Nearman Creek is ranked #22 out of 151 power plants in Kansas in terms of total annual net electricity generation.
Nearman Creek is comprised of 2 generators and generated 117.7 GWh during the 3-month period between November 2023 to February 2024.
Plant Name | Nearman Creek |
---|---|
Utility Name | City of Kansas City - (KS) |
Location | Wyandotte County, KS |
Initial Operation Date | June 1981 |
Last Update | Feb 2024 |
Annual Generation | 825.5 GWh |
Annual Consumption | 9.5 M MMBtu |
Ranked #891 out of 11,455 Power Plants Nationwide | |
Ranked #95 out of 140 Subbituminous Coal Power Plants Nationwide | |
Ranked #22 out of 151 Kansas Power Plants | |
Ranked #5 out of 5 Kansas Subbituminous Coal Power Plants | |
Fuel Types | Subbituminous Coal : 88.4% Natural Gas : 10.3% Distillate Fuel Oil : 1.3% |
Map of Nearman Creek
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Nearman Creek.
Monthly Net Generation for Nearman Creek
Nearman Creek Details
Summary Information | |
---|---|
Plant Name | Nearman Creek (6064) |
Plant Address | 4240 North 55th St Kansas, KS 66104 |
Utility | City of Kansas City - (KS) (9996) |
Latitude, Longitude | 39.1681, -94.6975 |
Generation Dates on File | Jan 2001 to Feb 2024 |
Initial Operation Date | June 1981 |
Annual Generation | 825.5 GWh |
Fuel Types | Subbituminous Coal : 88.4% Natural Gas : 10.3% Distillate Fuel Oil : 1.3% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Missouri River |
Ash Impoundment | Yes Not Lined Out of Service |
Transmission / Distribution Owner | City of Kansas City - (KS) (9996) KS |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name |
SOUTHERN STAR CENTRAL GAS PIPELINE KPC PIPELINE LLC |
Natural Gas Storage | No |
Generator 1 Details Operating June 1981
Technology | Conventional Steam Coal |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | kacy |
RTO ISO Location Designation For Reporting Wholesale Sales Data | kacy |
Nameplate Capacity | 261 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 243 MW |
Winter Capacity | 243 MW |
Minimum Load | 150 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 1981 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Subbituminous Coal |
Startup Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Pulverized Coal Technology | Yes |
Subcritical Technology | Yes |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT4 Details Operating February 2006
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | kacy |
RTO ISO Location Designation For Reporting Wholesale Sales Data | kacy |
Nameplate Capacity | 104 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 76 MW |
Winter Capacity | 76 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 74.8 MW |
Net Winter Capacity With Natural Gas | 74.8 MW |
Net Summer Capacity With Oil | 74.8 MW |
Net Winter Capacity With Oil | 74.8 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Nearman Creek Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Subbituminous Coal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#85 | AES Hawaii | Kapolei, HI | 1.1 TWh |
#86 | Ray D Nixon | Fountain, CO | 1.0 TWh |
#87 | Wygen III | Gillette, WY | 880.8 GWh |
#88 | Hugo | Fort Towson, OK | 854.0 GWh |
#89 | Rush Island | Festus, MO | 851.3 GWh |
#90 | GREC | Chouteau, OK | 3.9 TWh |
#91 | Wygen 2 | Gillette, WY | 784.6 GWh |
#92 | Erickson Station | Lansing, MI | 783.9 GWh |
#93 | Muskogee | Fort Gibson, OK | 2.0 TWh |
#94 | Sheldon | Hallam, NE | 764.8 GWh |
#96 | Wygen 1 | Gillette, WY | 700.4 GWh |
#97 | Archer Daniels Midland Clinton | Clinton, IA | 770.8 GWh |
#98 | Lansing | Lansing, IA | 683.0 GWh |
#99 | Neil Simpson II | Gillette, WY | 730.8 GWh |
#100 | Will County | Romeoville, IL | 670.5 GWh |
#101 | North Valmy | Valmy, NV | 1.1 TWh |
#102 | Archer Daniels Midland Cedar Rapids | Cedar Rapids, IA | 1.0 TWh |
#103 | Trenton Channel | Trenton, MI | 644.7 GWh |
#104 | Dan E Karn | Essexville, MI | 634.3 GWh |
#105 | Kyger Creek | Cheshire, OH | 5.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Nearman Creek.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
BPU Solar Farm | Kansas City, KS | 1.9 GWh | 0.1 mi |
Dogwood Energy Facility | Pleasant Hill, MO | 2.9 TWh | 33.6 mi |
Gardner Energy Center | Gardner, KS | 41.2 MWh | 25.5 mi |
Grand Ave Plant | Kansas City, MO | 44.0 GWh | 7.3 mi |
Greenwood (MO) | Greenwood, MO | 113.5 GWh | 30.1 mi |
Hawthorn | Kansas City, MO | 2.5 TWh | 12.1 mi |
Iatan | Weston, MO | 5.1 TWh | 24.5 mi |
Independence II Solar Farm | Independence, MO | 16.2 GWh | 24.6 mi |
Independence Solar Farm | Independence, MO | 5.8 GWh | 22.2 mi |
Jackson Square | Independence, MO | 2.0 GWh | 16.1 mi |
Kansas River Project | Lawrence, KS | 14.2 GWh | 31.8 mi |
Lawrence Energy Center | Lawrence, KS | 1.9 TWh | 32.6 mi |
Northeast (MO) | Kansas City, MO | 13.1 GWh | 8 mi |
Quindaro | Kansas, KS | 10.9 GWh | 3.4 mi |
Ralph Green | Pleasant Hill, MO | 24.9 GWh | 34.6 mi |
South Harper | Kansas City, MO | 216.6 GWh | 35.6 mi |
St Joseph Landfill Generating Station | St Joseph, MO | 9.8 GWh | 35.2 mi |
Station H | Independence, MO | 2.7 GWh | 17.5 mi |
Station I | Independence, MO | 3.1 GWh | 18.1 mi |
West Gardner | Johnson, KS | 181.6 GWh | 30.5 mi |