Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Dodson Creek Solar, LLC | Geronimo Power | Highland County, OH | 166.0 GWh | - | Dec 2025 | Solar | |
| Dillingham | Nushagak Electric Coop, Inc | Dillingham, AK | 17.9 GWh | Apr 1988 | Dec 2024 | Distillate Fuel Oil | |
| Dutch Harbor | City of Unalaska - (AK) | Dutch Harbor, AK | 37.6 GWh | Oct 1989 | Dec 2025 | Distillate Fuel Oil | |
| Delta Wind Farm | Alaska Environmental Power | Delta Junction, AK | (NA) | 3.9 GWh | Aug 2008 | Dec 2024 | Wind |
| Douglas | Arizona Public Service Co | Douglas, AZ | Arizona Public Service Company (AZPS) | 93.0 MWh | Apr 1972 | Dec 2024 | Distillate Fuel Oil |
| Desert Star Hybrid | Arizona Public Service Co | Buckeye, AZ | Arizona Public Service Company (AZPS) | 29.2 GWh | Aug 2015 | Dec 2024 | Solar |
| Dell Power Station | Associated Electric Coop, Inc | Dell, AR | Associated Electric Cooperative, Inc. (AECI) | 3.9 TWh | Jul 2007 | Dec 2024 | Natural Gas : 99.5% |
| Daybreak Solar | Avangrid Power LLC | Maupin, OR | Avangrid Renewables, LLC (AVRN) | 314.6 GWh | - | Dec 2025 | Solar |
| Dept of General Services -FTB | California PV Energy 2, LLC | Sacramento, CA | Balancing Authority of Northern California (BANC) | 5.1 GWh | Jun 2017 | Dec 2024 | Solar |
| Department of Justice | Ecoplexus, Inc | Sacramento, CA | Balancing Authority of Northern California (BANC) | 3.9 GWh | Mar 2020 | Dec 2024 | Solar |
| Depot Park Solar System | Depot Park Solar Farm | Sacramento, CA | Balancing Authority of Northern California (BANC) | 3.2 GWh | Nov 2010 | Dec 2024 | Solar |
| Darrington | Hampton Lumber Mills - Washington Inc | Darrington, WA | Bonneville Power Administration (BPAT) | 17.0 GWh | Jan 2007 | Dec 2024 | Wood/Wood Waste Solids |
| Dworshak | USACE Northwestern Division | Ahsahka, ID | Bonneville Power Administration (BPAT) | 1.4 TWh | Aug 1974 | Dec 2024 | Water |
| Detroit | USACE Northwestern Division | Mill City, OR | Bonneville Power Administration (BPAT) | 219.7 GWh | Jun 1953 | Dec 2024 | Water |
| Dalles Dam North Fishway Project | Northern Wasco County PUD | The Dalles, OR | Bonneville Power Administration (BPAT) | 44.3 GWh | Apr 1991 | Dec 2024 | Water |
| Dexter | USACE Northwestern Division | Lowell, OR | Bonneville Power Administration (BPAT) | 14.6 GWh | May 1955 | Dec 2024 | Water |
| De Sabla | Pacific Gas & Electric Co. | Magalia, CA | California Independent System Operator (CISO) | 23.0 GWh | Jan 1963 | Dec 2024 | Water |
| Donnells | Oakdale&South San Joaquin Irrigation D. | None, CA | California Independent System Operator (CISO) | 219.2 GWh | May 1957 | Dec 2024 | Water |
| Donald Von Raesfeld Power Plant | City of Santa Clara - (CA) | Santa Clara, CA | California Independent System Operator (CISO) | 771.3 GWh | Feb 2005 | Dec 2025 | Natural Gas |
| Donaghy-Stockton | Donaghy Sales Inc. | Stockton, CA | California Independent System Operator (CISO) | 2.2 GWh | Sep 2021 | Dec 2024 | Solar |
| Dominguez Plant | Eco Services Corp. | Long Beach, CA | California Independent System Operator (CISO) | 13.7 GWh | Jul 1976 | Dec 2023 | Waste Heat |
| Dome Project | Sentinel Peak Resources California, LLC | Fellows, CA | California Independent System Operator (CISO) | 47.5 GWh | Jul 1988 | Dec 2024 | Natural Gas |
| Deadwood Creek | Hydro Sierra Energy, LLC | Dobbins, CA | California Independent System Operator (CISO) | 3.4 GWh | Nov 1993 | May 2024 | Water |
