Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Green Meadows | Altus Power America Management, LLC | Sandwich, MA | ISO New England (ISNE) | 5.1 GWh | Apr 2014 | Dec 2024 | Solar |
| Long John CSG | Long John Solar, LLC | Sandwich, IL | PJM Interconnection, LLC (PJM) | 3.5 GWh | Apr 2021 | Dec 2024 | Solar |
| Pine Road Solar, LLC CSG | Pine Road Solar, LLC | Sandwich, IL | PJM Interconnection, LLC (PJM) | 4.0 GWh | Mar 2021 | Dec 2024 | Solar |
| Ameresco Delaware Central | AMERESCO Delaware Central | Sandtown, DE | PJM Interconnection, LLC (PJM) | 23.3 GWh | Nov 2006 | Dec 2024 | Landfill Gas |
| Marion Solar 4b LLC | Pivot Energy | Sandoval, IL | Midcontinent Independent System Operator, Inc. (MISO) | 970.0 MWh | Apr 2024 | Dec 2024 | Solar |
| Washington County Solar | Washington County Solar, LLC | Sandersville, GA | Southern Company Services, Inc. - Trans (SOCO) | 322.6 GWh | Aug 2024 | Sep 2025 | Solar |
| Washington County Power LLC | CAMS (Georgia) Washington County Power | Sandersville, GA | Southern Company Services, Inc. - Trans (SOCO) | 172.4 GWh | May 2003 | Dec 2024 | Natural Gas |
| Keystone Dam | USCE-Tulsa District | Sand Springs, OK | Southwest Power Pool (SWPP) | 92.0 GWh | Apr 1968 | Feb 2024 | Water |
| Tulsa LFG LLC | Tulsa LFG LLC | Sand Springs, OK | Southwest Power Pool (SWPP) | 17.2 GWh | Apr 2011 | Dec 2024 | Landfill Gas |
| Sand Point | Sand Point Generating, LLC | Sand Point, AK | 3.6 GWh | Nov 2000 | Dec 2024 | Distillate Fuel Oil | |
| Wheatfield | CVE US EI3 Wheatfield LLC | Sanborn, NY | New York Independent System Operator (NYIS) | 6.2 GWh | Nov 2023 | Dec 2024 | Solar |
| Limerick | Constellation Nuclear | Sanatoga, PA | PJM Interconnection, LLC (PJM) | 19.4 TWh | Jan 1986 | Sep 2025 | Nuclear |
| Reloj del Sol Wind Farm | Reloj del Sol Wind Farm LLC | San Ygnacio, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 589.6 GWh | Apr 2021 | Sep 2025 | Wind |
| Bishop Ranch BR 1-X | Bollinger Canyon Road BR 1-X Solar Project 2020 | San Ramon, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2022 | Dec 2024 | Solar |
| Bishop Ranch - BR 1-Y | Distributed Solar Development, LLC | San Ramon, CA | California Independent System Operator (CISO) | 1.7 GWh | Feb 2022 | Dec 2024 | Solar |
| Dunns Bridge II Solar | Dunns Bridge II Solar and Storage Generation LLC | San Pierre, IN | Midcontinent Independent System Operator, Inc. (MISO) | 670.9 GWh | - | Sep 2025 | Solar |
| El Sauz Ranch Wind, LLC | El Sauz Ranch Wind, LLC | San Perlita, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 636.3 GWh | - | Sep 2025 | Wind |
| Magic Valley Wind Farm I LLC | Big Sky Wind, LLC | San Perlita, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 480.2 GWh | Aug 2012 | Sep 2025 | Wind |
| Westmont 300B | Altus Power America Management, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 5.1 GWh | Nov 2016 | Dec 2024 | Solar |
| Westmont 401 | Altus Power America Management, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 4.3 GWh | Oct 2017 | Dec 2024 | Solar |
| Port of LA Solar FiT Project | Los Angeles Department of Water & Power | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 1.5 GWh | Sep 2015 | Dec 2024 | Solar |
| Westmont 301 | Altus Power America Management, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 2.9 GWh | Oct 2017 | Dec 2024 | Solar |
| Westmont 300A | Altus Power America Management, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 5.0 GWh | Feb 2017 | Dec 2024 | Solar |
