Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| City of Havre De Grace C | Luminace Solar MC, LLC | Perryman, MD | PJM Interconnection, LLC (PJM) | 3.3 GWh | Nov 2015 | Dec 2024 | Solar |
| City of Hayward WWTP | City of Hayward | Hayward, CA | California Independent System Operator (CISO) | 11.3 GWh | Oct 2010 | Dec 2024 | Other Biomass Gas : 60.4% Solar : 27.7% Natural Gas : 12.0% |
| City of Lexington | Madison Energy Holdings LLC | Lexington, NE | Southwest Power Pool (SWPP) | 6.5 GWh | Apr 2017 | Dec 2024 | Solar |
| City of Long Beach Airport Lot A & B | Solar DG CA Long Beach, LLC | Long Beach, CA | Los Angeles Department of Water and Power (LDWP) | 2.8 GWh | Jan 2024 | Dec 2024 | Solar |
| City of Madera WWTP | SunE GIL1, LLC | Madera, CA | California Independent System Operator (CISO) | 1.4 GWh | Aug 2009 | Dec 2024 | Solar |
| City of Milwaukee Landfill | Wisconsin Electric Power Co | Milwaukee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Jan 2021 | Dec 2024 | Solar |
| City of Palo Alto | City of Palo Alto | Palo Alta, CA | California Independent System Operator (CISO) | 20.6 MWh | Feb 2002 | Dec 2023 | Natural Gas |
| City of Paris Solar | Today's Power, Inc. | Paris, AR | Southwest Power Pool (SWPP) | 2.6 GWh | May 2020 | Dec 2024 | Solar |
| City of Peru Plank Road Generating Station | City of Peru - (IL) | Peru, IL | Midcontinent Independent System Operator, Inc. (MISO) | 17.0 GWh | Sep 1968 | Sep 2025 | Water : 98.6% Distillate Fuel Oil : 1.1% |
| City of Pratt Solar | Kenyon Energy KS Solar 1 LLC | Pratt, KS | Southwest Power Pool (SWPP) | 10.5 GWh | Feb 2019 | Dec 2024 | Solar |
| City of Rio Rancho WWTP | Exus New Mexico | Rio Rancho, NM | Public Service Company of New Mexico (PNM) | 2.7 GWh | Aug 2019 | Dec 2024 | Solar |
| City of Rochester Solar | AES Distributed Energy | Rochester, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Nov 2017 | Dec 2024 | Solar |
| City of Rosamond (CA) | Standard Solar | Rosamond, CA | California Independent System Operator (CISO) | 2.7 GWh | Apr 2023 | Dec 2024 | Solar |
| City of Soledad Water Reclamation | Foundation HA Energy Generation, LLC | Soledad, CA | California Independent System Operator (CISO) | 4.0 GWh | Oct 2014 | Dec 2024 | Wind |
| City of Tulare Water Facility | City of Tulare Water Pollution Control | Tulare, CA | California Independent System Operator (CISO) | 20.7 GWh | Dec 1990 | Dec 2024 | Natural Gas : 62.5% Other Biomass Gas : 21.5% Solar : 16.0% |
| City of West Plains Power Station | City of West Plains - (MO) | West Plains, MO | Southwest Power Pool (SWPP) | 4.0 GWh | Apr 2000 | Dec 2024 | Natural Gas : 59.7% Distillate Fuel Oil : 40.3% |
| City Power Plant | City of Idaho Falls - (ID) | Idaho Falls, ID | PacifiCorp East (PACE) | 40.4 GWh | Jun 1982 | Dec 2024 | Water |
| City West Diesel Plant | Lockhart Power Co | Union, SC | Duke Energy Carolinas (DUK) | 34.0 MWh | May 2011 | Dec 2024 | Distillate Fuel Oil |
| CityCenter Central Plant Cogen Units | CityCenter Land LLC | Las Vegas, NV | Nevada Power Company (NEVP) | 60.2 GWh | Nov 2009 | Sep 2025 | Natural Gas |
| Civic Center East | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2020 | Dec 2024 | Solar |
| CJ Solar I, LLC | Lisbon West | Lisbon, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Jul 2018 | Dec 2024 | Solar |
| CL-Viaduct LLC | BCD Project Holdings 1, LLC | Bloom Township, PA | PJM Interconnection, LLC (PJM) | 31.8 GWh | Feb 2023 | Dec 2024 | Solar |
