Dec 2024 | Solar |
Wolf River (Chipewa 1) | Greenbacker Renewable Energy Corporation | Stanley, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Jan 2024 | Dec 2024 | Solar |
Tyto Solar | Madison Gas & Electric Co | Fitchburg, WI | Midcontinent Independent System Operator, Inc. (MISO) | 10.8 GWh | Jan 2024 | Dec 2024 | Solar |
Harley-Davison Powertrain Operations | Wisconsin Electric Power Co | Menomonee Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Sep 2020 | Dec 2024 | Solar |
City of Milwaukee Landfill | Wisconsin Electric Power Co | Milwaukee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Jan 2021 | Dec 2024 | Solar |
ATI | Wisconsin Electric Power Co | Cudahy, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Oct 2020 | Dec 2024 | Solar |
CREE | Wisconsin Electric Power Co | Racine, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 GWh | Jul 2021 | Dec 2024 | Solar |
Jones Dairy | Wisconsin Electric Power Co | Fort Atkinson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jun 2021 | Dec 2024 | Solar |
Regal Ware | Wisconsin Electric Power Co | West Bend, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Mar 2021 | Dec 2024 | Solar |
Butler Ridge | Butler Ridge Wind Energy Center | Mayville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 142.8 GWh | Jan 2009 | Apr 2025 | Wind |
Jefferson Solar Park | Concord New Energy | Jefferson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 918.0 MWh | Nov 2013 | Oct 2024 | Solar |
Waxdale | S.C. Johnson & Son, Inc. | Sturtevant, WI | Midcontinent Independent System Operator, Inc. (MISO) | 37.5 GWh | Nov 2003 | Apr 2025 | Natural Gas : 45.3% Landfill Gas : 35.7% Wind : 10.3% Solar : 8.7% |
Richland Center Renewable Energy LLC | Richland Center Renewable Energy LLC | Richland Center, WI | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 GWh | Feb 2013 | Dec 2024 | Other Biomass Gas |
Viresco Turtle Lake | Viresco Turtle Lake | Turtle Lake, WI | Midcontinent Independent System Operator, Inc. (MISO) | 7.8 GWh | Aug 2013 | Dec 2024 | Other Biomass Gas |
Rothschild Biomass Cogen Facility | Wisconsin Electric Power Co | Rothschild, WI | Midcontinent Independent System Operator, Inc. (MISO) | 152.8 GWh | Oct 2013 | Dec 2024 | Wood/Wood Waste Solids : 97.4% Natural Gas : 2.6% |
Cashton Greens Wind Farm | Cashton Greens Wind Farm LLC | Cashton, WI | Midcontinent Independent System Operator, Inc. (MISO) | 10.7 GWh | Apr 2012 | Dec 2024 | Wind |
Onalaska Campus Landfill Biogas | Gundersen Lutheran Biogas I LLC | Onalaska, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 GWh | Feb 2012 | Dec 2024 | Landfill Gas |
Shirley Wind | Duke Energy Renewables Services | Denmark, WI | Midcontinent Independent System Operator, Inc. (MISO) | 59.5 GWh | Oct 2010 | Dec 2024 | Wind |
Glacier Hills | Wisconsin Electric Power Co | Cambria, WI | Midcontinent Independent System Operator, Inc. (MISO) | 383.8 GWh | Nov 2011 | Apr 2025 | Wind |
Little Quinnesec Falls Hydro Project | Eagle Creek Renewable Energy, LLC | Niagara, WI | Midcontinent Independent System Operator, Inc. (MISO) | 56.6 GWh | Nov 1900 | Dec 2024 | Water |
Quilt Block Wind Farm LLC | Quilt Block Wind Farm LLC | Darlington, WI | Midcontinent Independent System Operator, Inc. (MISO) | 400.9 GWh | Aug 2017 | Apr 2025 | Wind |
Forward Wind Energy Center | Wisconsin Public Service Corp | Brownsville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 149.3 GWh | Jun 2008 | Apr 2025 | Wind |
Twin Falls (WI) | Wisconsin Electric Power Co | Florence, WI | Midcontinent Independent System Operator, Inc. (MISO) | 30.7 GWh | Jun 2016 | Dec 2024 | Water |
