Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Edward C Hyatt | California Dept. of Water Resources | Oroville, CA | California Independent System Operator (CISO) | 1.9 TWh | Feb 1968 | Nov 2025 | Water |
| Alamo | California Dept. of Water Resources | Pearblossom, CA | California Independent System Operator (CISO) | 55.9 GWh | Jun 1986 | Dec 2024 | Water |
| Devil Canyon | California Dept. of Water Resources | San Bernardino, CA | California Independent System Operator (CISO) | 777.2 GWh | Nov 1972 | Nov 2025 | Water |
| Salton Sea Power Gen Co - Unit 4 | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 179.8 GWh | Apr 1996 | Dec 2024 | Geothermal |
| CE Leathers | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 70.6 GWh | Oct 1989 | Dec 2024 | Geothermal |
| Del Ranch Company | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 326.3 GWh | Sep 1988 | Dec 2024 | Geothermal |
| Salton Sea Power Gen Co - Unit 3 | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 314.9 GWh | Jan 1989 | Dec 2024 | Geothermal |
| Vulcan-BN Geothermal Power Company | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 227.2 GWh | Nov 1985 | Dec 2024 | Geothermal |
| Elmore Company | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 104.3 GWh | Oct 1988 | Dec 2024 | Geothermal |
| Salton Sea Power Gen Co - Unit 1 | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 78.4 GWh | Jun 1982 | Dec 2024 | Geothermal |
| Salton Sea Power Gen Co - Unit 2 | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 107.0 GWh | Feb 1990 | Dec 2024 | Geothermal |
| Salton Sea Power LLC - Unit 5 | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 290.3 GWh | Mar 2000 | Dec 2024 | Geothermal |
| Caldwell Wastewater Treatment Plant Hybr | Caldwell Wastewater Treatment Plant | West Caldwell, NJ | PJM Interconnection, LLC (PJM) | 967.0 MWh | Nov 2016 | Dec 2024 | Solar |
| Moonlight Packing - Phase 2 | CalCom Energy | Reedley, CA | California Independent System Operator (CISO) | 2.6 GWh | May 2019 | Dec 2024 | Solar |
| D'Arrigo Brothers - Phase 4 | CalCom Energy | Salinas, CA | California Independent System Operator (CISO) | 4.3 GWh | Feb 2019 | Dec 2024 | Solar |
| Graniterock Quarry | CalCom Energy | Aromas, CA | California Independent System Operator (CISO) | 8.9 GWh | Aug 2022 | Dec 2024 | Solar |
| CalCity Solar 1 | CalCity Solar 1, LLC | California City, CA | California Independent System Operator (CISO) | 7.9 GWh | Oct 2019 | Dec 2024 | Solar |
| North Hurlburt Wind LLC | Caithness Shepherds Flat LLC | Arlington, OR | Bonneville Power Administration (BPAT) | 500.3 GWh | Jan 2012 | Nov 2025 | Wind |
| South Hurlburt Wind LLC | Caithness Shepherds Flat LLC | Arlington, OR | Bonneville Power Administration (BPAT) | 543.8 GWh | Jun 2012 | Nov 2025 | Wind |
| Horseshoe Bend Wind LLC | Caithness Shepherds Flat LLC | Arlington, OR | Bonneville Power Administration (BPAT) | 559.3 GWh | Jun 2012 | Nov 2025 | Wind |
| Caithness Long Island Energy Center | Caithness Long Island, LLC | Yaphank, NY | New York Independent System Operator (NYIS) | 2.4 TWh | Jul 2009 | Nov 2025 | Natural Gas |
| Caelum Community Solar | Caelum Community Solar | Foley, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.8 GWh | Sep 2017 | Dec 2024 | Solar |
| Cadillac Renewable Energy | Cadillac Renewable Energy LLC | Cadillac, MI | Midcontinent Independent System Operator, Inc. (MISO) | 135.7 GWh | Jul 1993 | Dec 2024 | Wood/Wood Waste Solids |
