Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Wadham Energy LP | Wadham Energy Ltd Partners | Williams, CA | California Independent System Operator (CISO) | 132.0 GWh | Feb 1989 | Dec 2024 | Agricultural By-Products : 99.7% |
| Waco Solar | Waco Solar, LLC | Mt Calm, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 915.1 GWh | Feb 2024 | Feb 2026 | Solar |
| Wachusett Solar | Wachusett Solar, LLC | Rutland, MA | ISO New England (ISNE) | 3.6 GWh | Jul 2019 | Dec 2024 | Solar |
| Wabasha Solar | Wabasha Solar LLC | Wabasha, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Jul 2019 | Dec 2024 | Solar |
| Wabasha Holdco Solar CSG | Wabasha Holdco LLC | Wabasha, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Feb 2017 | Dec 2024 | Solar |
| Deercroft I & II LFGTE | Wabash Valley Power Assn, Inc | Michigan City, IN | Midcontinent Independent System Operator, Inc. (MISO) | 19.2 GWh | Jul 1999 | Dec 2024 | Landfill Gas |
| Prairie View I & II LFGTE | Wabash Valley Power Assn, Inc | Wyatt, IN | Midcontinent Independent System Operator, Inc. (MISO) | 30.5 GWh | Sep 1994 | Dec 2023 | Landfill Gas |
| Twin Bridges LFGTE | Wabash Valley Power Assn, Inc | Danville, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.1 GWh | Sep 1994 | Dec 2023 | Landfill Gas |
| Clinton LFGTE | Wabash Valley Power Assn, Inc | Clinton, IL | Midcontinent Independent System Operator, Inc. (MISO) | 15.9 GWh | Jan 2006 | Feb 2026 | Landfill Gas |
| Wabash Valley Power IGCC | Wabash Valley Power Assn, Inc | Terre Haute, IN | Midcontinent Independent System Operator, Inc. (MISO) | 405.8 GWh | Nov 1953 | Feb 2026 | Natural Gas |
| Oak Ridge LFGTE | Wabash Valley Power Assn, Inc | Logansport, IN | Midcontinent Independent System Operator, Inc. (MISO) | 25.8 GWh | Nov 2003 | Dec 2024 | Landfill Gas |
| Jay County LFGTE | Wabash Valley Power Assn, Inc | Portland, IN | PJM Interconnection, LLC (PJM) | 19.3 GWh | Mar 2005 | Dec 2024 | Landfill Gas |
| Liberty I & II LFGTE | Wabash Valley Power Assn, Inc | Monticello, IN | Midcontinent Independent System Operator, Inc. (MISO) | 26.7 GWh | Jul 2005 | Dec 2023 | Landfill Gas |
| Earthmovers LFGTE | Wabash Valley Power Assn, Inc | Elkhart, IN | PJM Interconnection, LLC (PJM) | 22.5 GWh | Sep 2010 | Dec 2024 | Landfill Gas |
| W&T Onshore Treating Facility (OTF) | W&T Offshore Inc | Theodore, AL | Southern Company Services, Inc. - Trans (SOCO) | 54.6 GWh | Aug 1993 | Dec 2024 | Natural Gas |
| Vulcan | Vulcan Solar, LLC | Kankakee, IL | PJM Interconnection, LLC (PJM) | 3.6 GWh | Apr 2021 | Nov 2024 | Solar |
| Vitro Architectural Glass (PA) | Vitro Architectural Glass (PA) | Carlisle, PA | PJM Interconnection, LLC (PJM) | 89.0 MWh | Jun 1972 | Dec 2024 | Distillate Fuel Oil |
| Works 4 | Vitro Architectural Glass | Wichita Falls, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 75.0 MWh | May 1974 | Dec 2024 | Distillate Fuel Oil |
| Coffeen Solar BESS | Vistra Corp | Coffeen, IL | Midcontinent Independent System Operator, Inc. (MISO) | 88.9 GWh | Nov 2024 | Feb 2026 | Solar |