| Double J Dairy Array | Bravo REC Management LLC | Visalia, CA | California Independent System Operator (CISO) | 8.5 GWh | Oct 2023 | Dec 2024 | Solar |
| Dynegy Oakland Power Plant | Dynegy Oakland, LLC | Oakland, CA | California Independent System Operator (CISO) | 2.3 GWh | Oct 1978 | Nov 2025 | Jet Fuel |
| Dixie Valley | Ormat Nevada Inc | Fallon, NV | California Independent System Operator (CISO) | 422.7 GWh | May 1988 | Dec 2025 | Geothermal |
| Dixie Creek Dairy Solar | Bravo REC Management LLC | Hanford, CA | California Independent System Operator (CISO) | 3.0 GWh | Jun 2024 | Dec 2024 | Solar |
| Division 3 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 458.0 MWh | May 2014 | Dec 2024 | Solar |
| Division 2 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 541.0 MWh | May 2014 | Dec 2024 | Solar |
| Dos Palos | Greenbacker Renewable Energy Corporation | Dos Palos, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2021 | Dec 2024 | Solar |
| Double C Generation Limited Partnership | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 14.9 GWh | Feb 1989 | Dec 2024 | Natural Gas |
| Drews Generating Facility | Colton Power LP | Colton, CA | California Independent System Operator (CISO) | 1.0 GWh | Jul 2001 | Dec 2024 | Natural Gas |
| Drum 1 | Pacific Gas & Electric Co. | Alta, CA | California Independent System Operator (CISO) | 46.4 GWh | Oct 1913 | Oct 2024 | Water |
| Dover Dairy | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 2.7 GWh | Apr 2022 | Dec 2023 | Solar |
| Dutch Flat 2 | Nevada Irrigation District | Dutch Flat, CA | California Independent System Operator (CISO) | 14.5 GWh | Oct 1965 | Dec 2024 | Water |
| Daggett 2 | Daggett Solar Power 2 LLC | Daggett, CA | California Independent System Operator (CISO) | 518.9 GWh | Nov 2023 | Dec 2025 | Solar |
| Danell Bros Inc | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 5.8 GWh | Aug 2021 | Dec 2023 | Solar |
| Dynegy Moss Landing Power Plant Hybrid | Dynegy -Moss Landing LLC | Moss Landing, CA | California Independent System Operator (CISO) | 2.1 TWh | Nov 1967 | Dec 2025 | Natural Gas |
| Dutch Flat | Pacific Gas & Electric Co. | Alta, CA | California Independent System Operator (CISO) | 27.1 GWh | Feb 1943 | Dec 2024 | Water |
| Drum 2 | Pacific Gas & Electric Co. | Alta, CA | California Independent System Operator (CISO) | 148.6 GWh | Nov 1965 | Dec 2024 | Water |
| Daggett 3 | Daggett Solar Power 3 LLC | Daggett, CA | California Independent System Operator (CISO) | 865.8 GWh | Jun 2023 | Dec 2025 | Solar |
| Dulles | Golden Springs Development Company LLC | Jurupa Valley, CA | California Independent System Operator (CISO) | 2.3 GWh | Aug 2016 | Dec 2024 | Solar |
| Drew Solar LLC | Drew Solar LLC | Calexico, CA | California Independent System Operator (CISO) | 308.3 GWh | Oct 2022 | Dec 2025 | Solar |
| DSH (CA) - Coalinga State Hospital | Team-Solar, Inc. | Coalinga, CA | California Independent System Operator (CISO) | 4.6 GWh | Jun 2014 | Dec 2024 | Solar |
| DGS Central California Womens Facility | Forefront Power, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2020 | Nov 2024 | Solar |
| Desert Sunlight 250, LLC | NextEra Energy Desert Sunlight 250, LLC | Desert Center, CA | California Independent System Operator (CISO) | 555.7 GWh | Oct 2013 | Dec 2024 | Solar |
| Desert Star Energy Center | Desert Star Energy Center SDG&E | Boulder City, NV | California Independent System Operator (CISO) | 375.0 GWh | Apr 2000 | Dec 2025 | Natural Gas |
