Directory of Power Plants in Wisconsin
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Bear Creek (WI) | Wisconsin Power & Light Co | Lone Rock, WI | Midcontinent Independent System Operator, Inc. (MISO) | 100.4 GWh | Aug 2022 | May 2026 | Solar |
| Bridge Creek | OneEnergy, Inc. | Augusta, WI | Midcontinent Independent System Operator, Inc. (MISO) | 258.0 MWh | Oct 2025 | Dec 2025 | Solar |
| Bright Future | OneEnergy, Inc. | Hammond, WI | Midcontinent Independent System Operator, Inc. (MISO) | 361.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Elk Mound (PV) | OneEnergy, Inc. | Elk Mound, WI | Midcontinent Independent System Operator, Inc. (MISO) | 653.0 MWh | Aug 2025 | Dec 2025 | Solar |
| Greenfield | OneEnergy, Inc. | Coon Valley, WI | Midcontinent Independent System Operator, Inc. (MISO) | 200.0 MWh | Oct 2025 | Dec 2025 | Solar |
| Hannibal | OneEnergy, Inc. | Gillman, WI | Midcontinent Independent System Operator, Inc. (MISO) | 378.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Luck | OneEnergy, Inc. | Luck, WI | Midcontinent Independent System Operator, Inc. (MISO) | 85.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Next Generation | OneEnergy, Inc. | Woodville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 331.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Viola | OneEnergy, Inc. | Webster, WI | Midcontinent Independent System Operator, Inc. (MISO) | 65.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Adams Road Solar | Wisconsin Electric Power Co | Franksville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Nortera Customer Hosted Solar | Wisconsin Power & Light Co | Fairwater, WI | Midcontinent Independent System Operator, Inc. (MISO) | 307.0 MWh | Jul 2025 | Dec 2025 | Solar |
| Wood County | Wisconsin Power & Light Co | Nekoosa, WI | Midcontinent Independent System Operator, Inc. (MISO) | 272.9 GWh | Nov 2022 | May 2026 | Solar |
| North Rock | Wisconsin Power & Light Co | Edgerton, WI | Midcontinent Independent System Operator, Inc. (MISO) | 92.6 GWh | Sep 2022 | May 2026 | Solar |
| La Grange Solar Partners, LLC | Wisconsin Electric Power Co | Elkhorn, WI | Midcontinent Independent System Operator, Inc. (MISO) | 405.0 MWh | Oct 2025 | Dec 2025 | Solar |
| Onion River | Wisconsin Power & Light Co | Sheboygan Cedar Grove, WI | Midcontinent Independent System Operator, Inc. (MISO) | 259.6 GWh | Nov 2023 | May 2026 | Solar |
| Grant County | Wisconsin Power & Light Co | Town of Potosi, WI | Midcontinent Independent System Operator, Inc. (MISO) | 375.2 GWh | Apr 2024 | May 2026 | Solar |
| Beaver Dam Solar | Wisconsin Power & Light Co | Dodge, WI | Midcontinent Independent System Operator, Inc. (MISO) | 101.4 GWh | Nov 2023 | May 2026 | Solar |
| Wautoma Solar | Wisconsin Power & Light Co | Wautoma, WI | Midcontinent Independent System Operator, Inc. (MISO) | 189.7 GWh | Nov 2023 | May 2026 | Solar |
| Paddock Solar | Wisconsin Power & Light Co | Beloit, WI | Midcontinent Independent System Operator, Inc. (MISO) | 134.6 GWh | Oct 2023 | May 2026 | Solar |
| Albany Solar (WI) | Wisconsin Power & Light Co | Broadhead, WI | Midcontinent Independent System Operator, Inc. (MISO) | 99.3 GWh | Nov 2023 | May 2026 | Solar |
| Springfield Solar (WI) | Wisconsin Power & Light Co | Lomira, WI | Midcontinent Independent System Operator, Inc. (MISO) | 206.2 GWh | Nov 2023 | May 2026 | Solar |
| Cassville Solar | Wisconsin Power & Light Co | Cassville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 98.7 GWh | Nov 2023 | May 2026 | Solar |
