Niagara Bottling - Seguin
1730 8th St, Seguin, TX 78155Plant Summary Information
Niagara Bottling - Seguin is ranked #161 out of 188 solar farms in Texas in terms of total annual net electricity generation.
Niagara Bottling - Seguin generated 1.7 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Niagara Bottling - Seguin |
---|---|
Utility Name | SkyHigh 2 Solar |
Location | Guadalupe County, TX |
Initial Operation Date | October 2021 |
Last Update | Dec 2024 |
Annual Generation | 8.0 GWh |
Annual Consumption | 28.8 k MMBtu |
Ranked #6,785 out of 12,288 Power Plants Nationwide | |
Ranked #2,279 out of 6,174 Solar Power Plants Nationwide | |
Ranked #589 out of 788 Texas Power Plants | |
Ranked #161 out of 188 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Niagara Bottling - Seguin
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Niagara Bottling - Seguin.
Monthly Net Generation for Niagara Bottling - Seguin
Niagara Bottling - Seguin Details
Summary Information | |
---|---|
Plant Name | Niagara Bottling - Seguin (64389) |
Plant Address | 1730 8th St, Seguin, TX 78155 |
Utility | SkyHigh 2 Solar (63432) |
Latitude, Longitude | 29.58914, -97.9772 |
Generation Dates on File | Oct 2021 to Dec 2024 |
Initial Operation Date | October 2021 |
Annual Generation | 8.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | City of Seguin - (TX) (16900) TX |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator NIAGS Details Operating October 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 4.9 MW |
Summer Capacity | 4.9 MW |
Winter Capacity | 4.9 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 11 |
DC Net Capacity | 5.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 5.7 MW |
Virtual Net Metering Agreement | No |
Niagara Bottling - Seguin Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2269 | Vance Solar Farm, LLC | Kittrell, NC | 8.0 GWh |
#2270 | Westside Wastewater Treatment Plant Hybr | Fayetteville, AR | 7.8 GWh |
#2271 | Walt Disney World Solar Facility | Orlando, FL | 8.0 GWh |
#2272 | Dundas Solar Holdings LLC CSG | Northfield, MN | 8.0 GWh |
#2273 | Jacob Solar | Reidsville, NC | 8.0 GWh |
#2274 | Held Solar Project | Waite Park, MN | 8.0 GWh |
#2275 | Randall Solar Project Hybrid | Berlin, MA | 7.9 GWh |
#2276 | ELP Claverack Solar | Claverack, NY | 8.0 GWh |
#2277 | 299 Farm to Market Rd Hybrid(CSG) | Wareham, MA | 7.9 GWh |
#2278 | SunE Feely 1 CSG, LLC | Farmington, MN | 8.0 GWh |
#2280 | Farmington Holdco Solar | Farmington, MN | 8.0 GWh |
#2281 | Happy Hollow CSG Hybrid | Winchendon, MA | 8.0 GWh |
#2282 | Owen Solar | Lincolnton, NC | 8.0 GWh |
#2283 | Taylors Falls CSG | Taylor Falls, MN | 8.0 GWh |
#2284 | Cokato CSG | Cokato, MN | 8.0 GWh |
#2285 | Gliden (Op Zone) | Tyner, NC | 8.0 GWh |
#2286 | CalCity Solar 1 | California City, CA | 7.9 GWh |
#2287 | CBEP Solar 4, LLC | Milliken, CO | 7.9 GWh |
#2288 | Saratoga Solar LLC | Milton, NY | 7.9 GWh |
#2289 | Sangerfield Solar CSG | Waterville, NY | 7.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Niagara Bottling - Seguin.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Blue Wing Solar Energy Generation | San Antonio, TX | 19.1 GWh | 32.2 mi |
CPS 1 Community Solar | Adkins, TX | 1.8 GWh | 22.8 mi |
Dunlap TP 1 | New Brannfels, TX | 673.0 MWh | 5.4 mi |
FELPS 1 - Calaveras | Floresville, TX | 1.8 GWh | 30.3 mi |
FELPS 2 - Calaveras | Floresville, TX | 1.9 GWh | 30.3 mi |
FELPS 3 - Floresville South | Floresville, TX | 2.2 GWh | 32.7 mi |
FELPS 4 - Floresville South | Floresville, TX | 2.2 GWh | 32.8 mi |
FELPS 5- Floresville South | Floresville, TX | 2.2 GWh | 32.8 mi |
Guadalupe Generating Station | Marion, TX | 6.3 TWh | 10.2 mi |
Hays Energy Project | San Marcos, TX | 5.3 TWh | 13.2 mi |
HEB_CPSSADC | San Antonio, TX | 944.0 MWh | 25.9 mi |
IKEA Live Oak Rooftop PV System | Live Oak, TX | 2.1 GWh | 18.1 mi |
J K Spruce | San Antonio, TX | 6.0 TWh | 28.3 mi |
Mesquite Creek LFGTE Project | New Braunfels, TX | 23.9 GWh | 10.6 mi |
O W Sommers | San Antonio, TX | 1.9 TWh | 28.5 mi |
OCI Alamo 2, LLC | Converse, TX | 8.8 GWh | 22.9 mi |
OCI Alamo 3 LLC | San Antonio, TX | 9.9 GWh | 20.7 mi |
OCI Alamo 4, LLC | Brackettville, TX | 76.0 GWh | 20.8 mi |
Rio Nogales Power Project | Seguin, TX | 5.2 TWh | 0.4 mi |
V H Braunig | Elmendorf, TX | 2.3 TWh | 33.5 mi |