Clear Spring Ranch PV Project is ranked #28 out of 163 solar farms in Colorado in terms of total annual net electricity generation.

Clear Spring Ranch PV Project generated 3.3 GWh during the 3-month period between September 2024 to December 2024.

Plant NameClear Spring Ranch PV Project
Utility NameDG Colorado Solar, LLC
LocationEl Paso County, CO
Initial Operation DateOctober 2016
Last Update Dec 2024
Annual Generation 19.0 GWh
Annual Consumption 67.6 k MMBtu
Ranked #5,368 out of 12,613 Power Plants Nationwide
Ranked #1,482 out of 6,463 Solar Power Plants Nationwide
Ranked #102 out of 286 Colorado Power Plants
Ranked #28 out of 163 Colorado Solar Power Plants
Fuel Types Solar

Map of Clear Spring Ranch PV Project

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Clear Spring Ranch PV Project.

Create Your Account Today

Monthly Net Generation for Clear Spring Ranch PV Project

Monthly Plant Fuel Consumption for Clear Spring Ranch PV Project

Clear Spring Ranch PV Project Details

Summary Information
Plant NameClear Spring Ranch PV Project (60511)
Plant Address7383 Loren Lane, Fountain, CO 80817
UtilityDG Colorado Solar, LLC (60293)
Latitude, Longitude38.6021, -104.69469
Generation Dates on FileOct 2016 to Dec 2024
Initial Operation DateOctober 2016
Annual Generation 19.0 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityWestern Area Power Administration - Rocky Mountain Region (WACM)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerCity of Colorado Springs - (CO) (3989) CO
Grid Voltage 12.50 kV
Energy StorageNo

Generator PV1 Details Operating October 2016

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity10 MW
Summer Capacity10 MW
Winter Capacity10 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 2016
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Single Axis TrackingYes
Azimuth Angle180
DC Net Capacity13.9 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Clear Spring Ranch PV Project Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#1472Giffen Solar ParkCantua Creek, CA19.3 GWh
#1473Darlington Solar, LLCDarlington, SC19.3 GWh
#1474West Gates Solar StationHuron, CA19.2 GWh
#1475Albany SolarAlbany, MN19.2 GWh
#1476Rancho Seco Solar, LLCHerald, CA19.2 GWh
#1477CibolaSeboyeta, NM19.2 GWh
#1478KRS II Koloa SolarKoloa, HI19.2 GWh
#1479NorWest Energy 2, LLCBend, OR19.1 GWh
#1480Blue Wing Solar Energy GenerationSan Antonio, TX19.1 GWh
#1481Orion Solar IIArvin, CA19.0 GWh
#1483HWY 158 PVMurfreesboro, NC19.0 GWh
#1484Tumbleweed Solar, LLCRedmond, OR18.7 GWh
#1485Hertford Solar Power, LLCAhoskie, NC18.7 GWh
#1486Cherry Blossom Solar LLCHemingway, SC18.7 GWh
#1487Columbia Solar Energy, LLCPittsburg, CA18.7 GWh
#1488Rankin Solar Center, LLCFlorence, SC18.6 GWh
#1489Monroe Solar Farm, LLCMonroeTownship, NJ18.6 GWh
#1490Covington Solar FarmCovington, OK18.6 GWh
#1491Washington White Post Solar LLCBath, NC18.6 GWh
#1492Lightfoot Solar, LLCLuzerne, MI18.5 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Clear Spring Ranch PV Project.

Plant NamePlant LocationAnnual GenerationDistance
AFA Solar FarmColorado Springs, CO10.9 GWh25.3 mi
Bighorn Solar 1Pueblo, CO582.5 GWh27.8 mi
Carson Solar IColorado Springs, CO3.1 GWh9.6 mi
CEC Solar #1117, LLCPueblo, CO4.1 GWh23.8 mi
Comanche (CO)Pueblo, CO4.2 TWh28 mi
CSU PuebloPueblo, CO1.8 GWh21.4 mi
Fountain Valley Power FacilityFountain, CO237.7 GWh3.1 mi
Front Range Power PlantFountain, CO2.1 TWh1.9 mi
George BirdsallColorado Springs, CO42.5 GWh20.4 mi
James W. Broderick Hydropower PlantPueblo, CO20.8 GWh23 mi
Manitou SpringsManitou Spring, CO2.1 GWh21.7 mi
Neptune Energy Center HybridBoone, CO679.3 GWh24.1 mi
Palmer SolarFountain, CO140.2 GWh3 mi
Pike Solar HybridFountain, CO446.2 GWh6.3 mi
Pikes Peak Solar Garden 1 LLC CSGColorado Springs, CO5.0 GWh12.2 mi
Pueblo Airport Generating StationPueblo, CO1.6 TWh21.5 mi
Ray D NixonFountain, CO1.3 TWh2.2 mi
Ruxton ParkManitou Spring, CO1.1 GWh22.4 mi
South Plant (CO)Colorado Springs, CO73.2 GWh17.1 mi
TeslaColorado Springs, CO62.4 GWh28 mi