21545 W Cannonsville Road, Pierson, MI 49339Plant Summary Information
Central Generating is ranked #16 out of 22 landfill gas power plants in Michigan in terms of total annual net electricity generation.
Central Generating is comprised of 3 generators and generated 3.1 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Central Generating |
|---|---|
| Utility Name | North American Central - LLC |
| Location | Montcalm County, MI |
| Initial Operation Date | September 2018 |
| Last Update | Dec 2025 |
| Annual Generation | 12.9 GWh |
| Annual Consumption | 173.2 k MMBtu |
| Ranked #5,876 out of 13,081 Power Plants Nationwide | |
| Ranked #174 out of 281 Landfill Gas Power Plants Nationwide | |
| Ranked #174 out of 269 Michigan Power Plants | |
| Ranked #16 out of 22 Michigan Landfill Gas Power Plants | |
| Fuel Types | Landfill Gas |
Map of Central Generating
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Central Generating.
Monthly Net Generation for Central Generating
Monthly Plant Fuel Consumption for Central Generating
Central Generating Details
| Summary Information | |
|---|---|
| Plant Name | Central Generating (63977) |
| Plant Address | 21545 W Cannonsville Road, Pierson, MI 49339 |
| Utility | North American Central - LLC (63632) |
| Latitude, Longitude | 43.33349, -85.50601 |
| Generation Dates on File | Jan 2020 to Dec 2025 |
| Initial Operation Date | September 2018 |
| Annual Generation | 12.9 GWh |
| Fuel Types | Landfill Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF17-932-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Consumers Energy Co (4254) MI |
| Grid Voltage | 416.00 kV |
| Energy Storage | No |
Generator 1 Details Operating September 2018
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 1.6 MW |
| Winter Capacity | 1.6 MW |
| Minimum Load | 1.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | September 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 2 Details Operating September 2018
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | September 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator 3 Details Operating August 2020
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 1.6 MW |
| Winter Capacity | 1.6 MW |
| Minimum Load | 1.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | August 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Central Generating Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #164 | Ameresco Santa Cruz Energy | Watsonville, CA | 13.8 GWh |
| #165 | Greater New Bedford LFG Utiliz. Facility | New Bedford, MA | 13.4 GWh |
| #166 | Lanchester Generating Station | Narvon, PA | 13.4 GWh |
| #167 | CID Gas Recovery | Calumet City, IL | 13.3 GWh |
| #168 | Nashua Plant | Nashua, NH | 13.1 GWh |
| #169 | Wicomico | Salisbury, MD | 14.0 GWh |
| #170 | Rochelle Energy Center | Rochelle, IL | 13.1 GWh |
| #171 | Finley Buttes Landfill Gas | Boardman, OR | 13.0 GWh |
| #172 | I 95 Landfill Phase II | Lorton, VA | 12.9 GWh |
| #173 | Woodland Landfill Gas Recovery | South Elgin, IL | 12.9 GWh |
| #175 | G2 Energy Hay Rd | Vacaville, CA | 12.8 GWh |
| #176 | Venice Resources Gas Recovery | Lennon, MI | 12.7 GWh |
| #177 | Salt Lake Energy Systems | Salt Lake City, UT | 12.7 GWh |
| #178 | Bannock County LFG to Energy | Pocatello, ID | 12.6 GWh |
| #179 | Frederick County LFGTE Facility | Winchester, VA | 12.2 GWh |
| #180 | MMSD Jones Island Wastewater | Milwaukee, WI | 83.3 GWh |
| #181 | Lee County Landfill | Bishopville, SC | 11.8 GWh |
| #182 | ADS Renewable Energy-Wolf Creek LLC | Dry Branch, GA | 11.8 GWh |
| #183 | Berlin Landfill Gas | Berlin, WI | 11.6 GWh |
| #184 | Waxdale | Sturtevant, WI | 37.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Central Generating.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ada Cogeneration LP | Ada, MI | 184.9 GWh | 25.6 mi |
| Ada Dam | Ada, MI | 1.7 GWh | 26.5 mi |
| Bissell Solar and Battery Generator | Grand Rapids, MI | 1.1 GWh | 25.1 mi |
| Byrne Solar, LLC | Lowell, MI | 10.3 GWh | 20.8 mi |
| Cascade Dam (MI) | Grand Rapids, MI | 3.9 GWh | 29.3 mi |
| Chatham | Lowell, MI | 103.0 MWh | 28.7 mi |
| Coopersville | Coopersville, MI | 37.9 GWh | 30.1 mi |
| Croton | Newaygo, MI | 29.5 GWh | 10.7 mi |
| Fish Creek Solar Park | Greenville, MI | 48.8 GWh | 28.9 mi |
| Fremont Community Digester, LLC | Newaygo, MI | 375.0 MWh | 25.2 mi |
| George Johnson | Hersey, MI | 42.7 GWh | 35.2 mi |
| Grand Valley Solar Gardens | Allendale, MI | 4.3 GWh | 33 mi |
| Gratiot Farms Wind Project | Carson City, MI | 332.9 GWh | 34.2 mi |
| Hardy | Newaygo, MI | 64.9 GWh | 12.3 mi |
| Hazel Solar, LLC | Howard City, MI | 4.1 GWh | 5.4 mi |
| Kent County Waste to Energy Facility | Grand Rapids, MI | 94.0 GWh | 28.2 mi |
| Muskegon Solar | Muskegon, MI | 117.1 GWh | 25.5 mi |
| Renaissance Power Plant | Carson City, MI | 1.3 TWh | 34.9 mi |
| Rogers | Big Rapids, MI | 20.9 GWh | 19.4 mi |
| Vestaburg | Vestaburg, MI | 4.4 GWh | 30.1 mi |