Ridge Rd
123 E. Ridge Road, Alamo, TX 78516Plant Summary Information
Ridge Rd is ranked #23 out of 47 distillate fuel oil power plants in Texas in terms of total annual net electricity generation.
Ridge Rd is comprised of 15 generators and generated 47.1 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Ridge Rd |
|---|---|
| Utility Name | Power Depot Group A, LLC |
| Location | Hidalgo County, TX |
| Initial Operation Date | August 2013 |
| Last Update | Dec 2024 |
| Annual Generation | 249.0 MWh |
| Annual Consumption | 3.2 k MMBtu |
| Ranked #11,864 out of 12,539 Power Plants Nationwide | |
| Ranked #634 out of 1,236 Distillate Fuel Oil Power Plants Nationwide | |
| Ranked #699 out of 799 Texas Power Plants | |
| Ranked #23 out of 47 Texas Distillate Fuel Oil Power Plants | |
| Fuel Types | Distillate Fuel Oil |
Map of Ridge Rd
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ridge Rd.
Monthly Net Generation for Ridge Rd
Ridge Rd Details
| Summary Information | |
|---|---|
| Plant Name | Ridge Rd (65573) |
| Plant Address | 123 E. Ridge Road, Alamo, TX 78516 |
| Utility | Power Depot Group A, LLC (64812) |
| Latitude, Longitude | 26.16815, -98.09831 |
| Generation Dates on File | Jan 2022 to Dec 2024 |
| Initial Operation Date | August 2013 |
| Annual Generation | 249.0 MWh |
| Fuel Types | Distillate Fuel Oil |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator RR1 Details Operating August 2013
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.6 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2013 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator RR10 Details Operating August 2013
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.6 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2013 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator RR11 Details Operating August 2013
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.6 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2013 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator RR12 Details Operating August 2013
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.6 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2013 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator RR13 Details Operating August 2013
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.6 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2013 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator RR14 Details Operating August 2013
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.6 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2013 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator RR15 Details Operating August 2013
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.6 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2013 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator RR2 Details Operating August 2013
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.6 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2013 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator RR3 Details Operating August 2013
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.6 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2013 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator RR4 Details Operating August 2013
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.6 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2013 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator RR5 Details Operating August 2013
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.6 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2013 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator RR6 Details Operating August 2013
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.6 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2013 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator RR7 Details Operating August 2013
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.6 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2013 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator RR8 Details Operating August 2013
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.6 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2013 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Generator RR9 Details Operating August 2013
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.6 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.6 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2013 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Ridge Rd Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #624 | Richmond Generating Station | Phila., PA | 258.6 MWh |
| #625 | Laurens | Laurens, IA | 257.0 MWh |
| #626 | Burlington (KS) | Burlington, KS | 257.0 MWh |
| #627 | Perkasie PA BTM | Perkasie, PA | 256.0 MWh |
| #628 | Mifflinburg PA BTM | Mifflinburg, PA | 255.0 MWh |
| #629 | Sullivan (IL) | Sullivan, IL | 255.0 MWh |
| #630 | Alliant SBD 9106 Rockwell CR | Cedar Rapids, IA | 252.8 MWh |
| #631 | Henrico | Glen Allen, VA | 5.2 GWh |
| #632 | Gateway Gen | Manassas, VA | 251.0 MWh |
| #633 | Riverton | Riverton, KS | 1.5 TWh |
| #635 | Humboldt Sawmill Company | Scotia, CA | 110.1 GWh |
| #636 | Gustavus | Gustavus, AK | 247.0 MWh |
| #637 | ACM - Midtown Thermal | Atlantic City, NJ | 46.7 GWh |
| #638 | Citrus City | Mission, TX | 245.0 MWh |
| #639 | Napoleon Peaking | Napoleon, OH | 244.0 MWh |
| #640 | KapStone Kraft Paper Corp | Roanoke Rapids, NC | 179.4 GWh |
| #641 | L V Sutton Combined Cycle | Wilmington, NC | 3.4 TWh |
| #642 | Stonegate | Katy, TX | 234.0 MWh |
| #643 | Blooming Prairie | Blooming Prairie, MN | 234.0 MWh |
| #644 | E. Porte Ct. | Harlingen, TX | 233.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ridge Rd.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Citrus City | Mission, TX | 245.0 MWh | 18.9 mi |
| E. Porte Ct. | Harlingen, TX | 233.0 MWh | 27 mi |
| Frontera Energy Center | Mission, TX | 2.0 TWh | 18.9 mi |
| HEB00038 | San Juan, TX | 244.0 MWh | 4.8 mi |
| Hidalgo Energy Center | Edinburg, TX | 2.8 TWh | 12.9 mi |
| Hidalgo Wind Farm II | Edinburg, TX | 151.7 GWh | 31.2 mi |
| Hidalgo Wind Farm LLC | McCook, TX | 816.5 GWh | 28.2 mi |
| Los Vientos Wind 1B | Sebastian, TX | 353.9 GWh | 29.5 mi |
| Magic Valley Generating Station | Edinburg, TX | 2.2 TWh | 13.2 mi |
| Nebula Solar | La Feria, TX | 280.7 GWh | 19.4 mi |
| Raymond Wind Farm, LLC | Lyford, TX | 676.2 GWh | 23.9 mi |
| Red Gate Power Plant | Edinburg, TX | 332.2 GWh | 20.2 mi |
| Santa Rosa | Santa Rosa, TX | 275.0 MWh | 17.6 mi |
| Vancourt Solar Interconnections | La Feria, TX | 90.5 GWh | 19.4 mi |
| Vaquero | Harlingen, TX | 270.0 MWh | 27.5 mi |
| WAL3320 | Palmhurst, TX | 291.0 MWh | 14.9 mi |
| WAL3886 | Edinburg, TX | 282.0 MWh | 9.5 mi |
| WAL452 | Mcallen, TX | 277.0 MWh | 10.5 mi |
| WAL5165 | Alamo, TX | 275.0 MWh | 2.5 mi |
| West Raymond Wind Farm LLC | Lyford, TX | 759.5 GWh | 15.8 mi |