| Baldwin Solar BESS | Vistra Corp | Baldwin, IL | Midcontinent Independent System Operator, Inc. (MISO) | 141.8 GWh | Nov 2024 | Feb 2026 | Solar |
| Hopkinton Phase 2 | Vista Solar, Inc. | Ashaway, RI | ISO New England (ISNE) | 3.6 GWh | Aug 2020 | Dec 2024 | Solar |
| Shelter Creek Condominiums Solar | Vista Solar, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 3.5 GWh | Jan 2020 | Dec 2024 | Solar |
| Bio-Rad | Vista Solar, Inc. | Hercules, CA | California Independent System Operator (CISO) | 3.2 GWh | Sep 2021 | Dec 2024 | Solar |
| Virginia Tech Power Plant | Virginia Polytechnic Inst and State Unv | Blacksburg, VA | PJM Interconnection, LLC (PJM) | 7.7 GWh | Feb 1976 | Feb 2026 | Natural Gas : 97.9% Distillate Fuel Oil : 2.1% |
| Virginia Line Solar, LLC | Virginia Line Solar, LLC | Manson, NC | Duke Energy Progress East (CPLE) | 78.4 GWh | Nov 2023 | Feb 2026 | Solar |
| Ladysmith | Virginia Electric & Power Co | Woodford, VA | PJM Interconnection, LLC (PJM) | 989.0 GWh | Apr 2001 | Feb 2026 | Natural Gas : 89.8% Distillate Fuel Oil : 10.2% |
| Hopewell Power Station | Virginia Electric & Power Co | Hopewell, VA | PJM Interconnection, LLC (PJM) | 311.2 GWh | Jun 1992 | Dec 2024 | Wood/Wood Waste Solids : 99.8% |
| Altavista Power Station | Virginia Electric & Power Co | Altavista, VA | PJM Interconnection, LLC (PJM) | 268.7 GWh | Jan 1992 | Dec 2024 | Wood/Wood Waste Solids : 99.8% |
| Rosemary Power Station | Virginia Electric & Power Co | Roanoke Rapids, NC | PJM Interconnection, LLC (PJM) | 15.5 GWh | Oct 1990 | Dec 2024 | Distillate Fuel Oil |
| Remington | Virginia Electric & Power Co | Remington, VA | PJM Interconnection, LLC (PJM) | 862.4 GWh | May 2000 | Dec 2024 | Natural Gas : 98.1% Distillate Fuel Oil : 1.9% |
| Southampton Power Station | Virginia Electric & Power Co | Franklin, VA | PJM Interconnection, LLC (PJM) | 318.5 GWh | Feb 1992 | Dec 2024 | Wood/Wood Waste Solids : 99.7% |
| Gordonsville Energy LP | Virginia Electric & Power Co | Gordonsville, VA | PJM Interconnection, LLC (PJM) | 1.4 TWh | Feb 1994 | Dec 2024 | Natural Gas : 99.8% |
| Elizabeth River Power Station | Virginia Electric & Power Co | Chesapeake, VA | PJM Interconnection, LLC (PJM) | 29.5 GWh | May 1992 | Dec 2024 | Distillate Fuel Oil : 51.8% Natural Gas : 48.2% |
| Brunswick County Power Station | Virginia Electric & Power Co | Freeman, VA | PJM Interconnection, LLC (PJM) | 9.7 TWh | Mar 2016 | Feb 2026 | Natural Gas |
| Hollyfield | Virginia Electric & Power Co | Manquin, VA | PJM Interconnection, LLC (PJM) | 24.9 GWh | Aug 2018 | Dec 2024 | Solar |
| Warren County | Virginia Electric & Power Co | Front Royal, VA | PJM Interconnection, LLC (PJM) | 8.8 TWh | Nov 2014 | Feb 2026 | Natural Gas |
| Bear Garden | Virginia Electric & Power Co | New Canton, VA | PJM Interconnection, LLC (PJM) | 3.5 TWh | Apr 2011 | Feb 2026 | Natural Gas |