| Alta Sea | Signal Street Operating, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 3.0 GWh | Nov 2023 | Dec 2024 | Solar |
| Catalina Express | Altus Power America Management, LLC | San Pedro, CA | California Independent System Operator (CISO) | 1.7 GWh | Nov 2020 | Dec 2024 | Solar |
| Marina South | Altus Power America Management, LLC | San Pedro, CA | California Independent System Operator (CISO) | 1.8 GWh | Nov 2020 | Dec 2024 | Solar |
| Tupelo Solar | FRP Tupelo Solar, LLC | San Mateo, FL | Florida Power & Light Co. (FPL) | 181.8 GWh | Oct 2024 | Sep 2025 | Solar |
| Franklin Templeton San Mateo | Bloom Energy | San Mateo, CA | California Independent System Operator (CISO) | 9.3 GWh | Oct 2011 | Dec 2024 | Natural Gas |
| Hays Energy Project | Hays Energy, LLC | San Marcos, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 5.2 TWh | Mar 2002 | Sep 2025 | Natural Gas |
| SDCWA - Twin Oaks | CleanCapital Holdings | San Marcos, CA | California Independent System Operator (CISO) | 1.3 GWh | Apr 2011 | Dec 2024 | Solar |
| Vallecitos Water District | SSA Solar of CA 5, LLC | San Marcos, CA | California Independent System Operator (CISO) | 3.2 GWh | Aug 2021 | Dec 2024 | Solar |
| Camp San Luis Obispo | Ecoplexus, Inc | San Luis Obispo, CA | California Independent System Operator (CISO) | 158.0 MWh | Jul 2024 | Nov 2024 | Solar |
| CA-DGS-California Men's Colony | Forefront Power, LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 4.6 GWh | Apr 2023 | Dec 2024 | Solar |
| Stenner Creek Solar | Stenner Creek Solar LLC | San Luis Obispo, CA | California Independent System Operator (CISO) | 9.5 GWh | Apr 2018 | Dec 2024 | Solar |
| Cold Canyon 1 | Toro Energy of California SLO | San Luis Obispo, CA | California Independent System Operator (CISO) | 3.8 GWh | Jun 2013 | Dec 2024 | Landfill Gas |
| Preferred Freezer San Leandro | Powerflex | San Leandro, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2017 | Dec 2023 | Solar |
| KSR028 Merced Fuel Cell | 2016 ESA Project Company, LLC | San Leandro, CA | California Independent System Operator (CISO) | 15.7 GWh | Mar 2018 | Dec 2024 | Natural Gas |
| HEB00038 | Texas Microgrid, LLC | San Juan, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 244.0 MWh | Mar 2018 | Dec 2024 | Natural Gas |
| Beckton Dickenson - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 5.4 GWh | Jun 2016 | Jul 2024 | Natural Gas |
| SCC - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 7.5 GWh | Feb 2014 | Dec 2024 | Natural Gas |
| CSU San Jose State University | SkyHigh 2 Solar | San Jose, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2021 | Dec 2024 | Solar |
| EQX015 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 30.6 GWh | Dec 2017 | Dec 2024 | Natural Gas |
| EQX010 Great Oaks Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 19.6 GWh | Aug 2019 | Dec 2024 | Natural Gas |
| Metcalf Energy Center | Calpine Corp - Metcalf Energy Center | San Jose, CA | California Independent System Operator (CISO) | 2.5 TWh | May 2005 | Sep 2025 | Natural Gas |
| Los Esteros Critical Energy Center | Los Esteros Critical Energy Facility LLC | San Jose, CA | California Independent System Operator (CISO) | 170.4 GWh | Jan 2003 | Sep 2025 | Natural Gas |
| SJ/SC WPCP | San Jose/Santa Clara Water P C | San Jose, CA | California Independent System Operator (CISO) | 83.5 GWh | Jan 1953 | Sep 2025 | Natural Gas : 51.6% Other Biomass Gas : 48.3% |