| Desert Sunlight 300, LLC | NextEra Energy Desert Sunlight 300, LLC | Desert Center, CA | California Independent System Operator (CISO) | 666.9 GWh | Oct 2013 | Dec 2024 | Solar |
| Delta Energy Center | Delta Energy Center LLC | Pittsburg, CA | California Independent System Operator (CISO) | 4.1 TWh | Apr 2002 | Dec 2025 | Natural Gas |
| Division 1 | Tesla Inc. | Lancaster, CA | California Independent System Operator (CISO) | 2.7 GWh | May 2014 | Dec 2024 | Solar |
| Delta Electronics Fremont | Delta Electronics (Americas) Ltd | Fremont, CA | California Independent System Operator (CISO) | 616.0 MWh | Mar 2016 | Dec 2024 | Solar |
| Desert Quartzite | Desert Quartzite LLC | Blythe, CA | California Independent System Operator (CISO) | 822.9 GWh | Nov 2024 | Dec 2025 | Solar |
| Devil Canyon | California Dept. of Water Resources | San Bernardino, CA | California Independent System Operator (CISO) | 789.9 GWh | Nov 1972 | Dec 2025 | Water |
| D'Arrigo Brothers - Phase 4 | CalCom Energy | Salinas, CA | California Independent System Operator (CISO) | 4.3 GWh | Feb 2019 | Dec 2024 | Solar |
| Desert Hot Springs Solar | Consolidated Edison Solutions Inc. | Desert Hot Springs, CA | California Independent System Operator (CISO) | 4.8 GWh | Nov 2013 | Nov 2024 | Solar |
| Desert Harvest, LLC | Desert Harvest, LLC | Desert Center, CA | California Independent System Operator (CISO) | 231.0 GWh | Nov 2020 | Dec 2025 | Solar |
| Desert Harvest II LLC | Desert Harvest II LLC | Desert Center, CA | California Independent System Operator (CISO) | 180.6 GWh | Nov 2020 | Dec 2025 | Solar |
| Desert Green Solar Farm LLC | Invenergy Services LLC | Boulevard, CA | California Independent System Operator (CISO) | 10.4 GWh | Oct 2014 | Dec 2024 | Solar |
| Delano Land 1 | AES Distributed Energy | Delano, CA | California Independent System Operator (CISO) | 963.0 MWh | Nov 2017 | Dec 2024 | Solar |
| Delano Energy Center | Wellhead Services, Inc | Delano, CA | California Independent System Operator (CISO) | 7.3 GWh | Dec 2012 | Dec 2024 | Natural Gas |
| Dillon Wind LLC | Avangrid Power LLC | North Palm Springs, CA | California Independent System Operator (CISO) | 142.4 GWh | Mar 2008 | Dec 2024 | Wind |
| Dissigno Healdsburg FPV, LLC | Palmetto Power Management LLC | Healdsburg, CA | California Independent System Operator (CISO) | 6.0 GWh | Nov 2020 | Dec 2024 | Solar |
| DirecTV - Los Angeles | Bloom Energy | Los Angeles, CA | California Independent System Operator (CISO) | 8.3 GWh | Sep 2016 | Dec 2024 | Natural Gas |
| Dion R Holm | City & County of San Francisco | Groveland, CA | California Independent System Operator (CISO) | 578.4 GWh | Jul 1960 | Dec 2025 | Water |
| Dinuba Wastewater Treatment Plant | AES Distributed Energy | Dinuba, CA | California Independent System Operator (CISO) | 1.4 GWh | Oct 2011 | Dec 2024 | Solar |
| Dinosaur Point | International Turbine Res Inc | Los Banos, CA | California Independent System Operator (CISO) | 4.9 GWh | Apr 1988 | Jun 2024 | Wind |
| Deer Creek 2 | Greenbacker Renewable Energy Corporation | Shingle Springs, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2021 | Dec 2024 | Solar |
| Deer Creek PH | Nevada Irrigation District | Nevada City, CA | California Independent System Operator (CISO) | 12.1 GWh | Apr 1908 | Dec 2024 | Water |