| Virginia City Hybrid Energy Center | Virginia Electric & Power Co | St. Paul, VA | PJM Interconnection, LLC (PJM) | 2.1 TWh | Jun 2012 | Feb 2026 | Bituminous Coal : 92.2% Wood/Wood Waste Solids : 7.7% |
| Mt Storm | Virginia Electric & Power Co | Mount Storm, WV | PJM Interconnection, LLC (PJM) | 5.0 TWh | Aug 1965 | Feb 2026 | Bituminous Coal : 99.7% |
| Clover | Virginia Electric & Power Co | Clover, VA | PJM Interconnection, LLC (PJM) | 1.7 TWh | Sep 1995 | Feb 2026 | Bituminous Coal : 99.8% |
| Surry | Virginia Electric & Power Co | Surry, VA | PJM Interconnection, LLC (PJM) | 13.2 TWh | Nov 1972 | Feb 2026 | Nuclear |
| Darbytown | Virginia Electric & Power Co | Richmond, VA | PJM Interconnection, LLC (PJM) | 144.6 GWh | Mar 1990 | Dec 2024 | Natural Gas : 88.2% Distillate Fuel Oil : 11.8% |
| Possum Point | Virginia Electric & Power Co | Dumfries, VA | PJM Interconnection, LLC (PJM) | 2.9 TWh | May 1955 | Feb 2026 | Natural Gas : 99.9% |
| Chesapeake | Virginia Electric & Power Co | Chesapeake, VA | PJM Interconnection, LLC (PJM) | 186.0 MWh | May 1953 | Dec 2024 | Distillate Fuel Oil |
| Northern Neck | Virginia Electric & Power Co | Warsaw, VA | PJM Interconnection, LLC (PJM) | 2.4 GWh | Jun 1971 | Dec 2024 | Distillate Fuel Oil |
| Low Moor | Virginia Electric & Power Co | Covington, VA | PJM Interconnection, LLC (PJM) | 545.0 MWh | Jun 1971 | Dec 2024 | Distillate Fuel Oil |
| Chesterfield | Virginia Electric & Power Co | Chester, VA | PJM Interconnection, LLC (PJM) | 2.1 TWh | Nov 1952 | Feb 2026 | Natural Gas : 96.4% Distillate Fuel Oil : 3.6% |
| Gravel Neck | Virginia Electric & Power Co | Surry, VA | PJM Interconnection, LLC (PJM) | 115.4 GWh | Jul 1970 | Dec 2024 | Natural Gas : 89.7% Distillate Fuel Oil : 10.3% |
| North Anna | Virginia Electric & Power Co | Mineral, VA | PJM Interconnection, LLC (PJM) | 15.0 TWh | May 1978 | Feb 2026 | Nuclear |
| Gaston | Virginia Electric & Power Co | Roanoke Rapids, NC | PJM Interconnection, LLC (PJM) | 183.0 GWh | Jan 1963 | Feb 2026 | Water |
| Roanoke Rapids | Virginia Electric & Power Co | Roanoke Rapids, NC | PJM Interconnection, LLC (PJM) | 271.7 GWh | Aug 1955 | Dec 2024 | Water |
| Woodland Solar Farm | Virginia Electric & Power Co | Smithfield, VA | PJM Interconnection, LLC (PJM) | 32.2 GWh | Nov 2016 | Dec 2024 | Solar |
| Greensville County Power Station | Virginia Electric & Power Co | Emporia, VA | PJM Interconnection, LLC (PJM) | 11.4 TWh | Nov 2018 | Feb 2026 | Natural Gas |
| Western Branch High School | Virginia Electric & Power Co | Chesapeake, VA | PJM Interconnection, LLC (PJM) | 921.0 MWh | Mar 2016 | Apr 2025 | Solar |
| Whitehouse Solar Farm | Virginia Electric & Power Co | Louisa, VA | PJM Interconnection, LLC (PJM) | 34.3 GWh | Nov 2016 | Dec 2024 | Solar |
| Coastal Virginia Offshore Wind (CVOW) Pi | Virginia Electric & Power Co | Virginia Beach, VA | PJM Interconnection, LLC (PJM) | 50.4 GWh | Dec 2020 | Feb 2026 | Wind |
| Oceana Solar | Virginia Electric & Power Co | Virginia Beach, VA | PJM Interconnection, LLC (PJM) | 28.5 GWh | Nov 2017 | Dec 2024 | Solar |