| Spooner Solar Array | Onsite Partners, LLC | Spooner, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | May 2019 | Dec 2024 | Solar |
| Barron Solar Array | Onsite Partners, LLC | Barron, WI | Midcontinent Independent System Operator, Inc. (MISO) | 5.8 GWh | Jul 2021 | Dec 2025 | Solar |
| Strobus | Altus Power America Management, LLC | Merrillan, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | Aug 2021 | Dec 2025 | Solar |
| Jackson Solar WI, LLC | Wisconsin Electric Power Co | Cedarburg, WI | Midcontinent Independent System Operator, Inc. (MISO) | 11.8 GWh | Nov 2023 | Dec 2025 | Solar |
| Webster Creek (Oak 2) | Greenbacker Renewable Energy Corporation | New Lisbon, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Nov 2023 | Dec 2025 | Solar |
| Dane County Solar LLC | Dane County Solar LLC | Cottage Grove, WI | Midcontinent Independent System Operator, Inc. (MISO) | 33.7 GWh | May 2023 | Dec 2025 | Solar |
| UW Kegonsa Customer Hosted Solar | Wisconsin Power & Light Co | Stoughton, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Apr 2025 | Dec 2025 | Solar |
| Adams PV Plant | Adams PV Plant (WI) | Adams, WI | Midcontinent Independent System Operator, Inc. (MISO) | 15.4 GWh | Jun 2023 | Dec 2025 | Solar |
| Portage Solar Plant | Portage Solar Plant | Portage, WI | Midcontinent Independent System Operator, Inc. (MISO) | 21.2 GWh | May 2023 | Dec 2025 | Solar |
| Rock County Customer Hosted Solar | Wisconsin Power & Light Co | Janesville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Mar 2025 | Dec 2025 | Solar |
| Janesville Community Solar | Wisconsin Power & Light Co | Janesville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.6 GWh | Mar 2025 | Dec 2025 | Solar |
| Antigo-Forrest Street Solar Project | Wisconsin Public Service Corp | Antigo, WI | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 GWh | Oct 2024 | Dec 2025 | Solar |
| Auburn Solar WI, LLC | Wisconsin Electric Power Co | Campbellsport, WI | Midcontinent Independent System Operator, Inc. (MISO) | 8.9 GWh | Nov 2024 | Dec 2025 | Solar |
| Bonduel Solar WI, LLC | Wisconsin Electric Power Co | Bonduel, WI | Midcontinent Independent System Operator, Inc. (MISO) | 12.0 GWh | Nov 2023 | Dec 2025 | Solar |
| Caledonia Solar WI, LLC | Wisconsin Electric Power Co | Caledonia, WI | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 GWh | Mar 2025 | Dec 2025 | Solar |
| Hackbarth Solar WI, LLC | Wisconsin Electric Power Co | Fort Atkinson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 8.9 GWh | Nov 2024 | Dec 2025 | Solar |
| Hermsdorf Solar | Madison Gas & Electric Co | Madison, WI | Midcontinent Independent System Operator, Inc. (MISO) | 16.4 GWh | Feb 2022 | Dec 2025 | Solar |
| LaFayette Solar WI, LLC | Wisconsin Electric Power Co | Elkhorn, WI | Midcontinent Independent System Operator, Inc. (MISO) | 10.2 GWh | Nov 2024 | Dec 2025 | Solar |
| Raymond Solar WI, LLC | Wisconsin Electric Power Co | Franksville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 8.3 GWh | Jan 2025 | Dec 2025 | Solar |
| Silver Lake Solar WI, LLC | Wisconsin Electric Power Co | Salem, WI | Midcontinent Independent System Operator, Inc. (MISO) | 8.9 GWh | Nov 2023 | Dec 2025 | Solar |
| Spring Prairie Solar WI, LLC | Wisconsin Electric Power Co | Burlington, WI | Midcontinent Independent System Operator, Inc. (MISO) | 12.8 GWh | Nov 2023 | Dec 2025 | Solar |