| Claire Solar Farm | Claire Solar Partners LLC | South Burlington, VT | ISO New England (ISNE) | 3.6 GWh | Jun 2014 | Dec 2024 | Solar |
| Clairton Works | United States Steel- Clairton | Clairton, PA | PJM Interconnection, LLC (PJM) | 120.9 GWh | Dec 1954 | Dec 2024 | Other Gas : 92.1% Natural Gas : 7.9% |
| Clam River Dam | Renewable World Energies LLC | Danbury, WI | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Mar 1942 | Dec 2024 | Water |
| Clara | Power Depot Group A, LLC | Houston, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 209.0 MWh | Jun 2013 | Dec 2024 | Distillate Fuel Oil |
| Clara City Solar | Clara City Solar LLC | Clara City, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Aug 2019 | Dec 2024 | Solar |
| Clarence Cannon | USCE-St Louis District | Monroe City, MO | Associated Electric Cooperative, Inc. (AECI) | 94.1 GWh | Oct 1984 | Sep 2025 | Water |
| Clarendon Solar Farm | Clarendon Solar Farm, LLC | North Clarendon, VT | ISO New England (ISNE) | 3.0 GWh | Jun 2014 | Dec 2024 | Solar |
| Clark Falls | Green Mountain Power Corp | Milton, VT | ISO New England (ISNE) | 17.0 GWh | Jan 1937 | Dec 2024 | Water |
| Clark (NVE) | Nevada Power Co | Las Vegas, NV | Nevada Power Company (NEVP) | 896.4 GWh | May 1973 | Sep 2025 | Natural Gas |
| Clark Road Solar 1, LLC | Clark Road Solar 1, LLC | Gardner, MA | ISO New England (ISNE) | 8.7 GWh | Nov 2020 | Dec 2024 | Solar |
| Clark University | Clark University | Worcester, MA | ISO New England (ISNE) | 4.4 GWh | Dec 2012 | Dec 2024 | Natural Gas |
| Clarkson Solar | AES Distributed Energy | Potsdam, NY | New York Independent System Operator (NYIS) | 1.9 GWh | Oct 2014 | Dec 2024 | Solar |
| Clarkstown Landfill Solar Facility | Clarkstown Solar LLC | West Nyack, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Nov 2014 | Dec 2024 | Solar |
| Claude Vandyke | Wolverine Power Supply Coop | Dorr, MI | Midcontinent Independent System Operator, Inc. (MISO) | 5.4 GWh | Dec 1966 | Dec 2024 | Natural Gas |
| Claverack Creek Solar | Claverack Creek Solar, LLC | Hudson, NY | New York Independent System Operator (NYIS) | 895.0 MWh | Sep 2024 | Dec 2024 | Solar |
| Clay Boswell | ALLETE, Inc. | Cohasset, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.6 TWh | Jun 1958 | Sep 2025 | Subbituminous Coal : 99.7% |
| Clay County Electrical Cooperative | Today's Power, Inc. | Corning, AR | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Apr 2020 | Dec 2024 | Solar |
| Clay FC | Clay FC, LLC | Louisville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Jun 2021 | Dec 2024 | Solar |
| Clay Solar CSG | DG New York CS, LLC | Clay, NY | New York Independent System Operator (NYIS) | 8.4 GWh | May 2021 | Dec 2024 | Solar |
| Claytor | Appalachian Power Co | Radford, VA | PJM Interconnection, LLC (PJM) | 220.4 GWh | Jul 1939 | Dec 2024 | Water |
| Clayville | City of Vineland - (NJ) | Vineland, NJ | PJM Interconnection, LLC (PJM) | 62.4 GWh | Oct 2015 | Dec 2024 | Natural Gas |
| Clean Energy Future-Lordstown, LLC | Clean Energy Future-Lordstown, LLC | Lordstown, OH | PJM Interconnection, LLC (PJM) | 6.5 TWh | Sep 2018 | Sep 2025 | Natural Gas |
| Clear Creek Wind | Clear Creek Wind, LLC | Maryville, MO | Associated Electric Cooperative, Inc. (AECI) | 437.6 GWh | Apr 2020 | Sep 2025 | Wind |
| Clear Garden CSG | Clear Garden LLC | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Aug 2019 | Dec 2024 | Solar |