| DGS Valley State Prison | Forefront Power, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 3.9 GWh | Jan 2021 | Dec 2024 | Solar |
| Difwind Farms Ltd VI | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 14.9 GWh | Dec 1986 | Dec 2024 | Wind |
| Diamond Valley Solar Project | Ecos Energy LLC | Winchester, CA | California Independent System Operator (CISO) | 2.2 GWh | Dec 2014 | Dec 2024 | Solar |
| Diamond Valley Lake | Metropolitan Water District of S CA | Winchester, CA | California Independent System Operator (CISO) | 5.4 GWh | Apr 2001 | Apr 2024 | Water |
| Diamond H Dairy Power | Madera DP 2, LLC | Chowchilla, CA | California Independent System Operator (CISO) | 11.9 GWh | Sep 2021 | Dec 2024 | Other Biomass Gas |
| Diablo Winds LLC | Sequitur Renewables, LLC | Livermore, CA | California Independent System Operator (CISO) | 20.5 GWh | Nov 2004 | Dec 2024 | Wind |
| Diablo Canyon | Pacific Gas & Electric Co. | Avila Beach, CA | California Independent System Operator (CISO) | 17.6 TWh | Apr 1985 | Dec 2025 | Nuclear |
| DGS Wasco State Prison | Forefront Power, LLC | Wasco, CA | California Independent System Operator (CISO) | 4.5 GWh | Jun 2020 | Dec 2024 | Solar |
| Denmark Solar | Dominion Renewable Energy | Denmark, SC | Dominion Energy South Carolina, Inc. (SCEG) | 11.9 GWh | Nov 2020 | Dec 2024 | Solar |
| Diamond Solar | DP-C2 Episode 1 LLC | Pelion, SC | Dominion Energy South Carolina, Inc. (SCEG) | 8.5 GWh | May 2019 | Dec 2024 | Solar |
| Duke Energy CHP at Clemson University | Duke Energy Carolinas, LLC | Clemson, SC | Duke Energy Carolinas (DUK) | 95.0 GWh | Nov 2019 | Dec 2024 | Natural Gas |
| Dixon Dairy Road Solar | Palmetto Power Management LLC | Kings Mountain, NC | Duke Energy Carolinas (DUK) | 6.3 GWh | Nov 2011 | Dec 2024 | Solar |
| Davidson IV | SunE B9 Holdings, LLC | Lexington, NC | Duke Energy Carolinas (DUK) | 5.1 GWh | Nov 2010 | Dec 2024 | Solar |
| DE Solar 1725 Drywall Dr | Duke Energy Carolinas, LLC | Mt. Holly, NC | Duke Energy Carolinas (DUK) | 902.0 MWh | Dec 2009 | Dec 2024 | Solar |
| Davidson III | SunE B9 Holdings, LLC | Lexington, NC | Duke Energy Carolinas (DUK) | 7.3 GWh | Nov 2010 | Dec 2024 | Solar |
| Davidson Gas Producers LLC | Davidson Gas Producers LLC | Lexington, NC | Duke Energy Carolinas (DUK) | 11.5 GWh | Oct 2010 | Dec 2024 | Landfill Gas |
| Dragstrip Farm | Strata Manager, LLC | Hickory, NC | Duke Energy Carolinas (DUK) | 9.4 GWh | Sep 2014 | Dec 2024 | Solar |
| DD Fayetteville Solar NC LLC | Duke Energy Progress - (NC) | Fayetteville, NC | Duke Energy Carolinas (DUK) | 37.9 GWh | Oct 2015 | Dec 2024 | Solar |
| Daystar Solar | Altus Power America Management, LLC | Pollocksville, NC | Duke Energy Carolinas (DUK) | 9.6 GWh | Aug 2017 | Dec 2024 | Solar |
| Drexel Operations Center | North Carolina Mun Power Agny #1 | Drexel, NC | Duke Energy Carolinas (DUK) | 77.0 MWh | Jul 2007 | Dec 2024 | Distillate Fuel Oil |
| DE Solar 10240 Old Dowd Rd | Duke Energy Carolinas, LLC | Charlotte, NC | Duke Energy Carolinas (DUK) | 1.9 GWh | Aug 2010 | Sep 2024 | Solar |
| DE Solar 657 Brigham Rd | Duke Energy Carolinas, LLC | Greensboro, NC | Duke Energy Carolinas (DUK) | 580.0 MWh | Mar 2010 | Sep 2024 | Solar |
| Dearborn | Duke Energy Carolinas, LLC | Great Falls, SC | Duke Energy Carolinas (DUK) | 91.5 GWh | Feb 1923 | Dec 2024 | Water |
| Davidson V | SunE B9 Holdings, LLC | Lexington, NC | Duke Energy Carolinas (DUK) | 2.4 GWh | Nov 2010 | Dec 2024 | Solar |
