Paris (WI)
335 North 172nd Avenue, Union Grove, WI 53182Plant Summary Information
Paris (WI) is ranked #26 out of 239 power plants in Wisconsin in terms of total annual net electricity generation.
Paris (WI) is comprised of 4 generators and generated 52.0 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Paris (WI) |
---|---|
Utility Name | Wisconsin Electric Power Co |
Location | Kenosha County, WI |
Initial Operation Date | March 1995 |
Last Update | Dec 2024 |
Annual Generation | 227.4 GWh |
Annual Consumption | 3.0 M MMBtu |
Ranked #2,231 out of 12,288 Power Plants Nationwide | |
Ranked #711 out of 2,221 Natural Gas Power Plants Nationwide | |
Ranked #26 out of 239 Wisconsin Power Plants | |
Ranked #14 out of 52 Wisconsin Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Paris (WI)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Paris (WI).
Monthly Net Generation for Paris (WI)
Paris (WI) Details
Summary Information | |
---|---|
Plant Name | Paris (WI) (7270) |
Plant Address | 335 North 172nd Avenue, Union Grove, WI 53182 |
Utility | Wisconsin Electric Power Co (20847) |
Latitude, Longitude | 42.6658, -88.0131 |
Generation Dates on File | Jan 2001 to Dec 2024 |
Initial Operation Date | March 1995 |
Annual Generation | 227.4 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | American Transmission Co (659) WI |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | ANR PIPELINE COMPANY |
Natural Gas Storage | No |
Generator 1 Details Operating March 1995
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WEC.PARIS01S1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WEC.PARIS01S1 |
Nameplate Capacity | 95.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 88.9 MW |
Winter Capacity | 100 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | July 2024 |
Status | Operating |
---|---|
First Operation Date | March 1995 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 90.1 MW |
Net Winter Capacity With Natural Gas | 100 MW |
Net Summer Capacity With Oil | 90.1 MW |
Net Winter Capacity With Oil | 100 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 2 Details Operating March 1995
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WEC.PARIS01S2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WEC.PARIS01S2 |
Nameplate Capacity | 95.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 90 MW |
Winter Capacity | 100 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | July 2024 |
Status | Operating |
---|---|
First Operation Date | March 1995 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 90.8 MW |
Net Winter Capacity With Natural Gas | 100 MW |
Net Summer Capacity With Oil | 90.8 MW |
Net Winter Capacity With Oil | 90 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 3 Details Operating June 1995
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WEC.PARIS01S3 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WEC.PARIS01S3 |
Nameplate Capacity | 95.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 92.4 MW |
Winter Capacity | 100 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | July 2024 |
Status | Operating |
---|---|
First Operation Date | June 1995 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 94.5 MW |
Net Winter Capacity With Natural Gas | 100 MW |
Net Summer Capacity With Oil | 94.5 MW |
Net Winter Capacity With Oil | 90 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 4 Details Operating June 1995
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | WEC.PARIS01S4 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WEC.PARIS01S4 |
Nameplate Capacity | 95.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 88.5 MW |
Winter Capacity | 100 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | July 2024 |
Status | Operating |
---|---|
First Operation Date | June 1995 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 91.3 MW |
Net Winter Capacity With Natural Gas | 100 MW |
Net Summer Capacity With Oil | 91.3 MW |
Net Winter Capacity With Oil | 90 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Paris (WI) Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#701 | Kern River Cogeneration | Bakersfield, CA | 238.4 GWh |
#702 | Edward L. Addison Generating Plant | Thomaston, GA | 241.9 GWh |
#703 | Larsen Memorial | Lakeland, FL | 237.6 GWh |
#704 | Granite City Works | Granite City, IL | 466.8 GWh |
#705 | Waterford 1 & 2 | Killona, LA | 239.7 GWh |
#706 | Angus Anson | Sioux Falls, SD | 237.3 GWh |
#707 | Harbor | Wilmington, CA | 235.4 GWh |
#708 | Atlantic Alumina, Gramercy Operations | Gramercy, LA | 231.1 GWh |
#709 | Valero Wilmington Cogeneration Plant | Wilmington, CA | 228.2 GWh |
#710 | Leon Creek | San Antonio, TX | 227.5 GWh |
#712 | NAEA Lakewood LLC | Lakewood, NJ | 227.2 GWh |
#713 | Canal | Sandwich, MA | 305.0 GWh |
#714 | ArcelorMittal Burns Harbor | Burns Harbor, IN | 922.0 GWh |
#715 | Whitehorn | Blaine, WA | 230.3 GWh |
#716 | Redding Power | Redding, CA | 223.7 GWh |
#717 | Georgia-Pacific Brewton Mill | Brewton, AL | 499.4 GWh |
#718 | Cornell University Central Heat | Ithaca, NY | 222.4 GWh |
#719 | Georgia-Pacific Monticello Paper | Monticello, MS | 550.2 GWh |
#720 | E W Brown | Harrodsburg, KY | 1.6 TWh |
#721 | University of California San Diego Hybri | La Jolla, CA | 220.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Paris (WI).
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ATI | Cudahy, WI | 3.5 GWh | 20.8 mi |
City of Milwaukee Landfill | Milwaukee, WI | 3.6 GWh | 19.6 mi |
CREE | Racine, WI | 2.3 GWh | 6.8 mi |
Elm Road Generating Station | Oak Creek, WI | 8.3 TWh | 15.6 mi |
IKEA Oak Creek Rooftop PV System | Oak Creek, WI | 1.4 GWh | 16.9 mi |
LaFayette Solar WI, LLC | Elkhorn, WI | 15.0 MWh | 26.5 mi |
Metro Gas Recovery | Franklin, WI | 37.0 GWh | 13.1 mi |
MMSD Jones Island Wastewater | Milwaukee, WI | 58.7 GWh | 25.2 mi |
MMSD South Shore Wastewater | Oak Creek, WI | 26.3 GWh | 17.6 mi |
N Solon Road (South) | Richmond, IL | 138.0 MWh | 19.6 mi |
North Chicago Energy Center | North Chicago, IL | 36.0 GWh | 26.2 mi |
Paris Solar | Union Grove, WI | 59.7 GWh | 0.3 mi |
Pheasant Run Landfill Gas Recovery | Bristol, WI | 47.9 GWh | 6 mi |
Silver Lake Solar WI, LLC | Salem, WI | 2.1 GWh | 11 mi |
South Oak Creek | Oak Creek, WI | 2.2 TWh | 15.5 mi |
Spring Prairie Solar WI, LLC | Burlington, WI | 4.0 GWh | 16.6 mi |
UW Parkside | Kenosha, WI | 3.9 GWh | 8.1 mi |
Valley (WI) | Milwaukee, WI | 448.3 GWh | 25.6 mi |
Waxdale | Sturtevant, WI | 38.6 GWh | 7.2 mi |
Zion Energy Center | Zion, IL | 363.6 GWh | 14.3 mi |