Works 4 is ranked #42 out of 47 distillate fuel oil power plants in Texas in terms of total annual net electricity generation.
Works 4 is comprised of 3 generators and generated 14.2 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Works 4 |
|---|---|
| Utility Name | Vitro Architectural Glass |
| Location | Wichita County, TX |
| Initial Operation Date | June 1974 |
| Last Update | Dec 2024 |
| Annual Generation | 75.0 MWh |
| Annual Consumption | 860 MMBtu |
| Ranked #12,175 out of 12,539 Power Plants Nationwide | |
| Ranked #858 out of 1,236 Distillate Fuel Oil Power Plants Nationwide | |
| Ranked #790 out of 799 Texas Power Plants | |
| Ranked #42 out of 47 Texas Distillate Fuel Oil Power Plants | |
| Fuel Types | Distillate Fuel Oil |
| Previous Operator |
PPG Industries Inc Works 4 (2013 to 2015) Vitro Architectural Glass (2016 to 2024) |
Map of Works 4
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Works 4.
Monthly Net Generation for Works 4
Works 4 Details
| Summary Information | |
|---|---|
| Plant Name | Works 4 (54364) |
| Plant Address | 7400 Central Freeway North, Wichita Falls, TX 76305 |
| Utility | Vitro Architectural Glass (60538) |
| Latitude, Longitude | 34.00349, -98.55354 |
| Generation Dates on File | Jan 2004 to Dec 2024 |
| Initial Operation Date | June 1974 |
| Annual Generation | 75.0 MWh |
| Fuel Types | Distillate Fuel Oil |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Nonmetallic Mineral Product Manufacturing (327) |
| Sector | Industrial Non-CHP (6) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator L2G Details Standby June 1974
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2 MW |
| Nameplate Power Factor | 0.86 |
| Summer Capacity | 2 MW |
| Winter Capacity | 2 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | Yes |
| First Operation Date | June 1974 |
| Planned Retirement | November 2029 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Industrial Non-CHP (6) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Combustion Technology | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator L1G Details Standby June 1975
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2 MW |
| Nameplate Power Factor | 0.86 |
| Summer Capacity | 2 MW |
| Winter Capacity | 2 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | Yes |
| First Operation Date | June 1975 |
|---|---|
| Planned Retirement | March 2027 |
| Combined Heat & Power | No |
| Sector Name | Industrial Non-CHP (6) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator L1PG Details Standby October 1980
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.9 MW |
| Nameplate Power Factor | 0.86 |
| Summer Capacity | 0.9 MW |
| Winter Capacity | 0.9 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Standby |
| Synchronized To Transmission Grid | Yes |
| First Operation Date | October 1980 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Industrial Non-CHP (6) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Combustion Technology | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Works 4 Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #848 | Invenergy Nelson Expansion LLC | Rock Falls, IL | 780.8 GWh |
| #849 | Factory | Springfield, IL | 78.9 MWh |
| #850 | Osceola Generating Station (FL) | St. Cloud, FL | 623.0 MWh |
| #851 | Oberlin (OH) | Oberlin, OH | 634.0 MWh |
| #852 | Sediver | York, SC | 78.0 MWh |
| #853 | Cedar Hills | Maple Valley, WA | 78.0 MWh |
| #854 | Poplar Bluff Generating Station | Poplar Bluff, MO | 560.0 MWh |
| #855 | CNN Center | Atlanta, GA | 77.0 MWh |
| #856 | Drexel Operations Center | Drexel, NC | 77.0 MWh |
| #857 | Montezuma | Montezuma, IA | 119.0 MWh |
| #859 | Wolf Creek Generator | Burlington, KS | 75.0 MWh |
| #860 | Holton | City of Holton, KS | 816.0 MWh |
| #861 | Girard | Girard, KS | 109.0 MWh |
| #862 | Cherry Street | Hudson, MA | 199.0 MWh |
| #863 | Beaver Island | Beaver Island, MI | 71.0 MWh |
| #864 | St. Charles Power Plant | St. Charles, MN | 71.0 MWh |
| #865 | NYC-HH-New Bellevue Hospital | New York, NY | 71.0 MWh |
| #866 | Thermal Kem | Rock Hill, SC | 70.0 MWh |
| #867 | Alta Municipal Utilities | Alta, IA | 70.0 MWh |
| #868 | Tipton | Tipton, IA | 69.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Works 4.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Blue Canyon Windpower | Carnegie, OK | 39.6 GWh | 58.6 mi |
| Blue Canyon Windpower V LLC | Carnegie, OK | 262.8 GWh | 56.8 mi |
| Blue Summit II Wind | Vernon, TX | 351.5 GWh | 55.1 mi |
| Blue Summit Wind LLC | Vernon, TX | 508.1 GWh | 50.7 mi |
| Bobcat Bluff Wind Project LLC | Archer, TX | 462.3 GWh | 35.3 mi |
| Comanche (OK) | Lawton, OK | 500.6 GWh | 39.5 mi |
| Diversion Wind Energy LLC | Seymour, TX | 570.5 GWh | 33.3 mi |
| Electra Wind Farm | Oklaunion, TX | 828.7 GWh | 33.1 mi |
| Green Pastures Wind I | Seymour, TX | 277.5 GWh | 55.6 mi |
| Kiowa County Solar Project, LLC | Snyder, OK | 181.2 GWh | 51.6 mi |
| Lockett Windfarm | Vernon, TX | 708.8 GWh | 41 mi |
| North Fork Solar Project | Snyder, OK | 284.7 GWh | 49 mi |
| Senate Wind LLC | Bryson, TX | 413.7 GWh | 56.2 mi |
| Seymour Hills Wind Project, LLC | Seymour, TX | 116.7 GWh | 47 mi |
| Shannon Wind | Windhorst, TX | 445.7 GWh | 35.9 mi |
| Signal Hill Generating LLC | Wichita Falls, TX | 2.0 GWh | 10 mi |
| Trinity Hills | Olney, TX | 747.9 GWh | 43.8 mi |
| WAL414 | Wichita Falls, TX | 153.0 MWh | 10.6 mi |
| Western Trail Wind, LLC | Electra, TX | 1.1 TWh | 31.1 mi |
| Windthorst-2 | Archer, TX | 206.4 GWh | 35.2 mi |