| Caden Energix Wytheville LLC | Caden Energix Wytheville LLC | Wytheville, VA | PJM Interconnection, LLC (PJM) | 38.5 GWh | May 2022 | Dec 2024 | Solar |
| Caden Energix Rives Road LLC | Caden Energix Rives Road LLC | Petersburg, VA | PJM Interconnection, LLC (PJM) | 29.8 GWh | Apr 2020 | Dec 2024 | Solar |
| Caden Energix Pamplin LLC | Caden Energix Pamplin LLC | Appomattox, VA | PJM Interconnection, LLC (PJM) | 31.2 GWh | Jun 2020 | Dec 2024 | Solar |
| Caden Energix Hickory LLC | Caden Energix Hickory LLC | Chesapeake, VA | PJM Interconnection, LLC (PJM) | 57.2 GWh | Jul 2020 | Nov 2025 | Solar |
| Caden Energix Endless Caverns, LLC | Caden Energix Endless Caverns, LLC | New Market, VA | PJM Interconnection, LLC (PJM) | 53.5 GWh | Nov 2023 | Nov 2025 | Solar |
| Caden Energix Axton LLC | Caden Energix Axton LLC | Axton, VA | PJM Interconnection, LLC (PJM) | 123.5 GWh | Nov 2023 | Nov 2025 | Solar |
| Cabin Creek Solar, LLC | Cabin Creek Solar, LLC | Biscoe, NC | Duke Energy Progress East (CPLE) | 163.3 GWh | Dec 2022 | Nov 2025 | Solar |
| Windsor Floating Solar | CA ODEVI LLC | Windsor, CA | California Independent System Operator (CISO) | 2.5 GWh | Oct 2020 | Dec 2024 | Solar |
| Starratt Solar | C2 Starratt Solar LLC | Jacksonville, FL | JEA (JEA) | 7.4 GWh | Nov 2017 | Dec 2024 | Solar |
| Lakeville Solar | C2 MA Lakeville, LLC | Lakeville, MA | ISO New England (ISNE) | 3.7 GWh | Nov 2018 | Dec 2024 | Solar |
| C&H Sugar Plant | C&H Sugar Company Inc | Crockett, CA | California Independent System Operator (CISO) | 32.5 GWh | Sep 1957 | Nov 2025 | Purchased Steam |
| Waterloo Hydroelectric Project | C-S Canal Hydro, LLC | Waterloo, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Dec 1914 | Dec 2024 | Water |
| Seneca Falls Hydroelectric Project | C-S Canal Hydro, LLC | Seneca Falls, NY | New York Independent System Operator (NYIS) | 9.8 GWh | Dec 1916 | Dec 2024 | Water |
| C-Drop Hydro | C-Drop | Klamath Falls, OR | PacifiCorp West (PACW) | 574.0 MWh | Apr 2012 | Aug 2024 | Water |
| Byrne Solar, LLC | Byrne Solar, LLC | Lowell, MI | Midcontinent Independent System Operator, Inc. (MISO) | 9.9 GWh | Sep 2023 | Dec 2024 | Solar |
| BWC Wareham River | BWC Wareham River, LLC | Wareham, MA | ISO New England (ISNE) | 1.7 GWh | Nov 2018 | Dec 2024 | Solar |
| BWC Swan Pond River CSG | BWC Swan Pond River, LLC | Rehoboth, MA | ISO New England (ISNE) | 3.0 GWh | Nov 2015 | Dec 2024 | Solar |
| BWC Pocasset River | BWC Pocasset River, LLC | Wareham, MA | ISO New England (ISNE) | 2.4 GWh | Nov 2018 | Dec 2024 | Solar |
| New Bedford (MA) Plymouth | BWC Origination 4, LLC | Plymouth, MA | ISO New England (ISNE) | 7.0 GWh | Jun 2014 | Dec 2024 | Solar |
| BWC Origination 18 | BWC Origination 18, LLC | Mattapoisett, MA | ISO New England (ISNE) | 7.6 GWh | Nov 2018 | Dec 2024 | Solar |
| BWC Harlow Brook | BWC Harlow Brook, LLC | Wareham, MA | ISO New England (ISNE) | 2.2 GWh | Nov 2018 | Dec 2024 | Solar |
| Westport B Community Solar Garden | BWC Hamilton Brook LLC | Westport, MA | ISO New England (ISNE) | 7.5 GWh | Oct 2018 | Dec 2024 | Solar |
| BWC Gibbs Brook | BWC Gibbs Brook, LLC | Wareham, MA | ISO New England (ISNE) | 6.4 GWh | Nov 2018 | Dec 2024 | Solar |
| Wilbraham | BWC East Brook, LLC | Wilbraham, MA | ISO New England (ISNE) | 5.3 GWh | Nov 2020 | Dec 2024 | Solar |
| Adirondack A+B Community Solar Garden | BWC Connecticut River LLC | Westport, MA | ISO New England (ISNE) | 8.3 GWh | Nov 2018 | Dec 2024 | Solar |