| Remington Solar Facility | Virginia Electric & Power Co | Remington, VA | PJM Interconnection, LLC (PJM) | 32.8 GWh | Sep 2017 | Dec 2024 | Solar |
| Viresco Turtle Lake | Viresco Turtle Lake | Turtle Lake, WI | Midcontinent Independent System Operator, Inc. (MISO) | 7.8 GWh | Aug 2013 | Dec 2024 | Other Biomass Gas |
| Violet Solar | Violet Solar, LLC | Mount Pleasant, NC | Duke Energy Carolinas (DUK) | 8.0 GWh | Nov 2018 | Dec 2024 | Solar |
| West Tisbury Generating Facility | Vineyard Reliability LLC | West Tisbury, MA | ISO New England (ISNE) | 3.0 GWh | Dec 1974 | Dec 2024 | Distillate Fuel Oil |
| Oak Bluffs Diesel Generating Facility | Vineyard Reliability LLC | Oak Bluffs, MA | ISO New England (ISNE) | 2.1 GWh | Dec 1968 | Dec 2024 | Distillate Fuel Oil |
| Winnetka | Village of Winnetka - (IL) | Winnetka, IL | PJM Interconnection, LLC (PJM) | 2.7 GWh | Dec 1947 | Dec 2024 | Natural Gas : 91.7% Distillate Fuel Oil : 8.3% |
| Viola | Village of Viola - (WI) | Viola, WI | Midcontinent Independent System Operator, Inc. (MISO) | 5.0 MWh | Dec 2001 | Dec 2024 | Distillate Fuel Oil |
| Highgate Falls | Village of Swanton - (VT) | Highgate, VT | ISO New England (ISNE) | 46.6 GWh | Jul 1923 | Dec 2024 | Water |
| Spalding | Village of Spalding - (NE) | Spalding, NE | Southwest Power Pool (SWPP) | 4.0 MWh | Jun 1919 | Dec 2024 | Water : 50.0% Distillate Fuel Oil : 50.0% |
| Main Street (MI) | Village of Sebewaing - (MI) | Sebewaing, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.0 MWh | May 1947 | Dec 2023 | Distillate Fuel Oil |
| Pine Street | Village of Sebewaing - (MI) | Sebewaing, MI | Midcontinent Independent System Operator, Inc. (MISO) | 14.3 GWh | May 1969 | Dec 2024 | Natural Gas |
| Charles P Keller | Village of Rockville Centre - (NY) | Rockville Centre, NY | New York Independent System Operator (NYIS) | 123.0 MWh | Dec 1941 | Dec 2024 | Natural Gas : 81.4% Distillate Fuel Oil : 18.6% |
| Rantoul | Village of Rantoul - (IL) | Rantoul, IL | Midcontinent Independent System Operator, Inc. (MISO) | 250.0 MWh | Dec 1950 | Feb 2026 | Distillate Fuel Oil |
| Oxford (NE) | Village of Oxford - (NE) | Oxford, NE | Southwest Power Pool (SWPP) | 27.0 MWh | Jul 1953 | Dec 2024 | Natural Gas : 89.8% Distillate Fuel Oil : 10.2% |
| W K Sanders | Village of Morrisville - (VT) | Hyde Park, VT | ISO New England (ISNE) | 548.0 MWh | Jun 1983 | Dec 2024 | Water |
| Cadys Falls | Village of Morrisville - (VT) | Morrisville, VT | ISO New England (ISNE) | 139.0 MWh | Jul 1914 | Dec 2024 | Water |
| Morrisville | Village of Morrisville - (VT) | Morrisville, VT | ISO New England (ISNE) | 4.9 GWh | Jul 1924 | Dec 2024 | Water |
| Greenport | Village of Greenport - (NY) | Greenport, NY | New York Independent System Operator (NYIS) | 15.0 MWh | May 1957 | Dec 2024 | Distillate Fuel Oil |
| Genoa Diesel Generating Station | Village of Genoa - (OH) | Genoa, OH | PJM Interconnection, LLC (PJM) | 228.0 MWh | Nov 2004 | Dec 2024 | Distillate Fuel Oil |