Timberline Trail Gas Recovery | WM Renewable Energy LLC | Weyerhaeser, WI | Midcontinent Independent System Operator, Inc. (MISO) | 18.9 GWh | Jan 2006 | Dec 2024 | Landfill Gas |
Deertrack Park Gas Recovery | WM Renewable Energy LLC | Watertown, WI | Midcontinent Independent System Operator, Inc. (MISO) | 37.0 GWh | Jan 2006 | Dec 2024 | Landfill Gas |
Marshfield Utilities Gas Plant | City of Marshfield - (WI) | Marshfield, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | May 2011 | Dec 2024 | Natural Gas |
Ameresco Janesville | AMERESCO Janesville LLC | Janesville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 9.1 GWh | Sep 2004 | Dec 2024 | Landfill Gas |
Blue Sky Green Field Wind Project | Wisconsin Electric Power Co | Fond du Lac, WI | Midcontinent Independent System Operator, Inc. (MISO) | 345.7 GWh | Apr 2008 | Apr 2025 | Wind |
Cedar Ridge | Wisconsin Power & Light Co | Eden, WI | Midcontinent Independent System Operator, Inc. (MISO) | 174.6 GWh | Nov 2008 | Dec 2024 | Wind |
Sheboygan Falls | Wisconsin Power & Light Co | Sheboygan, WI | Midcontinent Independent System Operator, Inc. (MISO) | 642.5 GWh | May 2005 | Dec 2024 | Natural Gas |
Diesel Generators | Madison Gas & Electric Co | Madison, WI | Midcontinent Independent System Operator, Inc. (MISO) | 499.0 MWh | May 2001 | Apr 2025 | Distillate Fuel Oil |
Berlin Landfill Gas | WM Renewable Energy LLC | Berlin, WI | Midcontinent Independent System Operator, Inc. (MISO) | 13.6 GWh | Jul 2001 | Dec 2024 | Landfill Gas |
Elm Road Generating Station | Wisconsin Electric Power Co | Oak Creek, WI | Midcontinent Independent System Operator, Inc. (MISO) | 8.3 TWh | Jan 2010 | Apr 2025 | Subbituminous Coal : 71.5% Bituminous Coal : 18.2% Natural Gas : 10.3% |
Fox Energy Center | Wisconsin Public Service Corp | Wrightstown, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 TWh | May 2005 | Mar 2025 | Natural Gas |
Sand Lake DPC Solar | SoCore Energy LLC | Centuria, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Oct 2017 | Dec 2024 | Solar |
Cashton Solar | Butter Solar, LLC | Cashton, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.2 GWh | Aug 2019 | Dec 2024 | Solar |
Cumberland Solar | Butter Solar, LLC | Cumberland, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Aug 2019 | Dec 2024 | Solar |
New Lisbon Solar | Butter Solar, LLC | New Lisbon, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Aug 2019 | Dec 2024 | Solar |
Fennimore Solar | Butter Solar, LLC | Fennimore, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Aug 2019 | Dec 2024 | Solar |
Arcadia Solar | Butter Solar, LLC | Arcadia, WI | Midcontinent Independent System Operator, Inc. (MISO) | 8.5 GWh | Aug 2019 | Dec 2024 | Solar |
Middleton Airport Solar | Madison Gas & Electric Co | Middleton, WI | Midcontinent Independent System Operator, Inc. (MISO) | 8.2 GWh | Jun 2020 | Dec 2024 | Solar |
Epic Verona | Epic Hosting, LLC | Verona, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.7 GWh | May 2009 | Dec 2024 | Solar : 91.9% Distillate Fuel Oil : 8.1% |
Galactic Wind | Galactic Wind | Waunakee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 22.0 GWh | Nov 2012 | Dec 2024 | Wind |
Beloit Memorial Hospital Power Plant | Beloit Memorial Hospital | Beloit, WI | Midcontinent Independent System Operator, Inc. (MISO) | 70.6 MWh | May 2000 | Dec 2024 | Natural Gas : 72.9% Distillate Fuel Oil : 27.1% |