| Dover (MA) | BWC Buckmaster Pond LLC | Dover, MA | ISO New England (ISNE) | 1.7 GWh | Jul 2017 | Dec 2024 | Solar |
| Mendon | BWC Box Pond LLC | Mendon, MA | ISO New England (ISNE) | 3.8 GWh | Nov 2017 | Dec 2024 | Solar |
| Westport Community Solar Garden | BWC Bass River LLC | Westport, MA | ISO New England (ISNE) | 3.7 GWh | Jun 2017 | Dec 2024 | Solar |
| Arcadia Solar | Butter Solar, LLC | Arcadia, WI | Midcontinent Independent System Operator, Inc. (MISO) | 8.5 GWh | Aug 2019 | Dec 2024 | Solar |
| New Lisbon Solar | Butter Solar, LLC | New Lisbon, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Aug 2019 | Dec 2024 | Solar |
| Cumberland Solar | Butter Solar, LLC | Cumberland, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Aug 2019 | Dec 2024 | Solar |
| Cashton Solar | Butter Solar, LLC | Cashton, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.2 GWh | Aug 2019 | Dec 2024 | Solar |
| Forest City Solar | Butter Solar, LLC | Forest City, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Aug 2019 | Dec 2024 | Solar |
| Elroy Solar | Butter Solar, LLC | Mauston, WI | Midcontinent Independent System Operator, Inc. (MISO) | 2.5 GWh | Aug 2019 | Dec 2024 | Solar |
| Fennimore Solar | Butter Solar, LLC | Fennimore, WI | Midcontinent Independent System Operator, Inc. (MISO) | 3.6 GWh | Aug 2019 | Dec 2024 | Solar |
| St. Charles Solar | Butter Solar, LLC | St Charles Township, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Aug 2019 | Dec 2024 | Solar |
| Butte College Main Campus Solar | Butte-Glenn Community College District | Oroville, CA | California Independent System Operator (CISO) | 6.3 GWh | Jun 2011 | Dec 2024 | Solar |
| Butler Ridge | Butler Ridge Wind Energy Center | Mayville, WI | Midcontinent Independent System Operator, Inc. (MISO) | 138.2 GWh | Jan 2009 | Nov 2025 | Wind |
| Burrstone Energy Center | Burrstone Energy Center | New Hartford, NY | New York Independent System Operator (NYIS) | 10.0 GWh | Jul 2009 | Dec 2024 | Natural Gas |
| Burney Forest Products | Burney Forest Products, A Joint Venture | Burney, CA | California Independent System Operator (CISO) | 193.3 GWh | Sep 1989 | Dec 2024 | Wood/Wood Waste Solids : 94.4% Natural Gas : 5.6% |
| PSEG Burlington Generating Station | Burlington Generating Station | Burlington, NJ | PJM Interconnection, LLC (PJM) | 49.9 GWh | May 1967 | Dec 2024 | Natural Gas : 99.8% |
| Burke Wind, LLC | Burke Wind LLC | Bowbells, ND | Southwest Power Pool (SWPP) | 775.4 GWh | Nov 2020 | Nov 2025 | Wind |
| Bunge North America East LLC | Bunge North America East LLC | Decatur, IN | PJM Interconnection, LLC (PJM) | 9.3 GWh | Nov 1950 | Jul 2025 | Natural Gas |
| Bullock Road Solar 1 | Bullock Road Solar 1, LLC | Freetown, MA | ISO New England (ISNE) | 3.5 GWh | Jun 2018 | Dec 2024 | Solar |
| Bullhead Solar, LLC | Bullhead Solar, LLC | Fayette, MI | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Dec 2020 | Dec 2024 | Solar |
| Bulldog | Bulldog Wind Energy, LLC | Orient, IA | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Sep 2010 | Dec 2024 | Wind |
| Bulldog Solar LLC | Bulldog Solar LLC | Warrenton, GA | Southern Company Services, Inc. - Trans (SOCO) | 171.4 GWh | Apr 2023 | Nov 2025 | Solar |
| Bull Creek Wind | Bull Creek Wind LLC | O'Donnell, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 265.2 GWh | Nov 2008 | Dec 2024 | Wind |