| San Jose Cogeneration | San Jose State University Fclts Dev &Ops | San Jose, CA | California Independent System Operator (CISO) | 34.5 GWh | Nov 1984 | Sep 2025 | Natural Gas |
| Agnews Power Plant | OLS Energy-Agnews Inc. | San Jose, CA | California Independent System Operator (CISO) | 10.3 GWh | Oct 1990 | Dec 2024 | Natural Gas |
| Hellyer Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 3.6 GWh | Jul 2017 | Dec 2023 | Solar |
| Guadalupe Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 1.9 GWh | Aug 2018 | Dec 2024 | Solar |
| Equinix Great Oaks Blvd. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 30.9 GWh | Nov 2017 | Dec 2024 | Natural Gas |
| Malech Solar Farm | County of Santa Clara (CA) | San Jose, CA | California Independent System Operator (CISO) | 4.8 GWh | Sep 2017 | Dec 2024 | Solar |
| Equinix Lundy Ave. Fuel Cell | 2016 ESA Project Company, LLC | San Jose, CA | California Independent System Operator (CISO) | 26.3 GWh | Aug 2017 | Dec 2024 | Natural Gas |
| Micro Santa Clara | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.6 GWh | Jun 2018 | Dec 2024 | Natural Gas |
| Kellogg's - San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 6.6 GWh | Aug 2013 | Dec 2024 | Natural Gas |
| Equinix San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 16.4 GWh | Oct 2015 | Dec 2024 | Natural Gas |
| Zero Waste Energy Development Co LLC | Zero Waste Energy Development Company LLC | San Jose, CA | California Independent System Operator (CISO) | 1.8 GWh | Jan 2015 | Dec 2024 | Other Biomass Gas |
| Maxim | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 6.0 GWh | Jul 2014 | Dec 2024 | Natural Gas |
| Extreme Via Del Oro | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.0 GWh | Feb 2019 | Mar 2024 | Natural Gas |
| Extreme San Ignacio | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 5.6 GWh | Apr 2019 | Jun 2024 | Natural Gas |
| Xilinx San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.3 GWh | Jan 2012 | Dec 2024 | Natural Gas |
| AT&T Holger | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 1.3 GWh | May 2016 | Dec 2024 | Natural Gas |
| Caprock Solar 1 LLC | Duke Energy Renewables Services | San Jon, NM | Southwest Power Pool (SWPP) | 59.5 GWh | Nov 2016 | Sep 2025 | Solar |
| Caprock Wind Farm | Leeward Asset Management, LLC | San Jon, NM | Southwest Power Pool (SWPP) | 279.0 GWh | Nov 2004 | Sep 2024 | Wind |
| Fresno Cogen Partners | Wellhead Services, Inc | San Joaquin, CA | California Independent System Operator (CISO) | 2.4 GWh | Dec 1989 | Dec 2024 | Natural Gas |
| Teichert Materials-Teichert Vernalis | Foundation HA Energy Generation, LLC | San Joaquin, CA | California Independent System Operator (CISO) | 1.9 GWh | Sep 2010 | Dec 2024 | Wind |
| Crystal Farms Local Solar | Crystal Farms Local Solar, LLC | San Joaquin, CA | California Independent System Operator (CISO) | 10.1 GWh | Oct 2023 | Dec 2024 | Solar |
| Fresno Solar | Wellhead Services, Inc | San Joaquin, CA | California Independent System Operator (CISO) | 4.7 GWh | Sep 2015 | Dec 2024 | Solar |
| Soboba Community Solar Project | Soboba Band of Luiseno Indians | San Jacinto, CA | California Independent System Operator (CISO) | 3.4 GWh | Jul 2016 | Dec 2024 | Solar |
| EMWD - San Jacinto RES BCT | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 3.0 GWh | Apr 2022 | Dec 2024 | Solar |
| EMWD - San Jacinto RWRF NEM | SkyHigh 2 Solar | San Jacinto, CA | California Independent System Operator (CISO) | 10.2 GWh | Jun 2021 | Dec 2024 | Solar |