| Clear Lake | Idaho Power Co | Buhl, ID | Idaho Power Company (IPCO) | 16.7 GWh | Nov 1937 | Dec 2024 | Water |
| Clear Solar I, LLC | Clear Solar I, LLC | Forest City, NC | Duke Energy Carolinas (DUK) | 6.0 GWh | Aug 2020 | Dec 2024 | Solar |
| Clear Spring Ranch PV Project | DG Colorado Solar, LLC | Fountain, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 19.0 GWh | Sep 2016 | Dec 2024 | Solar |
| Clearview Solar 1 | Clearview Solar I, LLC | Quincy, OH | PJM Interconnection, LLC (PJM) | 234.4 GWh | Nov 2024 | Sep 2025 | Solar |
| Clearwater 1 | PacifiCorp | Idleyld Park, OR | PacifiCorp West (PACW) | 32.2 GWh | May 1953 | Dec 2024 | Water |
| Clearwater 2 | PacifiCorp | Idleyld Park, OR | PacifiCorp West (PACW) | 34.7 GWh | Oct 1953 | Dec 2024 | Water |
| Clearwater Paper APP CB | Clearwater Paper Corporation | Arkansas City, AR | Midcontinent Independent System Operator, Inc. (MISO) | 126.2 GWh | Oct 1977 | Dec 2024 | Black Liquor : 61.7% Natural Gas : 38.1% |
| Clearwater Paper Corporation - Augusta | Clearwater Paper Corporation - Augusta | Augusta, GA | Southern Company Services, Inc. - Trans (SOCO) | 367.0 GWh | Jul 1960 | Dec 2024 | Black Liquor : 53.6% Natural Gas : 33.6% Wood/Wood Waste Solids : 12.8% |
| Clearwater Paper IPP Lewiston | Clearwater Paper Corporation | Lewiston, ID | Avista Corporation (AVA) | 451.0 GWh | Dec 1949 | Sep 2025 | Black Liquor : 60.1% Wood/Wood Waste Solids : 24.0% Natural Gas : 15.9% |
| Clearwater Power Plant | City of Riverside - (CA) | Corona, CA | California Independent System Operator (CISO) | 10.3 GWh | Feb 2005 | Dec 2024 | Natural Gas |
| Clearwater Wind East | Clearwater Wind East, LLC | Miles City, MT | NorthWestern Corporation (NWMT) | 827.6 GWh | Dec 2023 | Sep 2025 | Wind |
| Clearwater Wind I | Clearwater Energy Resources LLC | Miles City, MT | Puget Sound Energy, Inc. (PSEI) | 1.2 TWh | Oct 2022 | Sep 2025 | Wind |
| Clearwater Wind II | Clearwater Wind II, LLC | Miles City, MT | NorthWestern Corporation (NWMT) | 395.2 GWh | Nov 2023 | Sep 2025 | Wind |
| Clearwater Wind III | Clearwater Wind III, LLC | Miles City, MT | Avista Corporation (AVA) | 371.0 GWh | Aug 2024 | Sep 2025 | Wind |
| Cleary Flood Hybrid | City of Taunton | Taunton, MA | ISO New England (ISNE) | 132.5 GWh | May 1966 | Dec 2024 | Natural Gas : 99.8% |
| Clement Dam Hydro LLC | Eagle Creek Renewable Energy, LLC | Tilton, NH | ISO New England (ISNE) | 8.9 GWh | Nov 1984 | Dec 2024 | Water |
| Clemons Road Solar | RPNY Solar 4, LLC | Minoa, NY | ISO New England (ISNE) | 1.0 GWh | Jun 2024 | Dec 2024 | Solar |
| Clendenin A Community Solar, LLC CSG | Clendenin A Community Solar, LLC | Herrin, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Jun 2021 | Dec 2024 | Solar |
| Cleveland Cnty Generating Facility | Southern Power Co | Kings Mountain, NC | Duke Energy Carolinas (DUK) | 712.0 GWh | Nov 2012 | Dec 2024 | Natural Gas : 99.6% |
| Cleveland Peaking | American Mun Power-Ohio, Inc | Cleveland, OH | PJM Interconnection, LLC (PJM) | 472.0 MWh | Jun 2000 | Dec 2024 | Distillate Fuel Oil |
| Cleveland Thermal | Corix Cleveland Thermal Generating LP | Cleveland, OH | PJM Interconnection, LLC (PJM) | 2.2 GWh | Jan 2017 | Dec 2024 | Natural Gas |
| Cleveland Works | Cleveland Cliffs | Cleveland, OH | PJM Interconnection, LLC (PJM) | 359.3 GWh | Dec 1949 | Sep 2025 | Blast Furnace Gas : 53.3% Natural Gas : 46.7% |
