Next Generation
2425 County Rd N, Woodville, WI 54028Plant Summary Information
Next Generation is ranked #104 out of 112 solar farms in Wisconsin in terms of total annual net electricity generation.
Next Generation generated 331.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Next Generation |
|---|---|
| Utility Name | OneEnergy, Inc. |
| Location | St. Croix County, WI |
| Initial Operation Date | October 2025 |
| Last Update | Dec 2025 |
| Annual Generation | 331.0 MWh |
| Annual Consumption | 1.1 k MMBtu |
| Ranked #12,387 out of 13,081 Power Plants Nationwide | |
| Ranked #6,891 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #238 out of 260 Wisconsin Power Plants | |
| Ranked #104 out of 112 Wisconsin Solar Power Plants | |
| Fuel Types | Solar |
Map of Next Generation
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Next Generation.
Monthly Net Generation for Next Generation
Monthly Plant Fuel Consumption for Next Generation
Next Generation Details
| Summary Information | |
|---|---|
| Plant Name | Next Generation (69494) |
| Plant Address | 2425 County Rd N, Woodville, WI 54028 |
| Utility | OneEnergy, Inc. (66783) |
| Latitude, Longitude | 44.91035, -92.31375 |
| Generation Dates on File | Oct 2025 to Dec 2025 |
| Initial Operation Date | October 2025 |
| Annual Generation | 331.0 MWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 25-738-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | St Croix Electric Coop (17868) WI |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator NXGEN Details Operating October 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 2.5 MW |
| Summer Capacity | 2.5 MW |
| Winter Capacity | 2.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | October 2025 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 180 |
| DC Net Capacity | 3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Next Generation Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6881 | Mountain View Ind Park 1-sline001 | Fontana, CA | 371.0 MWh |
| #6882 | SV CSG Prophetstown 1 | Prophetstown, IL | 370.0 MWh |
| #6883 | AES Bend Solar I, LLC CSG | Rockford, IL | 369.0 MWh |
| #6884 | Bright Future | Hammond, WI | 361.0 MWh |
| #6885 | Vermilion Solar II LLC CSG | Pontiac, IL | 357.0 MWh |
| #6886 | Walnut Unified School District Walnut HS | Walnut, CA | 327.0 MWh |
| #6887 | Bowie State Solar | Bowie, MD | 342.0 MWh |
| #6888 | Pilot Rock Solar 2 | Pilot Rock, OR | 340.0 MWh |
| #6889 | SL JAMESTOWN ARRAY 1 | Jamestown, NY | 337.0 MWh |
| #6890 | Magruder Solar Community Solar | Shawangunk, NY | 335.0 MWh |
| #6892 | IKEA St. Louis 410 | St. Louis, MO | 328.0 MWh |
| #6893 | Westside Avenue | North Bergen, NJ | 327.0 MWh |
| #6894 | NSF Marshall Site 2 | Marshall, NY | 320.0 MWh |
| #6895 | DD Hay Road Solar 23 LLC | New Castle, DE | 320.0 MWh |
| #6896 | Rock LakeSolar WI, LLC | Waterloo, WI | 318.0 MWh |
| #6897 | Macon County IL S1 | Decatur, IL | 316.0 MWh |
| #6898 | Los Angeles Harbor College | Wilmington, CA | 313.0 MWh |
| #6899 | Richmond Solar | Richmond, IL | 313.0 MWh |
| #6900 | Allied Potato | Bakersfield, CA | 309.9 MWh |
| #6901 | Nortera Customer Hosted Solar | Fairwater, WI | 307.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Next Generation.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Allen S King | Oak Park Heights, MN | 723.0 GWh | 24.2 mi |
| Apple River | Somerset, WI | 13.2 GWh | 26 mi |
| Bright Future | Hammond, WI | 361.0 MWh | 7.3 mi |
| Cedar Falls (WI) | Menomonie, WI | 30.9 GWh | 20.9 mi |
| CGSun, LLC Community Solar | Cottage Grove, MN | 6.3 GWh | 27.8 mi |
| Cottage Grove CSG, LLC | Cottage Grove, MN | 7.3 GWh | 27.8 mi |
| Downsville DPC Solar | Menomonee, WI | 1.7 GWh | 22.1 mi |
| Hastings Solar | Hastings, MN | 8.3 GWh | 27.1 mi |
| Hay River (Dunn 1) | Boyceville, WI | 2.7 GWh | 19 mi |
| Huneke I CSG | Zumbrota, MN | 1.8 GWh | 21.6 mi |
| Menomonie | Menomonie, WI | 22.7 GWh | 18.9 mi |
| Novel MNDot Solar CSG | Afton, MN | 1.7 GWh | 24.4 mi |
| Prairie Island | Welch, MN | 8.8 TWh | 25.4 mi |
| Red Wing | Red Wing, MN | 131.9 GWh | 25.6 mi |
| Red Wing Community Solar | Red Wing, MN | 7.4 GWh | 27.8 mi |
| SV CSG AFTON I | Afton, MN | 1.6 GWh | 26.7 mi |
| Tinta Wita 5 MW Solar PV System | Welch, MN | 7.3 GWh | 25.1 mi |
| Trimbelle (Pierce Pepin) | Hager City, WI | 3.4 GWh | 23.5 mi |
| Walleye (Dunn 2) | Colefax, WI | 2.8 GWh | 25.3 mi |
| Warren DPC Solar | Roberts, WI | 3.8 GWh | 10.6 mi |