W K Sanders
1740 Green River Dam Road, Hyde Park, VT 5655Plant Summary Information
W K Sanders is ranked #45 out of 46 hydroelectric power plants in Vermont in terms of total annual net electricity generation.
W K Sanders is comprised of 2 generators and generated 40.0 MWh during the 3-month period between August 2025 to November 2025.
| Plant Name | W K Sanders |
|---|---|
| Utility Name | Village of Morrisville - (VT) |
| Location | Lamoille County, VT |
| Initial Operation Date | July 1983 |
| Last Update | Nov 2025 |
| Annual Generation | 716.0 MWh |
| Annual Consumption | 2.4 k MMBtu |
| Ranked #12,128 out of 13,081 Power Plants Nationwide | |
| Ranked #1,285 out of 1,311 Water Power Plants Nationwide | |
| Ranked #109 out of 114 Vermont Power Plants | |
| Ranked #45 out of 46 Vermont Water Power Plants | |
| Fuel Types | Water |
Map of W K Sanders
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for W K Sanders.
Monthly Net Generation for W K Sanders
Monthly Plant Fuel Consumption for W K Sanders
W K Sanders Details
| Summary Information | |
|---|---|
| Plant Name | W K Sanders (678) |
| Plant Address | 1740 Green River Dam Road, Hyde Park, VT 5655 |
| Utility | Village of Morrisville - (VT) (12989) |
| Latitude, Longitude | 44.62528, -72.53086 |
| Generation Dates on File | Jan 2001 to Nov 2025 |
| Initial Operation Date | July 1983 |
| Annual Generation | 716.0 MWh |
| Fuel Types | Water |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | NPCC |
| Balancing Authority | ISO New England Inc. (ISNE) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Green River Reservoir |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Village of Morrisville - (VT) (12989) VT |
| Grid Voltage | 34.50 kV |
| Energy Storage | No |
Generator 1 Details Operating July 1983
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 4466 |
| Nameplate Capacity | 0.9 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 0.7 MW |
| Winter Capacity | 0.9 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 1983 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
Generator 2 Details Operating July 1983
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 4466 |
| Nameplate Capacity | 0.9 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 0.7 MW |
| Winter Capacity | 0.9 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 1983 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
W K Sanders Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1275 | Manti Lower | Manti, UT | 1.1 GWh |
| #1276 | Marshall (MI) | Marshall, MI | 638.0 MWh |
| #1277 | Normanskill Hydro Project | Guilderland, NY | 1.0 GWh |
| #1278 | Hollow Dam Power Partnership | Gouveneur, NY | 1.0 GWh |
| #1279 | Etiwanda | Rancho Cucamonga, CA | 1.0 GWh |
| #1280 | Ruxton Park | Manitou Spring, CO | 1.0 GWh |
| #1281 | Ball Mountain Hydro | Jamaica, VT | 995.0 MWh |
| #1282 | Halifax (VA) | Halifax, VA | 811.0 MWh |
| #1283 | Bend | Bend, OR | 797.0 MWh |
| #1284 | Mill Creek 3 | Mill Creek, CA | 771.0 MWh |
| #1286 | South Dry Creek Hydro | Red Lodge, MT | 696.0 MWh |
| #1287 | Springville Hydroelectric | Camarillo, CA | 659.0 MWh |
| #1288 | Cosgrove Intake and Power Station | Clinton, MA | 646.0 MWh |
| #1289 | Talcville | Edwards, NY | 616.0 MWh |
| #1290 | Lateral 10 Ventures | Buhl, ID | 565.0 MWh |
| #1291 | Squa Pan Hydro Station | Masardis, ME | 564.0 MWh |
| #1292 | Niangua | Camdenton, MO | 536.0 MWh |
| #1293 | Domtar Paper Company Rothschild | Rothschild, WI | 524.0 MWh |
| #1294 | Spartanburg Water System | Chesnee, SC | 620.0 MWh |
| #1295 | Somersworth Lower Great Dam | Somersworth, NH | 498.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding W K Sanders.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Barton Solar Farm | Barton, VT | 2.5 GWh | 18.4 mi |
| Billings Road | Hardwick, VT | 2.2 GWh | 10.6 mi |
| Bolton Falls | Duxbury, VT | 6.1 GWh | 23.2 mi |
| Cadys Falls | Morrisville, VT | 2.2 GWh | 5.2 mi |
| Coventry Clean Energy Corporation | Coventry, VT | 57.4 GWh | 24.8 mi |
| Coventry Photovoltaic, LLC | Coventry, VT | 2.7 GWh | 24.9 mi |
| ER Center Road Solar, LLC | Hardwick, VT | 3.0 GWh | 12.2 mi |
| ER Salvage Yard | Morrisville, VT | 2.8 GWh | 6.8 mi |
| Fairfax Falls | Fairfax, VT | 16.1 GWh | 23 mi |
| Jericho Gravel Solar Farm | Jerico, VT | 2.3 GWh | 23.4 mi |
| Kingdom Community Wind | Lowell, VT | 164.4 GWh | 10 mi |
| Lawrence Brook | Morristown, VT | 3.0 GWh | 8.8 mi |
| Marshfield 6 | Marshfield, VT | 3.9 GWh | 20.7 mi |
| Middlesex 2 | Moretown, VT | 5.9 GWh | 24.2 mi |
| Morrisville | Morrisville, VT | 5.0 GWh | 5.6 mi |
| Nebraska Valley Solar Farm | Stowe, VT | 1.2 GWh | 16.3 mi |
| Sheffield Wind | Sheffield, VT | 56.9 GWh | 21.4 mi |
| Waterbury 22 | Waterbury, VT | 11.4 GWh | 20.5 mi |
| West Danville 15 | Danville, VT | 2.2 GWh | 22.7 mi |
| Wrightsville Hydro Plant | Montpelier, VT | 374.0 MWh | 21.9 mi |