El Dorado AR
3601 E Main St, El Dorado, AR 71730Plant Summary Information
El Dorado AR is ranked #61 out of 66 solar farms in Arkansas in terms of total annual net electricity generation.
El Dorado AR generated 504.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | El Dorado AR |
|---|---|
| Utility Name | Entegrity Solar El Dorado SD, LLC |
| Location | Union County, AR |
| Initial Operation Date | February 2024 |
| Last Update | Dec 2024 |
| Annual Generation | 1.6 GWh |
| Annual Consumption | 5.4 k MMBtu |
| Ranked #11,027 out of 12,539 Power Plants Nationwide | |
| Ranked #5,750 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #105 out of 112 Arkansas Power Plants | |
| Ranked #61 out of 66 Arkansas Solar Power Plants | |
| Fuel Types | Solar |
Map of El Dorado AR
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for El Dorado AR.
Monthly Net Generation for El Dorado AR
El Dorado AR Details
| Summary Information | |
|---|---|
| Plant Name | El Dorado AR (67517) |
| Plant Address | 3601 E Main St, El Dorado, AR 71730 |
| Utility | Entegrity Solar El Dorado SD, LLC (66239) |
| Latitude, Longitude | 33.21294, -92.62154 |
| Generation Dates on File | Feb 2024 to Dec 2024 |
| Initial Operation Date | February 2024 |
| Annual Generation | 1.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 23-341-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Entergy Arkansas LLC (814) AR |
| Grid Voltage | 35.00 kV |
| Energy Storage | No |
Generator 63154 Details Operating February 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.8 MW |
| Summer Capacity | 1.8 MW |
| Winter Capacity | 1.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 2024 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 15 |
| DC Net Capacity | 2.4 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | Yes |
| Virtual Net Metering DC Capacity | 2.4 MW |
El Dorado AR Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5740 | Bishop Ranch BR 1-X | San Ramon, CA | 1.6 GWh |
| #5741 | Rock Hall | Rock Hall, MD | 1.6 GWh |
| #5742 | ISH Solar Central, LLC | Bayville, NJ | 1.6 GWh |
| #5743 | FAA NorCal TRACON | Mather AFB, CA | 1.6 GWh |
| #5744 | Alticor Inc - Solar Project | Buena Park, CA | 1.6 GWh |
| #5745 | McHenry Solar | Hampton, CT | 1.6 GWh |
| #5746 | Tahquitz High School | Hemet, CA | 1.6 GWh |
| #5747 | Town of Branford | Branford, CT | 1.6 GWh |
| #5748 | Strandness Garden | Starbuck, MN | 1.6 GWh |
| #5749 | Cornell Snyder Road Solar Array | Lansing, NY | 1.6 GWh |
| #5751 | IMPA Tell City Solar Park | Tell City, IN | 1.6 GWh |
| #5752 | Becker Solar 2 CSG | St. Michael, MN | 1.6 GWh |
| #5753 | Salvation Army Solar | Camden, NJ | 1.6 GWh |
| #5754 | CSUF State College | Fullerton, CA | 1.6 GWh |
| #5755 | KSU Trumbull | Warren, OH | 1.6 GWh |
| #5756 | Lake Waconia IV Community Solar Garden | Waconia, MN | 1.6 GWh |
| #5757 | Trenton Solar Farm | Trenton, NJ | 1.6 GWh |
| #5758 | Becker Solar 3 CSG | St. Michael, MN | 1.6 GWh |
| #5759 | IKEA Round Rock 027 | Round Rock, TX | 1.6 GWh |
| #5760 | Erin Garden Solar | City of Green Isle, MN | 1.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding El Dorado AR.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ashley-Chicot Solar | Hamburg, AR | 2.2 GWh | 40.5 mi |
| Bayou Galion Solar Project | Mer Rouge, LA | 211.1 GWh | 56.4 mi |
| Crossett SD | Crossett, AR | 2.2 GWh | 39.8 mi |
| Crossett Solar | Crossett, AR | 210.3 GWh | 39.8 mi |
| General Dynamics | Hampton, AR | 3.6 GWh | 27.3 mi |
| Georgia-Pacific Crossett LLC | Crossett, AR | 4.4 GWh | 37.7 mi |
| Louisiana Tech University Power Plant | Ruston, LA | 42.3 GWh | 47.5 mi |
| McClellan (AR) | Camden, AR | 43.3 GWh | 26.2 mi |
| Oak Ridge Solar | Oak Ridge, LA | 422.4 GWh | 65.4 mi |
| Ouachita | Sterlington, LA | 4.3 TWh | 47.5 mi |
| Perryville Power Station | Sterlington, LA | 3.5 TWh | 50.2 mi |
| Plant 31 Paper Mill | West Monroe, LA | 523.0 GWh | 57.2 mi |
| Prairie Mist Solar | Montrose, AR | 225.1 GWh | 55.1 mi |
| SAU Tech | Bearden, AR | 1.9 GWh | 39.5 mi |
| South Central Electric Cooperative | Arkadelphia, AR | 2.1 GWh | 70.9 mi |
| SR Camden | Camden, AR | 26.2 GWh | 29.3 mi |
| Star City School District | Star City, AR | 2.8 GWh | 69.7 mi |
| Union Power Station | El Dorado, AR | 9.3 TWh | 6 mi |
| Veolia (Gum Springs) | Arkadelphia, AR | 2.7 GWh | 64.4 mi |
| Westrock Hodge (LA) | Hodge, LA | 466.5 GWh | 65.1 mi |