| Clevelandcliffs Warren | Clevelandcliffs Warren | Warren, OH | PJM Interconnection, LLC (PJM) | 53.3 GWh | Sep 1934 | Sep 2024 | Other Gas : 62.9% Natural Gas : 37.1% |
| Clewiston Sugar House | United States Sugar Corp | Clewiston, FL | Duke Energy Florida, Inc. (FPC) | 260.2 GWh | Oct 1997 | Sep 2025 | Agricultural By-Products : 99.8% |
| Clif Bar Bakery of Twin Falls | Mondelez Global LLC (Twin Falls) | Twin Falls, ID | Idaho Power Company (IPCO) | 2.7 GWh | May 2019 | Dec 2024 | Solar |
| Clifton | Sunflower Electric Power Corp | Clifton, KS | Southwest Power Pool (SWPP) | 6.3 GWh | Jul 1974 | Nov 2024 | Natural Gas |
| Clifton Dam 3 Power Station | Converse Energy Inc | Converse, SC | Duke Energy Carolinas (DUK) | 3.7 GWh | Jul 1985 | Dec 2024 | Water |
| Clifton Park Solar 1, LLC | Nautilus Solar Solutions | Rexford, NY | New York Independent System Operator (NYIS) | 8.3 GWh | Nov 2020 | Dec 2024 | Solar |
| Clifton Park Solar 2, LLC | Nautilus Solar Solutions | Rexford, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Nov 2020 | Dec 2024 | Solar |
| Clifty Creek | Indiana-Kentucky Electric Corp | Madison, IN | PJM Interconnection, LLC (PJM) | 5.7 TWh | Jan 1955 | Sep 2025 | Bituminous Coal : 96.1% Subbituminous Coal : 3.7% |
| Clinch River | Appalachian Power Co | Cleveland, VA | PJM Interconnection, LLC (PJM) | 243.7 GWh | Aug 1958 | Sep 2025 | Natural Gas |
| Cline Solar Farm, LLC | Cline Solar, LLC | Hildebran, NC | Duke Energy Carolinas (DUK) | 7.7 GWh | Aug 2017 | Dec 2024 | Solar |
| Clines Corners Wind Farm LLC | Pattern Operators LP | Encino, NM | Public Service Company of New Mexico (PNM) | 1.1 TWh | Nov 2021 | Sep 2025 | Wind |
| Clinton | Valcour Operating Services, LLC | Churubusco, NY | New York Independent System Operator (NYIS) | 148.8 GWh | Apr 2008 | Dec 2024 | Wind |
| Clinton LFGTE | Wabash Valley Power Assn, Inc | Clinton, IL | Midcontinent Independent System Operator, Inc. (MISO) | 17.7 GWh | Jan 2006 | Sep 2025 | Landfill Gas |
| Clinton LFGTE Facility | Innovative Energy Systems Inc | Morrisonville, NY | New York Independent System Operator (NYIS) | 47.8 GWh | Sep 2008 | Dec 2024 | Landfill Gas |
| Clinton Power Station | Constellation Nuclear | Clinton, IL | Midcontinent Independent System Operator, Inc. (MISO) | 8.8 TWh | Oct 1987 | Sep 2025 | Nuclear |
| Clinton Solar | Ecos Energy LLC | Griswold, CT | ISO New England (ISNE) | 1.7 GWh | Apr 2021 | Dec 2024 | Solar |
| Clinton Solar 2b | Pivot Energy | Centralia, IL | Midcontinent Independent System Operator, Inc. (MISO) | 81.0 MWh | Oct 2024 | Dec 2024 | Solar |
| Clinton Solar 4 LLC CSG | Clinton Solar 4 LLC | Carlyle, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Sep 2020 | Dec 2024 | Solar |
| Clipperton Holdings LLC | Dominion Renewable Energy | Clinton, NC | Duke Energy Progress East (CPLE) | 9.3 GWh | Oct 2017 | Dec 2024 | Solar |
| Cloud County Wind Farm | Cloud County Windfarm, LLC | Concordia, KS | Southwest Power Pool (SWPP) | 334.8 GWh | Nov 2008 | Sep 2025 | Wind |
| Clovelly Solar | Clovelly Solar, LLC | Lillington, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Mar 2021 | Dec 2024 | Solar |
| Clover | Virginia Electric & Power Co | Clover, VA | PJM Interconnection, LLC (PJM) | 1.3 TWh | Sep 1995 | Sep 2025 | Bituminous Coal : 99.7% |
| Clover Creek Solar Community Solar | AES Distributed Energy | Mona, UT | PacifiCorp East (PACE) | 198.8 GWh | Nov 2021 | Sep 2025 | Solar |
| Cloverdale Solar Center | Adapture Renewables, Inc. | Cloverdale, CA | California Independent System Operator (CISO) | 2.1 GWh | Apr 2019 | Dec 2024 | Solar |
