Cabot Holyoke

102 Cabot Street, Holyoke, MA 1040

Plant Summary Information

Cabot Holyoke is ranked #22 out of 26 hydroelectric power plants in Massachusetts in terms of total annual net electricity generation.

Cabot Holyoke is comprised of 4 generators and generated 523.0 MWh during the 3-month period between September 2024 to December 2024.

Plant NameCabot Holyoke
Utility NameCity of Holyoke Gas and Electric Dept.
LocationHampden County, MA
Initial Operation DateJanuary 1893
Last Update Dec 2024
Annual Generation 4.4 GWh
Annual Consumption 16.9 k MMBtu
Ranked #8,249 out of 12,332 Power Plants Nationwide
Ranked #1,113 out of 1,256 Water Power Plants Nationwide
Ranked #256 out of 623 Massachusetts Power Plants
Ranked #22 out of 26 Massachusetts Water Power Plants
Fuel Types Water

Map of Cabot Holyoke

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cabot Holyoke.

Create Your Account Today

Monthly Net Generation for Cabot Holyoke

Monthly Plant Fuel Consumption for Cabot Holyoke

Cabot Holyoke Details

Summary Information
Plant NameCabot Holyoke (9864)
Plant Address102 Cabot Street, Holyoke, MA 1040
UtilityCity of Holyoke Gas and Electric Dept. (8776)
Latitude, Longitude42.2, -72.61
Generation Dates on FileJan 2001 to Dec 2024
Initial Operation DateJanuary 1893
Annual Generation 4.4 GWh
Fuel Types Water
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionNPCC
Balancing AuthorityISO New England Inc. (ISNE)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water SourceConnecticut River
Ash Impoundment No
Transmission / Distribution OwnerCity of Holyoke - (MA) (8774) MA
Grid Voltage 4.80 kV
Energy StorageNo

Generator 1 Details Operating January 1893

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.8 MW
Nameplate Power Factor0.8
Summer Capacity0.6 MW
Winter Capacity0.6 MW
Minimum Load0.6 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1893
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M

Generator 4 Details Operating January 1907

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.6 MW
Nameplate Power Factor0.8
Summer Capacity0.5 MW
Winter Capacity0.5 MW
Minimum Load0.4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1907
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M

Generator 2 Details Operating January 1938

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.8 MW
Nameplate Power Factor0.8
Summer Capacity0.6 MW
Winter Capacity0.6 MW
Minimum Load0.4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1938
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M

Generator 3 Details Operating January 1939

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.4 MW
Nameplate Power Factor0.8
Summer Capacity0.4 MW
Winter Capacity0.4 MW
Minimum Load0.3 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1939
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M

Cabot Holyoke Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Water.

RankPlant NamePlant LocationAnnual Generation
#1103North Gooding Main HydroGooding, ID4.6 GWh
#1104Marys LakeEstes Park, CO4.5 GWh
#1105Head of U Canal Hydro ProjectJerome, ID4.5 GWh
#1106Franklin (NC)Franklin, NC4.5 GWh
#1107Piedmont Hydro Power ProjectPiedmont, SC4.5 GWh
#1108Last ChanceGrace, ID4.5 GWh
#1109Metropolitan Sewerage DistrictAsheville, NC4.5 GWh
#1110Chasm Hydro PartnershipChateaugay, NY4.4 GWh
#1111Blind Canyon HydroWendell, ID4.4 GWh
#1112Dunlap TP 1New Brannfels, TX4.4 GWh
#1114Theresa PlantTheresa, NY4.4 GWh
#1115Hiilangaay HydroHydaburg, AK4.4 GWh
#1116Scott FlatNevada City, CA4.4 GWh
#1117La GrangeLa Grange, CA4.4 GWh
#1118MerrillMerrill, WI4.3 GWh
#1119TacomaDurango, CO4.3 GWh
#1120Texon Hydroelectric ProjectRussell, MA4.3 GWh
#1121GardinerGardiner, ME4.3 GWh
#1122Benton Falls AssociatesBenton, ME4.3 GWh
#1123Mora Drop Hydroelectric ProjectKuna, ID4.3 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Cabot Holyoke.

Plant NamePlant LocationAnnual GenerationDistance
Ameresco Chicopee EnergyChicopee, MA9.5 GWh4.6 mi
BoatlockHolyoke, MA18.9 GWh0.7 mi
CED Chicopee SolarChicopee, MA4.8 GWh3 mi
ChemicalHolyoke, MA5.5 GWh0.6 mi
Chicopee Granby Road SolarChicopee, MA2.2 GWh3 mi
Chicopee River SolarSpringfield, MA3.1 GWh4.5 mi
Chicopee SolarChicopee, MA4.6 GWh1.7 mi
DwightChicopee, MA6.3 GWh3.5 mi
East Springfield Solar PVSpringfield, MA2.0 GWh5.2 mi
Easthampton CSGEasthampton, MA3.6 GWh4.9 mi
Front StreetChicopee, MA497.0 MWh3.7 mi
Granby LFGGranby, MA3.1 GWh3.7 mi
Granby Solar, LLC CSGGranby, MA6.1 GWh4.9 mi
Hadley FallsHolyoke, MA151.1 GWh0.9 mi
Holyoke Solar Cooperative at MuellerHolyoke, MA3.8 GWh3.8 mi
Mt. Tom Solar Project HybridHolyoke, MA4.2 GWh4.8 mi
Riverside HolyokeHolyoke, MA38.4 GWh0.8 mi
Smith & Wesson at Springfield MA PVSpringfield, MA2.4 GWh5.2 mi
Southampton Solar PVSouthampton, MA3.1 GWh5.1 mi
Stony BrookLudlow, MA177.4 GWh5.1 mi