| Sunset Reservoir North Basin | Duke Energy Renewables Services | San Francisco, CA | California Independent System Operator (CISO) | 6.5 GWh | Aug 2010 | Dec 2024 | Solar |
| Univ of San Francisco Cogen | University of San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 5.2 GWh | Aug 1987 | Dec 2024 | Natural Gas |
| One Market Plaza | Paramount Group Inc | San Francisco, CA | California Independent System Operator (CISO) | 177.0 MWh | Nov 2003 | Dec 2024 | Natural Gas |
| Transamerica Pyramid | Transamerica Pyramid Properties LLC | San Francisco, CA | California Independent System Operator (CISO) | 525.0 MWh | Jun 2007 | Dec 2023 | Natural Gas |
| Parnassus Central Utility Plant | University of California-San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 67.6 GWh | Dec 1995 | Sep 2025 | Natural Gas |
| SF Southeast Cogen Plant | City & County of San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 3.9 GWh | May 2002 | Dec 2024 | Other Biomass Gas |
| Route 66 Energy Center, LLC | Route 66 Energy Center, LLC | San Fidel, NM | Public Service Company of New Mexico (PNM) | 138.2 GWh | Apr 2022 | Sep 2025 | Solar |
| CFW Solar X LLC - Vaughn | Valta Energy | San Fernando, CA | Los Angeles Department of Water and Power (LDWP) | 642.0 MWh | Nov 2018 | Dec 2024 | Solar |
| San Dimas Wash Generating Station | San Gabriel Valley Mun Wtr Dt | San Dimas, CA | California Independent System Operator (CISO) | 4.8 GWh | Feb 1986 | Jun 2024 | Water |
| San Diego State University | San Diego State University | San Diego, CA | California Independent System Operator (CISO) | 52.4 GWh | Aug 2002 | Sep 2025 | Natural Gas : 97.6% Solar : 2.4% |
| Childrens Hospital | DTE San Diego COGEN Inc. | San Diego, CA | California Independent System Operator (CISO) | 25.3 GWh | Mar 2000 | Sep 2025 | Natural Gas |
| Kyocera International Inc.(San Diego) | Kyocera International, Inc | San Diego, CA | California Independent System Operator (CISO) | 9.1 GWh | Aug 2012 | Dec 2024 | Natural Gas |
| Gas Utilization Facility | City of San Diego | San Diego, CA | California Independent System Operator (CISO) | 30.7 GWh | May 1985 | Sep 2025 | Other Biomass Gas |
| Otay Mesa Generating Project | Otay Mesa Energy Center LLC | San Diego, CA | California Independent System Operator (CISO) | 1.8 TWh | Sep 2009 | Sep 2025 | Natural Gas |
| Naval Hospital Medical Center | Department of the Navy | San Diego, CA | California Independent System Operator (CISO) | 16.2 GWh | Nov 2003 | Sep 2025 | Natural Gas |
| MM San Diego-Miramar | MM San Diego Energy-Miramar | San Diego, CA | California Independent System Operator (CISO) | 46.1 GWh | Jun 1997 | Dec 2024 | Landfill Gas : 91.9% Other Biomass Gas : 8.1% |
| CP Kelco San Diego Plant | CP Kelco US Inc. | San Diego, CA | California Independent System Operator (CISO) | 71.3 GWh | Sep 1983 | Sep 2025 | Natural Gas |
| Pio Pico Energy Center | Pio Pico Energy Center LLC | San Diego, CA | California Independent System Operator (CISO) | 65.9 GWh | Oct 2016 | Dec 2024 | Natural Gas |
| Watkins Manufacturing Co. | Watkins Manufacturing Corporation | San Diego, CA | California Independent System Operator (CISO) | 7.4 GWh | Oct 2001 | Sep 2025 | Natural Gas |
| Border Hybrid Energy Center | CalPeak Power, LLC | San Diego, CA | California Independent System Operator (CISO) | 14.8 GWh | Oct 2001 | Dec 2024 | Natural Gas |
| Larkspur Energy Facility | Diamond Generating Corporation | San Diego, CA | California Independent System Operator (CISO) | 24.4 GWh | Jun 2001 | Dec 2024 | Natural Gas |