| Fond du Lac Community Solar | SoCore Energy LLC | Fond Du Lac, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2021 | Dec 2025 | Solar |
| Strix Solar | Madison Gas & Electric Co | Fitchburg, WI | Midcontinent Independent System Operator, Inc. (MISO) | 9.3 GWh | Dec 2024 | Dec 2025 | Solar |
| Lake Hallie | Standard Solar | Chippewa Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Apple River Solar, LLC | Geronimo Power | Amery, WI | Midcontinent Independent System Operator, Inc. (MISO) | 82.3 GWh | Nov 2025 | May 2026 | Solar |
| Spring Brook Solar WI, LLC | Wisconsin Electric Power Co | Whitewater, WI | Midcontinent Independent System Operator, Inc. (MISO) | 630.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Rock LakeSolar WI, LLC | Wisconsin Electric Power Co | Waterloo, WI | Midcontinent Independent System Operator, Inc. (MISO) | 318.0 MWh | Oct 2025 | Dec 2025 | Solar |
| Antigo Solar Partners, LLC | Wisconsin Electric Power Co | Antigo, WI | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 GWh | Oct 2025 | Dec 2025 | Solar |
| Waxdale | S.C. Johnson & Son, Inc. | Sturtevant, WI | Midcontinent Independent System Operator, Inc. (MISO) | 37.2 GWh | Nov 2003 | May 2026 | Natural Gas : 43.5% Landfill Gas : 30.9% Wind : 17.2% Solar : 8.4% |
| Whistling Winds DPC Solar | SoCore Energy LLC | New Lisbon, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | May 2017 | May 2026 | Solar |
| Medford DPC Solar | SoCore Energy LLC | Medford, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Jan 2017 | May 2026 | Solar |
| Mt. Hope DPC Solar | SoCore Energy LLC | Mt. Hope, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Dec 2016 | May 2026 | Solar |
| Downsville DPC Solar | SoCore Energy LLC | Menomonee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Jan 2017 | May 2026 | Solar |
| Liberty Pole DPC Solar | SoCore Energy LLC | Viroqua, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Apr 2017 | May 2026 | Solar |
| Warren DPC Solar | SoCore Energy LLC | Roberts, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.8 GWh | Apr 2017 | May 2026 | Solar |
| Conrath DPC Solar | SoCore Energy LLC | Conrath, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | May 2017 | Dec 2025 | Solar |
| Lafayette DPC Solar | SoCore Energy LLC | Chippewa Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | May 2017 | Dec 2025 | Solar |
| Sauk DPC Solar | SoCore Energy LLC | Wonewoc, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Dec 2016 | Dec 2025 | Solar |
| HQC Rock River Solar Power Gen Station | HQC Rock River Solar Power Generation Station LLC | Beloit, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.0 GWh | Jun 2016 | Dec 2024 | Solar |
| Twin Falls (WI) | Wisconsin Electric Power Co | Florence, WI | Midcontinent Independent System Operator, Inc. (MISO) | 37.0 GWh | Jun 2016 | Dec 2025 | Water |
| Jefferson Solar Park | Concord New Energy | Jefferson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 577.0 MWh | Nov 2013 | Dec 2025 | Solar |
| New Auburn DPC Solar | SoCore Energy LLC | New Auburn, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.5 GWh | Dec 2017 | May 2026 | Solar |
| Richland Center Renewable Energy LLC | Richland Center Renewable Energy LLC | Richland Center, WI | Midcontinent Independent System Operator, Inc. (MISO) | 7.2 GWh | Feb 2013 | Dec 2025 | Other Biomass Gas |
| Viresco Turtle Lake | Viresco Turtle Lake | Turtle Lake, WI | Midcontinent Independent System Operator, Inc. (MISO) | 8.5 GWh | Aug 2013 | Dec 2025 | Other Biomass Gas |
