1741N. Grand Ave, Nogales, AZ 85621Plant Summary Information
Valencia is ranked #30 out of 35 natural gas power plants in Arizona in terms of total annual net electricity generation.
Valencia is comprised of 4 generators and generated 1.2 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Valencia |
---|---|
Utility Name | UNS Electric, Inc |
Location | Santa Cruz County, AZ |
Initial Operation Date | August 1989 |
Last Update | Dec 2024 |
Annual Generation | 4.8 GWh |
Annual Consumption | 74.1 k MMBtu |
Ranked #7,985 out of 12,288 Power Plants Nationwide | |
Ranked #1,735 out of 2,221 Natural Gas Power Plants Nationwide | |
Ranked #128 out of 163 Arizona Power Plants | |
Ranked #30 out of 35 Arizona Natural Gas Power Plants | |
Fuel Types | Natural Gas : 96.3% Distillate Fuel Oil : 3.7% |
Map of Valencia
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Valencia.
Monthly Net Generation for Valencia
Valencia Details
Summary Information | |
---|---|
Plant Name | Valencia (6515) |
Plant Address | 1741N. Grand Ave, Nogales, AZ 85621 |
Utility | UNS Electric, Inc (19728) |
Latitude, Longitude | 31.36347, -110.93134 |
Generation Dates on File | Jan 2002 to Dec 2024 |
Initial Operation Date | August 1989 |
Annual Generation | 4.8 GWh |
Fuel Types | Natural Gas : 96.3% Distillate Fuel Oil : 3.7% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Tucson Electric Power Company (TEPC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | UNS Electric, Inc (19728) AZ |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | UNS GAS INC |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator GT1 Details Standby August 1989
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 18 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 13.5 MW |
Winter Capacity | 14.8 MW |
Minimum Load | 8 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | August 1989 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Fluidized Bed Technology | No |
Pulverized Coal Technology | No |
Supercritical Technology | No |
Ultrasupercritical Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 13.5 MW |
Net Winter Capacity With Natural Gas | 14.7 MW |
Net Summer Capacity With Oil | 13.5 MW |
Net Winter Capacity With Oil | 14.7 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator GT2 Details Standby August 1989
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 18 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 13.5 MW |
Winter Capacity | 14.8 MW |
Minimum Load | 8 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | August 1989 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Fluidized Bed Technology | No |
Pulverized Coal Technology | No |
Supercritical Technology | No |
Ultrasupercritical Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 13.5 MW |
Net Winter Capacity With Natural Gas | 14.7 MW |
Net Summer Capacity With Oil | 13.5 MW |
Net Winter Capacity With Oil | 14.7 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator GT3 Details Standby August 1989
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 18 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 13.5 MW |
Winter Capacity | 14.8 MW |
Minimum Load | 8 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | Yes |
First Operation Date | August 1989 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Fluidized Bed Technology | No |
Pulverized Coal Technology | No |
Supercritical Technology | No |
Ultrasupercritical Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 13.5 MW |
Net Winter Capacity With Natural Gas | 14.7 MW |
Net Summer Capacity With Oil | 13.5 MW |
Net Winter Capacity With Oil | 14.7 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Generator GT4 Details Operating June 2006
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 54 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 19.8 MW |
Winter Capacity | 21.2 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | June 2006 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
---|---|
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Fluidized Bed Technology | No |
Pulverized Coal Technology | No |
Supercritical Technology | No |
Ultrasupercritical Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 18.9 MW |
Net Winter Capacity With Natural Gas | 20 MW |
Net Summer Capacity With Oil | 18.9 MW |
Net Winter Capacity With Oil | 20 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | No |
Valencia Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1725 | Yahoo! - HQ | Sunnyvale, CA | 5.1 GWh |
#1726 | Southside Water Reclamation Plant | Albuquerque, NM | 17.9 GWh |
#1727 | Stamford Health Tully Health Center | Stamford, CT | 5.0 GWh |
#1728 | Northeast (MI) | Warren, MI | 5.9 GWh |
#1729 | Provo Power Plant | Provo, UT | 4.9 GWh |
#1730 | Lorin Industries | Muskegon, MI | 4.8 GWh |
#1731 | Swift Creek Chemical Complex | White Springs, FL | 60.5 GWh |
#1732 | Phoenix Contact - CCHP Plant | Middletown, PA | 4.7 GWh |
#1733 | Carlls Corner | Upper Deerfield Twp, NJ | 5.9 GWh |
#1734 | Sunnyvale City of WPCP | Sunnyvale, CA | 9.5 GWh |
#1736 | University of Colorado | Boulder, CO | 4.6 GWh |
#1737 | Logan City | Logan, UT | 4.6 GWh |
#1738 | Pratt | Pratt, KS | 4.6 GWh |
#1739 | Hardin Generator Project | Hardin, MT | 435.4 GWh |
#1740 | CoreSite - Somerville | Somerville, MA | 4.5 GWh |
#1741 | Beaver Creek Gas Plant | Riverton, WY | 4.5 GWh |
#1742 | Clark University | Worcester, MA | 4.4 GWh |
#1743 | Georgia-Pacific Crossett LLC | Crossett, AR | 4.4 GWh |
#1744 | Hidden View Dairy, LLC | Rensselaer, IN | 4.3 GWh |
#1745 | Weleetka | Weleetka, OK | 4.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Valencia.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Actus Lend Lease DMAFB | Tucson, AZ | 2.5 GWh | 56.7 mi |
Amazon TUS2 | Tucson, AZ | 5.5 GWh | 53.2 mi |
Avalon Solar | Pima, AZ | 64.6 GWh | 44.1 mi |
Avalon Solar II | Sahuarita, AZ | 43.8 GWh | 44.1 mi |
Cogenra - TEP | Tucson, AZ | 1.9 GWh | 51.5 mi |
Davis Monthan AFB (AZ) West Airfield | Tucson, AZ | 30.2 GWh | 56 mi |
Fort Huachuca Solar PV Project | Sierra Vista, AZ | 40.1 GWh | 36.7 mi |
FRB Solar Farm | Tucson, AZ | 4.1 GWh | 51.8 mi |
Gato Montes Solar, LLC | Tucson, AZ | 7.4 GWh | 51.5 mi |
H Wilson Sundt Generating Station | Tucson, AZ | 1.9 TWh | 55.1 mi |
Iron Horse Battery Storage Hybrid | Tucson, AZ | 3.7 GWh | 51.2 mi |
Pima Community College | Tucson, AZ | 2.1 GWh | 55.9 mi |
Pima Community College - East Campus | Tucson, AZ | 2.8 GWh | 54.2 mi |
Prairie Fire | Tucson, AZ | 7.8 GWh | 52.4 mi |
Raptor Ridge | Tucson, AZ | 33.8 GWh | 54.2 mi |
Tech Park Solar | Tucson, AZ | 11.8 GWh | 51.2 mi |
TJX Tucson | Tucson, AZ | 2.2 GWh | 52.6 mi |
UASTP I | Tucson, AZ | 1.6 GWh | 51.2 mi |
Valencia Solar | Tucson, AZ | 24.6 GWh | 54.2 mi |
Wilmot Energy Center LLC | Tucson, AZ | 252.5 GWh | 47 mi |