Baffin Wind
581 S Highway 77, Sarita, TX 78385Plant Summary Information
Baffin Wind is ranked #172 out of 226 wind farms in Texas in terms of total annual net electricity generation.
Baffin Wind generated 46.6 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Baffin Wind |
|---|---|
| Utility Name | Avangrid Power LLC |
| Location | Kenedy County, TX |
| Initial Operation Date | December 2014 |
| Last Update | Dec 2024 |
| Annual Generation | 276.6 GWh |
| Annual Consumption | 1.0 M MMBtu |
| Ranked #2,062 out of 12,553 Power Plants Nationwide | |
| Ranked #617 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #389 out of 804 Texas Power Plants | |
| Ranked #172 out of 226 Texas Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operators |
Iberdrola Renewables Inc (2013 to 2014) Avangrid Renewables Inc (2015 to 2015) Avangrid Renewables LLC (2016 to 2023) Avangrid Power LLC (2024 to 2024) |
Map of Baffin Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Baffin Wind.
Monthly Net Generation for Baffin Wind
Baffin Wind Details
| Summary Information | |
|---|---|
| Plant Name | Baffin Wind (57927) |
| Plant Address | 581 S Highway 77, Sarita, TX 78385 |
| Utility | Avangrid Power LLC (15399) |
| Latitude, Longitude | 27.18465, -97.59818 |
| Generation Dates on File | Feb 2015 to Dec 2024 |
| Initial Operation Date | December 2014 |
| Annual Generation | 276.6 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Electric Transmission Texas LLC (50174) |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator 1 Details Operating December 2014
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 188 MW |
| Summer Capacity | 188 MW |
| Winter Capacity | 188 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2014 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 101 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 101 |
|---|---|
| Predominant Turbine Manufacturer | Gamesa |
| Predominant Turbine Model Number | G97-2.0 |
| Design Wind Speed | 15.7 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 295 |
Baffin Wind Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #607 | Elkhorn Valley Wind Farm | Union, OR | 282.9 GWh |
| #608 | New Creek Wind | New Creek, WV | 282.2 GWh |
| #609 | Caprock Wind Farm | San Jon, NM | 279.0 GWh |
| #610 | Shiloh IV Wind Project LLC | Birds Landing, CA | 278.3 GWh |
| #611 | Lone Tree Wind, LLC | Tiskilwa, IL | 278.3 GWh |
| #612 | Rail Splitter Wind Farm | Hopedale, IL | 278.1 GWh |
| #613 | Sagebrush Power Partners | Ellensburg, WA | 277.8 GWh |
| #614 | Green Pastures Wind I | Seymour, TX | 277.5 GWh |
| #615 | Prairie Breeze II | Elgin, NE | 277.4 GWh |
| #616 | Brookfield Tehachapi 1 | Mojave, CA | 276.9 GWh |
| #618 | Kossuth County Wind | Lu Verne, IA | 275.7 GWh |
| #619 | Goodnoe Hills | Goldendale, WA | 275.5 GWh |
| #620 | Leaning Juniper | Arlington, OR | 275.2 GWh |
| #621 | Charles City Wind Farm | Charles City, IA | 274.1 GWh |
| #622 | High Plains | Rock River, WY | 274.1 GWh |
| #623 | Twin Ridges Wind Farm | Meyersdale, PA | 273.9 GWh |
| #624 | Vantage Wind Energy LLC | Ellensburg, WA | 273.2 GWh |
| #625 | Pioneer Wind Park, LLC | Glenrock, WY | 273.0 GWh |
| #626 | Alta Wind XI | Mojave, CA | 269.5 GWh |
| #627 | Meadow Lake Wind Farm III LLC | Lafayette, IN | 269.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Baffin Wind.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alexis Solar, LLC | Encino, TX | 12.6 GWh | 44.1 mi |
| Barney M Davis | Corpus Christi, TX | 1.5 TWh | 34 mi |
| Bruennings Breeze Wind Farm | Raymondville, TX | 534.1 GWh | 46.1 mi |
| Chapman Ranch Wind I | Corpus Christi, TX | 518.0 GWh | 28.8 mi |
| Corpus Christi | Corpus Christi, TX | 54.6 GWh | 43.3 mi |
| Corpus Christi Energy Center | Corpus Christi, TX | 2.4 TWh | 44.7 mi |
| Corpus Refinery | Corpus Christi, TX | 280.5 GWh | 44.9 mi |
| El Sauz Ranch Wind, LLC | San Perlita, TX | 685.6 GWh | 47.2 mi |
| HEB00057 | Corpus Christi, TX | 266.0 MWh | 38.5 mi |
| HEB00069 | Corpus Christi, TX | 356.0 MWh | 40.8 mi |
| HEBCCBakery | Corpus Christi, TX | 802.0 MWh | 42.4 mi |
| Nueces Bay | Corpus Christi, TX | 1.8 TWh | 45.2 mi |
| Patriot Wind Farm | Bishop, TX | 671.0 GWh | 27.5 mi |
| Pattern Gulf Wind | Armstrong, TX | 750.8 GWh | 12.7 mi |
| Penascal II Wind Project LLC | Sarita, TX | 261.9 GWh | 5 mi |
| Penascal Wind Power LLC | Sarita, TX | 322.5 GWh | 12.8 mi |
| Stella Wind Farm | Armstrong, TX | 583.8 GWh | 17 mi |
| Ticona Polymers Inc | Bishop, TX | 264.7 GWh | 30 mi |
| Valero Refinery Corpus Christi West | Corpus Christi, TX | 82.5 GWh | 44.3 mi |
| WAL791 | Alice, TX | 292.0 MWh | 48.7 mi |