| Plant No 2 Freeport | Village of Freeport - (NY) | Freeport, NY | New York Independent System Operator (NYIS) | 31.1 GWh | Apr 1973 | Dec 2024 | Natural Gas : 99.7% |
| Plant No 1 Freeport | Village of Freeport - (NY) | Freeport, NY | New York Independent System Operator (NYIS) | 17.0 MWh | Dec 1940 | Dec 2024 | Distillate Fuel Oil |
| Freeburg | Village of Freeburg - (IL) | Freeburg, IL | Midcontinent Independent System Operator, Inc. (MISO) | 122.0 MWh | Jul 1948 | Dec 2024 | Distillate Fuel Oil |
| Cashton | Village of Cashton - (WI) | Cashton, WI | Midcontinent Independent System Operator, Inc. (MISO) | 7.8 MWh | Jul 1932 | Dec 2024 | Distillate Fuel Oil : 98.9% Natural Gas : 1.1% |
| Vikings Energy Farm | Vikings Energy Farm, LLC | Holtville, CA | Imperial Irrigation District (IID) | 309.7 GWh | Apr 2024 | Feb 2026 | Solar |
| Viking Solar CSG | Viking Solar, LLC | Palmyra, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.9 GWh | May 2021 | Dec 2024 | Solar |
| Victory Pass | Victory Pass I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 565.2 GWh | Feb 2024 | Feb 2026 | Solar |
| Victoria | Victoria WLE, LP | Victoria, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.5 TWh | Feb 1963 | Dec 2024 | Natural Gas |
| Victoria Port Power II LLC | Victoria Port Power II | Victoria, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 185.4 GWh | Dec 2021 | Dec 2024 | Natural Gas |
| Vicinity Energy Trenton, L.P. | Vicinity Energy Trenton, L.P. | Trenton, NJ | PJM Interconnection, LLC (PJM) | 177.0 MWh | Nov 1983 | Feb 2026 | Natural Gas : 96.6% Distillate Fuel Oil : 3.4% |
| Grand Ave Plant | Vicinity Energy Kansas City | Kansas City, MO | Southwest Power Pool (SWPP) | 41.1 GWh | Jun 1991 | Feb 2026 | Natural Gas |
| Hornet Solar (TX) | Vesper Energy Development LLC | Tulia, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.4 TWh | - | Feb 2026 | Solar |
| Veseli Community Solar Garden | Veseli Solar I LLC | Webster, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Jan 2018 | Dec 2024 | Solar |
| VPPSA Project 10 | Vermont Public Power Supply Authority | Swanton, VT | ISO New England (ISNE) | 1.2 GWh | Apr 2010 | Dec 2024 | Distillate Fuel Oil |
| West Lorain | Vermillion Power LLC | Lorain, OH | PJM Interconnection, LLC (PJM) | 1.7 TWh | May 1973 | Dec 2024 | Natural Gas : 99.9% |
| Vermilion Solar 1, LLC CSG | Vermilion Solar 1, LLC | Danville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Nov 2020 | Dec 2024 | Solar |
| Verde Light Community Solar | Verde Light Community Solar LLC | Ontario, OR | Idaho Power Company (IPCO) | 6.7 GWh | Nov 2023 | Dec 2024 | Solar |
| Kings Plaza Total Energy Plant (TEP) | Veolia North America | Brooklyn, NY | New York Independent System Operator (NYIS) | 22.4 GWh | Aug 2007 | Dec 2024 | Natural Gas |
| Lederle Laboratories | Veolia NA - Municipal & Commercial Business | Pearl River, NY | New York Independent System Operator (NYIS) | 148.1 GWh | Jun 1990 | Feb 2026 | Natural Gas : 99.1% Distillate Fuel Oil : 0.9% |