| Dan River | Duke Energy Carolinas, LLC | Eden, NC | Duke Energy Carolinas (DUK) | 3.9 TWh | Nov 2012 | Dec 2025 | Natural Gas |
| Duplin Solar LLC | SRE Utility Solar 1, LLC | Warsaw, NC | Duke Energy Carolinas (DUK) | 8.8 GWh | Nov 2013 | Dec 2024 | Solar |
| Duplin Solar I LLC (160 Houston Lane) | Duplin Solar I, LLC | Kenansville, NC | Duke Energy Carolinas (DUK) | 2.5 GWh | Jun 2014 | Dec 2024 | Solar |
| Daniel Farm LLC | Strata Manager, LLC | Mocksville, NC | Duke Energy Carolinas (DUK) | 8.5 GWh | Feb 2014 | Dec 2024 | Solar |
| Durham Solar | SRE Utility Solar 1, LLC | Durham, NC | Duke Energy Carolinas (DUK) | 5.0 GWh | Nov 2015 | Dec 2024 | Solar |
| Dibrell Farm | Strata Manager, LLC | Pelham, NC | Duke Energy Carolinas (DUK) | 9.2 GWh | Feb 2013 | Dec 2024 | Solar |
| Debary Solar Power Plant | Duke Energy Florida, LLC | DeBary, FL | Duke Energy Florida, Inc. (FPC) | 126.8 GWh | Apr 2020 | Dec 2025 | Solar |
| Duette Solar Power Plant | Duke Energy Florida, LLC | Parrish, FL | Duke Energy Florida, Inc. (FPC) | 170.0 GWh | Sep 2021 | Dec 2025 | Solar |
Summary of Power Plants By State
Figures are based on December 2025 generation numbers.| State | Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Alabama | # 7 | 76 | 12,766.12 GWh |
| Alaska | # 48 | 139 | 625.46 GWh |
| Arizona | # 16 | 183 | 8,962.31 GWh |
| Arkansas | # 29 | 114 | 5,525.50 GWh |
| California | # 5 | 1,683 | 14,393.99 GWh |
| Colorado | # 31 | 297 | 4,649.38 GWh |
| Connecticut | # 34 | 162 | 4,087.83 GWh |
| Delaware | # 49 | 33 | 469.96 GWh |
| District of Columbia | # 51 | 16 | 14.80 GWh |
| Florida | # 3 | 333 | 19,379.32 GWh |
| Georgia | # 8 | 248 | 12,492.24 GWh |
| Hawaii | # 46 | 70 | 814.97 GWh |
| Idaho | # 41 | 146 | 2,123.12 GWh |
| Illinois | # 4 | 379 | 17,546.79 GWh |
| Indiana | # 13 | 214 | 9,789.95 GWh |
| Iowa | # 20 | 293 | 7,310.28 GWh |
| Kansas | # 28 | 183 | 5,586.75 GWh |
| Kentucky | # 22 | 60 | 6,716.43 GWh |
| Louisiana | # 17 | 84 | 8,587.03 GWh |
| Maine | # 45 | 215 | 1,484.81 GWh |
| Maryland | # 37 | 203 | 3,225.85 GWh |
| Massachusetts | # 43 | 640 | 2,073.13 GWh |
| Michigan | # 11 | 269 | 11,734.82 GWh |
| Minnesota | # 27 | 764 | 5,712.30 GWh |
| Mississippi | # 24 | 56 | 6,090.79 GWh |
| Missouri | # 23 | 125 | 6,623.76 GWh |
| State | Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Montana | # 40 | 70 | 2,639.28 GWh |
| Nebraska | # 36 | 125 | 3,667.32 GWh |
| Nevada | # 38 | 114 | 3,217.22 GWh |
| New Hampshire | # 44 | 56 | 1,878.83 GWh |
| New Jersey | # 30 | 387 | 5,182.27 GWh |
| New Mexico | # 35 | 142 | 3,818.41 GWh |
| New York | # 10 | 950 | 11,800.05 GWh |
| North Carolina | # 9 | 904 | 12,153.04 GWh |
| North Dakota | # 33 | 58 | 4,218.72 GWh |
| Ohio | # 6 | 198 | 13,425.53 GWh |
| Oklahoma | # 18 | 141 | 7,637.23 GWh |
| Oregon | # 21 | 272 | 6,788.64 GWh |
| Pennsylvania | # 2 | 252 | 22,539.49 GWh |
| Rhode Island | # 47 | 100 | 775.70 GWh |
| South Carolina | # 15 | 207 | 8,967.44 GWh |
| South Dakota | # 42 | 52 | 2,122.20 GWh |
| Tennessee | # 19 | 88 | 7,328.17 GWh |
| Texas | # 1 | 947 | 46,150.81 GWh |
| Utah | # 39 | 125 | 2,845.12 GWh |
| Vermont | # 50 | 116 | 189.85 GWh |
| Virginia | # 14 | 237 | 9,421.16 GWh |
| Washington | # 12 | 135 | 10,635.09 GWh |
| West Virginia | # 26 | 39 | 5,763.55 GWh |
| Wisconsin | # 25 | 243 | 5,804.32 GWh |
| Wyoming | # 32 | 70 | 4,436.68 GWh |