| Cloverdale Solar I | Altus Power America Management, LLC | Cloverdale, CA | California Independent System Operator (CISO) | 2.2 GWh | May 2014 | Dec 2024 | Solar |
| Clovis East High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2018 | Dec 2024 | Solar |
| Clovis High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 826.0 MWh | Mar 2018 | Dec 2024 | Solar |
| Clovis North High School | Tesla Inc. | Fresno, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2017 | Dec 2024 | Solar |
| Clyde Peaking Engine | AEP Onsite Partners, LLC | Clyde, OH | PJM Interconnection, LLC (PJM) | 641.0 MWh | Oct 2020 | Dec 2024 | Natural Gas |
| Clyde Solar Array | AEP Onsite Partners, LLC | Clyde, OH | PJM Interconnection, LLC (PJM) | 3.9 GWh | May 2016 | Sep 2025 | Solar |
| CM10 | Consolidated Edison Development Inc. | Boulder City, NV | California Independent System Operator (CISO) | 18.0 GWh | Nov 2008 | Dec 2024 | Solar |
| CM48 | Consolidated Edison Development Inc. | Boulder City, NV | California Independent System Operator (CISO) | 94.3 GWh | May 2010 | Dec 2024 | Solar |
Summary of Power Plants By State
Figures are based on September 2025 generation numbers.| State | Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Alabama | # 7 | 76 | 12,052.47 GWh |
| Alaska | # 48 | 147 | 527.57 GWh |
| Arizona | # 9 | 183 | 11,602.92 GWh |
| Arkansas | # 21 | 117 | 5,844.09 GWh |
| California | # 4 | 1,769 | 19,371.91 GWh |
| Colorado | # 30 | 304 | 4,433.17 GWh |
| Connecticut | # 32 | 168 | 3,779.74 GWh |
| Delaware | # 49 | 33 | 419.31 GWh |
| District of Columbia | # 51 | 16 | 16.99 GWh |
| Florida | # 2 | 323 | 24,446.09 GWh |
| Georgia | # 8 | 266 | 11,628.97 GWh |
| Hawaii | # 47 | 73 | 826.54 GWh |
| Idaho | # 44 | 148 | 1,495.33 GWh |
| Illinois | # 5 | 385 | 14,642.93 GWh |
| Indiana | # 14 | 213 | 8,730.35 GWh |
| Iowa | # 26 | 295 | 5,224.35 GWh |
| Kansas | # 25 | 189 | 5,250.86 GWh |
| Kentucky | # 23 | 60 | 5,806.86 GWh |
| Louisiana | # 13 | 87 | 9,343.34 GWh |
| Maine | # 45 | 217 | 1,135.36 GWh |
| Maryland | # 39 | 204 | 2,935.42 GWh |
| Massachusetts | # 41 | 652 | 1,746.92 GWh |
| Michigan | # 11 | 279 | 10,468.02 GWh |
| Minnesota | # 29 | 769 | 4,717.95 GWh |
| Mississippi | # 20 | 58 | 6,625.37 GWh |
| Missouri | # 22 | 128 | 5,843.17 GWh |
| State | Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Montana | # 40 | 72 | 1,949.24 GWh |
| Nebraska | # 34 | 132 | 3,501.38 GWh |
| Nevada | # 31 | 114 | 4,053.88 GWh |
| New Hampshire | # 42 | 60 | 1,549.07 GWh |
| New Jersey | # 27 | 399 | 4,969.45 GWh |
| New Mexico | # 36 | 145 | 3,317.84 GWh |
| New York | # 12 | 966 | 10,145.62 GWh |
| North Carolina | # 10 | 917 | 11,211.15 GWh |
| North Dakota | # 37 | 60 | 3,089.17 GWh |
| Ohio | # 6 | 201 | 12,818.31 GWh |
| Oklahoma | # 17 | 143 | 7,364.05 GWh |
| Oregon | # 28 | 282 | 4,812.51 GWh |
| Pennsylvania | # 3 | 260 | 19,731.43 GWh |
| Rhode Island | # 46 | 100 | 863.62 GWh |
| South Carolina | # 16 | 207 | 7,861.23 GWh |
| South Dakota | # 43 | 52 | 1,535.17 GWh |
| Tennessee | # 19 | 88 | 6,829.06 GWh |
| Texas | # 1 | 946 | 51,969.48 GWh |
| Utah | # 35 | 126 | 3,419.48 GWh |
| Vermont | # 50 | 120 | 165.14 GWh |
| Virginia | # 15 | 241 | 8,580.52 GWh |
| Washington | # 18 | 138 | 7,120.43 GWh |
| West Virginia | # 38 | 39 | 3,057.29 GWh |
| Wisconsin | # 24 | 251 | 5,674.74 GWh |
| Wyoming | # 33 | 73 | 3,641.70 GWh |