| Spruance Operating Services LLC | Veolia Energy Operating Service | Richmond, VA | PJM Interconnection, LLC (PJM) | 65.7 GWh | Apr 1992 | Feb 2026 | Natural Gas |
| Venus Wind 3 LLC | Venus Wind 3 LLC | Grinnell, IA | Midcontinent Independent System Operator, Inc. (MISO) | 10.3 GWh | Feb 2017 | Dec 2024 | Wind |
| Ventura Solar | Ventura Solar LLC | Fillmore, CA | California Independent System Operator (CISO) | 6.2 GWh | Aug 2021 | Dec 2024 | Solar |
| Ventura | Ventura Drive Dartmouth Solar 1, LLC | Dartmouth, MA | ISO New England (ISNE) | 1.8 GWh | May 2022 | Oct 2024 | Solar |
| Venable Solar 2 | Venable Solar, LLC | Blythe, CA | California Independent System Operator (CISO) | 3.4 GWh | Mar 2015 | Dec 2024 | Solar |
Summary of Power Plants By State
Figures are based on February 2026 generation numbers.| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 77 | 10,522.92 GWh |
| Alaska | # 48 | 139 | 547.09 GWh |
| Arizona | # 16 | 184 | 7,875.02 GWh |
| Arkansas | # 25 | 114 | 5,134.19 GWh |
| California | # 5 | 1,677 | 13,090.02 GWh |
| Colorado | # 31 | 294 | 4,129.24 GWh |
| Connecticut | # 32 | 162 | 3,713.11 GWh |
| Delaware | # 49 | 33 | 489.00 GWh |
| District of Columbia | # 51 | 16 | 15.28 GWh |
| Florida | # 3 | 334 | 18,619.02 GWh |
| Georgia | # 8 | 248 | 10,834.93 GWh |
| Hawaii | # 47 | 70 | 669.33 GWh |
| Idaho | # 41 | 145 | 1,901.37 GWh |
| Illinois | # 4 | 380 | 14,875.53 GWh |
| Indiana | # 12 | 216 | 9,790.54 GWh |
| Iowa | # 19 | 290 | 6,378.25 GWh |
| Kansas | # 29 | 183 | 4,702.54 GWh |
| Kentucky | # 22 | 60 | 6,056.73 GWh |
| Louisiana | # 17 | 86 | 7,844.56 GWh |
| Maine | # 45 | 215 | 1,304.77 GWh |
| Maryland | # 38 | 203 | 3,022.33 GWh |
| Massachusetts | # 43 | 638 | 1,703.92 GWh |
| Michigan | # 11 | 268 | 9,944.77 GWh |
| Minnesota | # 28 | 763 | 4,707.75 GWh |
| Mississippi | # 23 | 56 | 5,592.62 GWh |
| Missouri | # 24 | 127 | 5,447.62 GWh |
| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 70 | 2,424.51 GWh |
| Nebraska | # 35 | 124 | 3,248.85 GWh |
| Nevada | # 39 | 114 | 3,017.15 GWh |
| New Hampshire | # 44 | 56 | 1,533.32 GWh |
| New Jersey | # 27 | 386 | 5,076.17 GWh |
| New Mexico | # 37 | 143 | 3,060.89 GWh |
| New York | # 9 | 949 | 10,653.43 GWh |
| North Carolina | # 7 | 903 | 11,173.71 GWh |
| North Dakota | # 33 | 59 | 3,698.46 GWh |
| Ohio | # 6 | 200 | 13,061.62 GWh |
| Oklahoma | # 18 | 141 | 6,415.64 GWh |
| Oregon | # 21 | 270 | 6,135.97 GWh |
| Pennsylvania | # 2 | 251 | 20,963.61 GWh |
| Rhode Island | # 46 | 100 | 708.28 GWh |
| South Carolina | # 15 | 207 | 8,044.42 GWh |
| South Dakota | # 42 | 52 | 1,872.08 GWh |
| Tennessee | # 20 | 88 | 6,323.51 GWh |
| Texas | # 1 | 959 | 41,824.62 GWh |
| Utah | # 36 | 125 | 3,187.35 GWh |
| Vermont | # 50 | 116 | 163.02 GWh |
| Virginia | # 14 | 236 | 9,222.47 GWh |
| Washington | # 13 | 135 | 9,340.69 GWh |
| West Virginia | # 30 | 40 | 4,249.38 GWh |
| Wisconsin | # 26 | 239 | 5,119.83 GWh |
| Wyoming | # 34 | 70 | 3,369.17 GWh |