IKEA Oak Creek Rooftop PV System | IKEA Property Inc | Oak Creek, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | May 2018 | Dec 2024 | Solar |
Fiber Recovery, Inc. | Fiber Recovery, Inc | Ringle, WI | Midcontinent Independent System Operator, Inc. (MISO) | 6.5 GWh | Dec 2007 | Dec 2024 | Landfill Gas |
Flambeau Solar Partners | Flambeau Solar Partners, LLC | Phillips, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Apr 2017 | Dec 2024 | Solar |
Rice Lake Solar Array | AEP Onsite Partners, LLC | Rice Lake, WI | Midcontinent Independent System Operator, Inc. (MISO) | 6.9 GWh | May 2019 | Dec 2024 | Solar |
New Auburn DPC Solar | SoCore Energy LLC | New Auburn, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.5 GWh | Dec 2017 | Apr 2025 | Solar |
Whistling Winds DPC Solar | SoCore Energy LLC | New Lisbon, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | May 2017 | Apr 2025 | Solar |
Medford DPC Solar | SoCore Energy LLC | Medford, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.7 GWh | Jan 2017 | Apr 2025 | Solar |
Mt. Hope DPC Solar | SoCore Energy LLC | Mt. Hope, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Dec 2016 | Apr 2025 | Solar |
Downsville DPC Solar | SoCore Energy LLC | Menomonee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Jan 2017 | Apr 2025 | Solar |
Liberty Pole DPC Solar | SoCore Energy LLC | Viroqua, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Apr 2017 | Apr 2025 | Solar |
Warren DPC Solar | SoCore Energy LLC | Roberts, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Apr 2017 | Apr 2025 | Solar |
Conrath DPC Solar | SoCore Energy LLC | Conrath, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | May 2017 | Dec 2024 | Solar |
Lafayette DPC Solar | SoCore Energy LLC | Chippewa Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | May 2017 | Dec 2024 | Solar |
Sauk DPC Solar | SoCore Energy LLC | Wonewoc, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Dec 2016 | Dec 2024 | Solar |
HQC Rock River Solar Power Gen Station | HQC Rock River Solar Power Generation Station LLC | Beloit, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 GWh | Jun 2016 | Dec 2024 | Solar |
Browse Power Plants By Wisconsin Counties
Figures are based on April 2025 generation numbers.County | State Rank | Active Plants | Apr 2025 Generation |
---|---|---|---|
Portage County, WI | # 32 | 6 | 109.3 GWh |
Adams County, WI | # 33 | 2 | 108.7 GWh |
Richland County, WI | # 34 | 4 | 104.6 GWh |
La Crosse County, WI | # 35 | 2 | 66.6 GWh |
Dunn County, WI | # 36 | 5 | 65.8 GWh |
Florence County, WI | # 37 | 3 | 56.6 GWh |
Eau Claire County, WI | # 38 | 2 | 42.4 GWh |
Oneida County, WI | # 39 | 3 | 24.7 GWh |
Oconto County, WI | # 40 | 3 | 19.0 GWh |
Barron County, WI | # 41 | 5 | 17.0 GWh |
St. Croix County, WI | # 42 | 3 | 16.8 GWh |
Monroe County, WI | # 43 | 3 | 14.0 GWh |
Green Lake County, WI | # 44 | 1 | 13.6 GWh |
Kewaunee County, WI | # 45 | 3 | 13.4 GWh |
Sawyer County, WI | # 46 | 4 | 13.2 GWh |
Price County, WI | # 47 | 6 | 12.4 GWh |
Jackson County, WI | # 48 | 4 | 12.1 GWh |
Washburn County, WI | # 49 | 3 | 10.0 GWh |
Trempealeau County, WI | # 50 | 2 | 8.6 GWh |
Iron County, WI | # 51 | 1 | 8.0 GWh |
Burnett County, WI | # 52 | 4 | 7.7 GWh |
Waukesha County, WI | # 53 | 2 | 7.0 GWh |
Vernon County, WI | # 54 | 5 | 6.1 GWh |
Walworth County, WI | # 55 | 3 | 4.0 GWh |
Clark County, WI | # 56 | 1 | 3.7 GWh |
Pierce County, WI | # 57 | 2 | 3.0 GWh |
Taylor County, WI | # 58 | 1 | 2.7 GWh |
Shawano County, WI | # 59 | 1 | 1.4 GWh |
Langlade County, WI | # 60 | 1 | 279.0 MWh |
Door County, WI | # 61 | 1 | 9.0 MWh |