Blake Solar Plant
15750 Charles Town Road, Charles Town, WV 25414Plant Summary Information
Blake Solar Plant is ranked #23 out of 38 power plants in West Virginia in terms of total annual net electricity generation.
Blake Solar Plant generated 32.0 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Blake Solar Plant |
---|---|
Utility Name | Horus West Virginia 1, LLC |
Location | Jefferson County, WV |
Initial Operation Date | March 2024 |
Last Update | Mar 2025 |
Annual Generation | 163.1 GWh |
Annual Consumption | 600.1 k MMBtu |
Ranked #2,636 out of 12,288 Power Plants Nationwide | |
Ranked #403 out of 6,174 Solar Power Plants Nationwide | |
Ranked #23 out of 38 West Virginia Power Plants | |
Ranked #1 out of 4 West Virginia Solar Power Plants | |
Fuel Types | Solar |
Map of Blake Solar Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Blake Solar Plant.
Monthly Net Generation for Blake Solar Plant
Blake Solar Plant Details
Summary Information | |
---|---|
Plant Name | Blake Solar Plant (66276) |
Plant Address | 15750 Charles Town Road, Charles Town, WV 25414 |
Utility | Horus West Virginia 1, LLC (65400) |
Latitude, Longitude | 39.26361, -77.83341 |
Generation Dates on File | Mar 2024 to Mar 2025 |
Initial Operation Date | March 2024 |
Annual Generation | 163.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | FirstEnergy Pennsylvania Electric Co (66101) NY |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator US620 Details Operating March 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | PJM pnode 34964545 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | PJM pnode 34964545 |
Nameplate Capacity | 96 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 80 MW |
Winter Capacity | 80 MW |
Minimum Load | 0.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2024 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Combustion Technology | No |
Other Planned Modifications | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Bifacial | Yes |
Tilt Angle | 0.6 |
DC Net Capacity | 99.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Blake Solar Plant Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#393 | Sparkleberry | Molino, FL | 165.9 GWh |
#394 | Washington County Solar | Sandersville, GA | 165.8 GWh |
#395 | FPL Cypress Pond Solar | Vernon, FL | 165.5 GWh |
#396 | Assembly Solar III | Lennon, MI | 165.0 GWh |
#397 | G.S.E. One LLC | Bonham, TX | 164.3 GWh |
#398 | Pineapple | Port St Lucie, FL | 164.1 GWh |
#399 | Lily Solar | Martin, SC | 164.0 GWh |
#400 | Elizabeth Solar Plant | Pitkin, LA | 164.0 GWh |
#401 | Chautauqua Solar Energy Center | Defuniak Springs, FL | 163.3 GWh |
#402 | Bulldog Solar LLC | Warrenton, GA | 163.3 GWh |
#404 | Duette Solar Power Plant | Parrish, FL | 163.0 GWh |
#405 | Altavista Solar | Lynch Station, VA | 162.9 GWh |
#406 | Wildflower Solar, LLC (MS) | DeSoto, MS | 162.6 GWh |
#407 | CPV Maple Hill Solar | Portage, PA | 162.5 GWh |
#408 | Elektron Solar, LLC | Grantsville, UT | 162.5 GWh |
#409 | Fort Green Solar Power Plant | Bowling Green, FL | 162.3 GWh |
#410 | FPL Saw Palmetto Solar Energy Center | Youngstown, FL | 161.9 GWh |
#411 | Silver Palm | TBD, FL | 161.5 GWh |
#412 | Cabin Creek Solar, LLC | Biscoe, NC | 161.4 GWh |
#413 | Spring Grove I | Spring Grove, VA | 161.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Blake Solar Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bartonsville Energy Facility, LLC | Stephens, VA | 38.4 GWh | 24.9 mi |
Big Spring Solar (CSG) | Clear Spring, MD | 264.0 MWh | 25.6 mi |
Dam No. 4 Hydro Station | Shepherdstown, WV | 8.8 GWh | 15.9 mi |
Dam No. 5 Hydro Station | Hedgesville, WV | 4.1 GWh | 24.1 mi |
Dickerson Power | Dickerson, MD | 129.2 GWh | 20.1 mi |
FedEx Hagerstown | Hagerstown, MD | 2.7 GWh | 26 mi |
Fort Detrick Solar PV | Frederick, MD | 21.2 GWh | 23.8 mi |
Francis Scott Key Mall | Frederick, MD | 1.3 GWh | 24.2 mi |
Frederick County LFGTE Facility | Winchester, VA | 13.0 GWh | 16.5 mi |
Hecate Energy Clarke County LLC | White Post, VA | 15.2 GWh | 21.3 mi |
HP Hood CT | Winchester, VA | 106.8 GWh | 21 mi |
Maryland Solar | Hagerstown, MD | 30.0 GWh | 21.6 mi |
Millville Hydro Station | Millville, WV | 8.6 GWh | 2.7 mi |
Montgomery County Resource Recovery | Dickerson, MD | 293.5 GWh | 20.7 mi |
Pinesburg Solar LLC | Williamsport, MD | 7.5 GWh | 25 mi |
Potomac Energy Center, LLC | Leesburg, VA | 4.7 TWh | 21 mi |
Rockdale | Williamsport, MD | 1.1 GWh | 25.3 mi |
Spruce - WCMD - Rubble I | Williamsport, MD | 2.9 GWh | 24.5 mi |
Spruce - WCMD - Rubble II | Williamsport, MD | 2.7 GWh | 24.7 mi |
The Village at Orchard Ridge (TVOR) | Winchester, VA | 2.2 GWh | 20.8 mi |