| Buffalo Ridge Wind | Buffalo Ridge Wind, LLC | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 438.3 GWh | Nov 2022 | Nov 2025 | Wind |
| Buffalo Garden | Buffalo Garden LLC | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Feb 2020 | Dec 2024 | Solar |
| Buffalo Dunes Wind Project | Buffalo Dunes Wind Project LLC | Satanta, KS | Southwest Power Pool (SWPP) | 793.1 GWh | Nov 2013 | Nov 2025 | Wind |
| Buffalo Center Wind LLC | Buffalo Center Wind LLC | Little Cedar, IA | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Oct 2011 | Dec 2024 | Wind |
| Buffalo Bear LLC | Buffalo Bear, LLC | Woodward, OK | Southwest Power Pool (SWPP) | 18.8 GWh | Nov 2008 | Dec 2024 | Wind |
| Buena Vista Energy Center | Buena Vista Energy Center, LLC | Chaparral, NM | El Paso Electric Company (EPE) | 387.7 GWh | May 2023 | Nov 2025 | Solar |
| Buckthorn Wind | Buckthorn Wind Project, LLC | Mingus, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 355.1 GWh | Nov 2017 | Nov 2025 | Wind |
| Buckthorn Westex | Buckthorn Westex, LLC | Ft. Stockton, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 357.2 GWh | Apr 2018 | Nov 2025 | Solar |
| Bucksport Generation LLC | Bucksport Generation LLC | Bucksport, ME | ISO New England (ISNE) | 10.5 GWh | Jun 1965 | Nov 2025 | Natural Gas : 97.4% Distillate Fuel Oil : 2.6% |
| Bucknell University | Bucknell University | Lewisburg, PA | PJM Interconnection, LLC (PJM) | 43.4 GWh | Sep 1991 | Nov 2025 | Natural Gas : 98.3% Distillate Fuel Oil : 1.7% |
| Greenville Electric Generating Station | Buckeye Power, Inc | Greenville, OH | PJM Interconnection, LLC (PJM) | 105.0 GWh | May 2000 | Dec 2024 | Natural Gas : 99.6% |
| Robert P Mone Plant | Buckeye Power, Inc | Convoy, OH | PJM Interconnection, LLC (PJM) | 310.3 GWh | Jun 2002 | Dec 2024 | Natural Gas : 99.5% |
| BT Signal Ranch | BT Signal Ranch, LLC | Quinlan, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 98.5 GWh | Nov 2024 | Nov 2025 | Solar |
| Noble Solar | BT Noble Solar, LLC | Krum, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 532.6 GWh | Aug 2022 | Nov 2025 | Solar |
| BT Jungmann | BT Jungmann, LLC | Buckholts, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 80.7 GWh | - | Nov 2025 | Solar |
| BT Hickerson Solar, LLC | BT Hickerson Solar, LLC | Clifton, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 166.1 GWh | - | Nov 2025 | Solar |
| Coniglio Solar | BT Coniglio Solar LLC | Wolfe City, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 203.2 GWh | Jul 2021 | Nov 2025 | Solar |
| Brush Generation Facility | Brush Power LLC | Brush, CO | Public Service Company of Colorado (PSCO) | 153.7 GWh | Sep 1990 | Dec 2024 | Natural Gas |
| Brush Creek Solar | Brush Creek Solar, LLC | Silverton, OR | Portland General Electric Company (PGE) | 15.0 MWh | Apr 2020 | Dec 2024 | Solar |
| Brunswick Cellulose | Brunswick Cellulose LLC | Brunswick, GA | Southern Company Services, Inc. - Trans (SOCO) | 226.3 GWh | May 1954 | Nov 2025 | Black Liquor : 65.2% Natural Gas : 25.2% Wood/Wood Waste Solids : 5.2% Residual Fuel Oil : 3.7% Tire-derived Fuels : 0.7% |
| Brunot Island | Brunot Island Power, LLC | Pittsburg, PA | PJM Interconnection, LLC (PJM) | 54.1 GWh | Feb 1972 | Dec 2024 | Natural Gas |
| Brunner Island | Brunner Island LLC | York Haven, PA | PJM Interconnection, LLC (PJM) | 4.0 TWh | Apr 1961 | Nov 2025 | Natural Gas : 60.1% Bituminous Coal : 39.9% |