| Rothschild Biomass Cogen Facility | Wisconsin Electric Power Co | Rothschild, WI | Midcontinent Independent System Operator, Inc. (MISO) | 165.6 GWh | Oct 2013 | Dec 2025 | Wood/Wood Waste Solids : 94.7% Natural Gas : 5.3% |
| Cashton Greens Wind Farm | Cashton Greens Wind Farm LLC | Cashton, WI | Midcontinent Independent System Operator, Inc. (MISO) | 9.8 GWh | Apr 2012 | Dec 2025 | Wind |
| Onalaska Campus Landfill Biogas | Gundersen Lutheran Biogas I LLC | Onalaska, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Feb 2012 | Dec 2025 | Landfill Gas |
| Shirley Wind | Duke Energy Renewables Services | Denmark, WI | Midcontinent Independent System Operator, Inc. (MISO) | 57.0 GWh | Oct 2010 | Dec 2025 | Wind |
| Glacier Hills | Wisconsin Electric Power Co | Cambria, WI | Midcontinent Independent System Operator, Inc. (MISO) | 336.4 GWh | Nov 2011 | May 2026 | Wind |
| Little Quinnesec Falls Hydro Project | Eagle Creek Renewable Energy, LLC | Niagara, WI | Midcontinent Independent System Operator, Inc. (MISO) | 60.8 GWh | Nov 1900 | Dec 2025 | Water |
| Quilt Block Wind Farm LLC | Quilt Block Wind Farm LLC | Darlington, WI | Midcontinent Independent System Operator, Inc. (MISO) | 371.4 GWh | Aug 2017 | May 2026 | Wind |
| Forward Wind Energy Center | Wisconsin Public Service Corp | Brownsville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 124.9 GWh | Jun 2008 | May 2026 | Wind |
| Butler Ridge | Butler Ridge Wind Energy Center | Mayville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 137.9 GWh | Jan 2009 | May 2026 | Wind |
| Cumberland Solar | Green Street Power Partners | Cumberland, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Aug 2019 | Dec 2025 | Solar |
| Rice Lake Solar Array | Onsite Partners, LLC | Rice Lake, WI | Midcontinent Independent System Operator, Inc. (MISO) | 7.0 GWh | May 2019 | Dec 2025 | Solar |
| Blue Prairie Solar, LLC | Altus Power America Management, LLC | Black River Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.3 GWh | Jul 2021 | Dec 2025 | Solar |
| O'Brien Solar Fields | Madison Gas & Electric Co | Fitchburg, WI | Midcontinent Independent System Operator, Inc. (MISO) | 37.4 GWh | Apr 2021 | Dec 2025 | Solar |
| Darien Solar | Wisconsin Electric Power Co | Darien, WI | Midcontinent Independent System Operator, Inc. (MISO) | 366.3 GWh | Feb 2025 | May 2026 | Solar |
| Point Beach Solar | Point Beach Solar | Two Creeks, WI | Midcontinent Independent System Operator, Inc. (MISO) | 197.8 GWh | Aug 2021 | May 2026 | Solar |
| Badger Hollow II | Wisconsin Electric Power Co | Cobb, WI | Midcontinent Independent System Operator, Inc. (MISO) | 212.9 GWh | Nov 2023 | May 2026 | Solar |
| Dane County Airport Solar | Madison Gas & Electric Co | Madison, WI | Midcontinent Independent System Operator, Inc. (MISO) | 17.4 GWh | Nov 2020 | Dec 2025 | Solar |
| West Riverside Energy Center | Wisconsin Power & Light Co | Beloit, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 TWh | Apr 2020 | May 2026 | Natural Gas : 99.9% |
| Two Creeks Solar | Wisconsin Public Service Corp | Two Rivers, WI | Midcontinent Independent System Operator, Inc. (MISO) | 185.0 GWh | Oct 2020 | May 2026 | Solar |
| Badger Hollow I | Wisconsin Public Service Corp | Montfort, WI | Midcontinent Independent System Operator, Inc. (MISO) | 200.7 GWh | Oct 2021 | May 2026 | Solar |
| Elroy Solar | Green Street Power Partners | Mauston, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 GWh | Aug 2019 | Dec 2025 | Solar |