| Miramar Energy Facility | San Diego Gas & Electric Co | San Diego, CA | California Independent System Operator (CISO) | 8.2 GWh | May 2005 | Sep 2025 | Natural Gas |
| San Diego - EMDF at San Diego | California PV Energy 3, LLC | San Diego, CA | California Independent System Operator (CISO) | 4.7 GWh | Mar 2021 | Dec 2024 | Solar |
| County of San Diego COC Hybrid | Solar Star California LXXVIII, LLC | San Diego, CA | California Independent System Operator (CISO) | 3.1 GWh | Jun 2020 | Dec 2024 | Solar |
| University of San Diego | Bloom Energy 2009 PPA | San Diego, CA | California Independent System Operator (CISO) | 8.2 GWh | Nov 2016 | Dec 2024 | Natural Gas |
| AT&T San Diego | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 3.5 GWh | Feb 2015 | Dec 2023 | Natural Gas |
| CA - DGS RFP - RJ Donovan State Prison | Forefront Power, LLC | San Diego, CA | California Independent System Operator (CISO) | 5.1 GWh | Dec 2023 | Dec 2024 | Solar |
| AT&T - San Diego Trade Street | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 6.4 GWh | Feb 2016 | Dec 2024 | Natural Gas |
| San Diego Community College | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 8.3 GWh | Feb 2020 | Dec 2024 | Natural Gas |
Summary of Power Plants By State
Figures are based on September 2025 generation numbers.| State | Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Alabama | # 7 | 76 | 12,052.47 GWh |
| Alaska | # 48 | 147 | 527.57 GWh |
| Arizona | # 9 | 183 | 11,602.92 GWh |
| Arkansas | # 21 | 117 | 5,844.09 GWh |
| California | # 4 | 1,769 | 19,371.91 GWh |
| Colorado | # 30 | 304 | 4,433.17 GWh |
| Connecticut | # 32 | 168 | 3,779.74 GWh |
| Delaware | # 49 | 33 | 419.31 GWh |
| District of Columbia | # 51 | 16 | 16.99 GWh |
| Florida | # 2 | 323 | 24,446.09 GWh |
| Georgia | # 8 | 266 | 11,628.97 GWh |
| Hawaii | # 47 | 73 | 826.54 GWh |
| Idaho | # 44 | 148 | 1,495.33 GWh |
| Illinois | # 5 | 385 | 14,642.93 GWh |
| Indiana | # 14 | 213 | 8,730.35 GWh |
| Iowa | # 26 | 295 | 5,224.35 GWh |
| Kansas | # 25 | 189 | 5,250.86 GWh |
| Kentucky | # 23 | 60 | 5,806.86 GWh |
| Louisiana | # 13 | 87 | 9,343.34 GWh |
| Maine | # 45 | 217 | 1,135.36 GWh |
| Maryland | # 39 | 204 | 2,935.42 GWh |
| Massachusetts | # 41 | 652 | 1,746.92 GWh |
| Michigan | # 11 | 279 | 10,468.02 GWh |
| Minnesota | # 29 | 769 | 4,717.95 GWh |
| Mississippi | # 20 | 58 | 6,625.37 GWh |
| Missouri | # 22 | 128 | 5,843.17 GWh |
| State | Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Montana | # 40 | 72 | 1,949.24 GWh |
| Nebraska | # 34 | 132 | 3,501.38 GWh |
| Nevada | # 31 | 114 | 4,053.88 GWh |
| New Hampshire | # 42 | 60 | 1,549.07 GWh |
| New Jersey | # 27 | 399 | 4,969.45 GWh |
| New Mexico | # 36 | 145 | 3,317.84 GWh |
| New York | # 12 | 966 | 10,145.62 GWh |
| North Carolina | # 10 | 917 | 11,211.15 GWh |
| North Dakota | # 37 | 60 | 3,089.17 GWh |
| Ohio | # 6 | 201 | 12,818.31 GWh |
| Oklahoma | # 17 | 143 | 7,364.05 GWh |
| Oregon | # 28 | 282 | 4,812.51 GWh |
| Pennsylvania | # 3 | 260 | 19,731.43 GWh |
| Rhode Island | # 46 | 100 | 863.62 GWh |
| South Carolina | # 16 | 207 | 7,861.23 GWh |
| South Dakota | # 43 | 52 | 1,535.17 GWh |
| Tennessee | # 19 | 88 | 6,829.06 GWh |
| Texas | # 1 | 946 | 51,969.48 GWh |
| Utah | # 35 | 126 | 3,419.48 GWh |
| Vermont | # 50 | 120 | 165.14 GWh |
| Virginia | # 15 | 241 | 8,580.52 GWh |
| Washington | # 18 | 138 | 7,120.43 GWh |
| West Virginia | # 38 | 39 | 3,057.29 GWh |
| Wisconsin | # 24 | 251 | 5,674.74 GWh |
| Wyoming | # 33 | 73 | 3,641.70 GWh |