| Silas Ray | Brownsville Public Utilities Board | Brownsville, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 103.4 GWh | Apr 1952 | Dec 2024 | Natural Gas |
| Broshco Fabricated Products | Broshco Fabricated Products | Mansfield, OH | PJM Interconnection, LLC (PJM) | 281.0 MWh | Aug 2001 | Aug 2025 | Natural Gas |
| Nanticoke LFG | Broome Energy Resources, LLC | Binghamton, NY | New York Independent System Operator (NYIS) | 28.2 GWh | Feb 2006 | Dec 2024 | Landfill Gas |
| Brooklyn Navy Yard Cogeneration | Brooklyn Navy Yard Cogen PLP | Brooklyn, NY | New York Independent System Operator (NYIS) | 1.9 TWh | Feb 1996 | Nov 2025 | Natural Gas : 97.9% Distillate Fuel Oil : 2.1% |
| Brooklyn Hospital Center | Brooklyn Hospital Center | Brooklyn, NY | New York Independent System Operator (NYIS) | 8.0 MWh | Dec 1974 | Dec 2024 | Distillate Fuel Oil |
| Aziscohos Hydroelectric Project | Brookfield White Pine Hydro LLC | Wilson Mills, ME | ISO New England (ISNE) | 36.3 GWh | May 1988 | Dec 2024 | Water |
| Brunswick Hydro | Brookfield White Pine Hydro LLC | Brunswick, ME | ISO New England (ISNE) | 88.1 GWh | Feb 1982 | Dec 2024 | Water |
Summary of Power Plants By State
Figures are based on November 2025 generation numbers.| State | Rank | Active Plants | Nov 2025 Generation |
|---|---|---|---|
| Alabama | # 7 | 76 | 11,511.20 GWh |
| Alaska | # 48 | 144 | 528.08 GWh |
| Arizona | # 13 | 184 | 8,245.57 GWh |
| Arkansas | # 24 | 116 | 5,216.59 GWh |
| California | # 4 | 1,736 | 15,288.71 GWh |
| Colorado | # 29 | 302 | 4,252.83 GWh |
| Connecticut | # 34 | 166 | 3,697.17 GWh |
| Delaware | # 49 | 33 | 425.33 GWh |
| District of Columbia | # 51 | 16 | 14.43 GWh |
| Florida | # 2 | 323 | 18,667.27 GWh |
| Georgia | # 8 | 262 | 11,183.00 GWh |
| Hawaii | # 47 | 73 | 801.36 GWh |
| Idaho | # 43 | 146 | 1,663.41 GWh |
| Illinois | # 5 | 384 | 14,942.91 GWh |
| Indiana | # 15 | 211 | 7,722.21 GWh |
| Iowa | # 19 | 293 | 6,283.14 GWh |
| Kansas | # 32 | 187 | 4,136.03 GWh |
| Kentucky | # 21 | 60 | 5,370.35 GWh |
| Louisiana | # 12 | 86 | 8,259.66 GWh |
| Maine | # 45 | 216 | 1,300.62 GWh |
| Maryland | # 40 | 203 | 2,568.19 GWh |
| Massachusetts | # 41 | 648 | 1,975.71 GWh |
| Michigan | # 9 | 273 | 10,785.64 GWh |
| Minnesota | # 28 | 765 | 4,723.22 GWh |
| Mississippi | # 23 | 57 | 5,274.88 GWh |
| Missouri | # 22 | 128 | 5,368.91 GWh |
| State | Rank | Active Plants | Nov 2025 Generation |
|---|---|---|---|
| Montana | # 39 | 71 | 2,609.34 GWh |
| Nebraska | # 35 | 129 | 3,447.15 GWh |
| Nevada | # 38 | 114 | 3,066.88 GWh |
| New Hampshire | # 44 | 60 | 1,466.90 GWh |
| New Jersey | # 27 | 393 | 4,952.95 GWh |
| New Mexico | # 36 | 144 | 3,313.38 GWh |
| New York | # 10 | 956 | 10,414.21 GWh |
| North Carolina | # 11 | 909 | 9,927.17 GWh |
| North Dakota | # 33 | 61 | 3,714.56 GWh |
| Ohio | # 6 | 198 | 11,688.48 GWh |
| Oklahoma | # 18 | 143 | 6,525.64 GWh |
| Oregon | # 20 | 275 | 5,407.05 GWh |
| Pennsylvania | # 3 | 256 | 17,277.29 GWh |
| Rhode Island | # 46 | 100 | 833.56 GWh |
| South Carolina | # 16 | 208 | 7,560.03 GWh |
| South Dakota | # 42 | 52 | 1,785.37 GWh |
| Tennessee | # 26 | 88 | 5,030.87 GWh |
| Texas | # 1 | 955 | 43,514.30 GWh |
| Utah | # 37 | 125 | 3,174.08 GWh |
| Vermont | # 50 | 117 | 164.43 GWh |
| Virginia | # 17 | 239 | 7,087.47 GWh |
| Washington | # 14 | 137 | 7,966.23 GWh |
| West Virginia | # 31 | 39 | 4,211.99 GWh |
| Wisconsin | # 25 | 250 | 5,195.24 GWh |
| Wyoming | # 30 | 71 | 4,237.64 GWh |