| Cashton Solar | Green Street Power Partners | Cashton, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | Aug 2019 | Dec 2025 | Solar |
| Crawfish River | Wisconsin Power & Light Co | Jefferson, WI | Midcontinent Independent System Operator, Inc. (MISO) | 129.7 GWh | Nov 2023 | May 2026 | Solar |
| New Lisbon Solar | Green Street Power Partners | New Lisbon, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.2 GWh | Aug 2019 | Dec 2025 | Solar |
| Fennimore Solar | Green Street Power Partners | Fennimore, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Aug 2019 | Dec 2025 | Solar |
| Arcadia Solar | Green Street Power Partners | Arcadia, WI | Midcontinent Independent System Operator, Inc. (MISO) | 7.2 GWh | Aug 2019 | Dec 2025 | Solar |
| Middleton Airport Solar | Madison Gas & Electric Co | Middleton, WI | Midcontinent Independent System Operator, Inc. (MISO) | 7.4 GWh | Jun 2020 | Dec 2025 | Solar |
| Epic Verona | Epic Hosting, LLC | Verona, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | May 2009 | Dec 2025 | Solar : 90.8% Distillate Fuel Oil : 9.2% |
| Galactic Wind | Galactic Wind | Waunakee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 21.2 GWh | Nov 2012 | Dec 2025 | Wind |
| Beloit Memorial Hospital Power Plant | Beloit Memorial Hospital | Beloit, WI | Midcontinent Independent System Operator, Inc. (MISO) | 147.0 MWh | May 2000 | Dec 2025 | Natural Gas : 99.1% Distillate Fuel Oil : 0.9% |
| IKEA Oak Creek Rooftop PV System | IKEA Property Inc | Oak Creek, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | May 2018 | Dec 2025 | Solar |
| Fiber Recovery, Inc. | Fiber Recovery, Inc | Ringle, WI | Midcontinent Independent System Operator, Inc. (MISO) | 6.5 GWh | Dec 2007 | Dec 2024 | Landfill Gas |
| Flambeau Solar Partners | REC Solar | Phillips, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.4 GWh | Apr 2017 | Dec 2024 | Solar |
| Sand Lake DPC Solar | SoCore Energy LLC | Centuria, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Oct 2017 | Dec 2025 | Solar |
Browse Power Plants By Wisconsin Counties
Figures are based on May 2026 generation numbers.| County | State Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Richland County, WI | # 32 | 4 | 107.5 GWh |
| Adams County, WI | # 33 | 2 | 98.8 GWh |
| Portage County, WI | # 34 | 7 | 92.9 GWh |
| La Crosse County, WI | # 35 | 3 | 69.1 GWh |
| Dunn County, WI | # 36 | 5 | 60.8 GWh |
| Florence County, WI | # 37 | 3 | 60.5 GWh |
| Eau Claire County, WI | # 38 | 3 | 37.1 GWh |
| Oneida County, WI | # 39 | 3 | 27.1 GWh |
| Walworth County, WI | # 40 | 5 | 24.1 GWh |
| Oconto County, WI | # 41 | 3 | 23.3 GWh |
| Langlade County, WI | # 42 | 2 | 17.9 GWh |
| St. Croix County, WI | # 43 | 5 | 17.8 GWh |
| Barron County, WI | # 44 | 7 | 17.0 GWh |
| Price County, WI | # 45 | 6 | 14.0 GWh |
| Jackson County, WI | # 46 | 4 | 12.8 GWh |
| Monroe County, WI | # 47 | 3 | 12.8 GWh |
| Sawyer County, WI | # 48 | 4 | 12.7 GWh |
| Kewaunee County, WI | # 49 | 3 | 12.0 GWh |
| Shawano County, WI | # 50 | 1 | 12.0 GWh |
| Green Lake County, WI | # 51 | 1 | 11.6 GWh |
| Iron County, WI | # 52 | 1 | 9.1 GWh |
| Washburn County, WI | # 53 | 4 | 8.8 GWh |
| Trempealeau County, WI | # 54 | 2 | 7.4 GWh |
| Burnett County, WI | # 55 | 6 | 7.2 GWh |
| Waukesha County, WI | # 56 | 2 | 6.3 GWh |
| Vernon County, WI | # 57 | 5 | 6.3 GWh |
| Clark County, WI | # 58 | 2 | 3.7 GWh |
| Pierce County, WI | # 59 | 2 | 3.4 GWh |
| Taylor County, WI | # 60 | 2 | 3.2 GWh |
| Door County, WI | # 61 | 1 | 5.0 MWh |