1825 North Pioneer Lane, Vineyard, UT 84058Plant Summary Information
Lake Side Power Plant is ranked #2 out of 123 power plants in Utah in terms of total annual net electricity generation.
Lake Side Power Plant is comprised of 6 generators and generated 1.9 TWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Lake Side Power Plant |
|---|---|
| Utility Name | PacifiCorp |
| Location | Utah County, UT |
| Initial Operation Date | September 2007 |
| Last Update | Sep 2025 |
| Annual Generation | 5.9 TWh |
| Annual Consumption | 46.6 M MMBtu |
| Ranked #172 out of 12,539 Power Plants Nationwide | |
| Ranked #68 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #2 out of 123 Utah Power Plants | |
| Ranked #1 out of 23 Utah Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Lake Side Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lake Side Power Plant.
Monthly Net Generation for Lake Side Power Plant
Lake Side Power Plant Details
| Summary Information | |
|---|---|
| Plant Name | Lake Side Power Plant (56237) |
| Plant Address | 1825 North Pioneer Lane, Vineyard, UT 84058 |
| Utility | PacifiCorp (14354) |
| Latitude, Longitude | 40.33167, -111.75417 |
| Generation Dates on File | Jan 2007 to Sep 2025 |
| Initial Operation Date | September 2007 |
| Annual Generation | 5.9 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Wells |
| Ash Impoundment | |
| Transmission / Distribution Owner | PacifiCorp (14354) UT |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | QUESTAR GAS COMPANY |
| Natural Gas Storage | No |
Generator CT01 Details Operating September 2007
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 182.7 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 169 MW |
| Winter Capacity | 174 MW |
| Minimum Load | 120 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | September 2007 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator CT02 Details Operating September 2007
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 182.7 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 169 MW |
| Winter Capacity | 174 MW |
| Minimum Load | 120 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | September 2007 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator ST01 Details Operating September 2007
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 225.9 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 209 MW |
| Winter Capacity | 215 MW |
| Minimum Load | 140 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | September 2007 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator CT21 Details Operating May 2014
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC2 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 185.4 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 178 MW |
| Winter Capacity | 183.2 MW |
| Minimum Load | 130 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2014 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator CT22 Details Operating May 2014
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC2 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | No |
| Nameplate Capacity | 185.4 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 178 MW |
| Winter Capacity | 183.2 MW |
| Minimum Load | 130 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2014 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Generator ST2 Details Operating May 2014
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC2 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 284.4 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 273 MW |
| Winter Capacity | 281 MW |
| Minimum Load | 140 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2014 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
Lake Side Power Plant Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #58 | Lake Charles Power | West Lake, LA | 6.3 TWh |
| #59 | CPV Three Rivers Energy Center | Morris, IL | 6.3 TWh |
| #60 | Hickory Run Energy Station | New Castle, PA | 6.3 TWh |
| #61 | Dania Beach 7 | Ft. Lauderdale, FL | 6.3 TWh |
| #62 | Manatee | Parrish, FL | 6.2 TWh |
| #63 | Hunterstown Power Plant | Gettysburg, PA | 6.1 TWh |
| #64 | Marcus Hook Energy LP | Marcus Hook, PA | 6.1 TWh |
| #65 | P L Bartow | St. Petersburg, FL | 6.1 TWh |
| #66 | Sithe Independence Station | Oswego, NY | 6.1 TWh |
| #67 | Port Everglades | Ft. Lauderdale, FL | 6.0 TWh |
| #69 | Oregon Clean Energy Center | Oregon, OH | 5.9 TWh |
| #70 | Bethlehem Power Plant | Bethlehem, PA | 5.9 TWh |
| #71 | Acadia Energy Center | Eunice, LA | 5.9 TWh |
| #72 | Chouteau | Pryor, OK | 5.8 TWh |
| #73 | Belews Creek | Belews Creek, NC | 8.0 TWh |
| #74 | Lake Road Generating Plant | Dayville, CT | 5.8 TWh |
| #75 | W S Lee | Williamston, SC | 5.8 TWh |
| #76 | Wolf Hollow II | Granbury, TX | 5.8 TWh |
| #77 | Santan | Gilbert, AZ | 5.8 TWh |
| #78 | Guadalupe Generating Station | Marion, TX | 5.7 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lake Side Power Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bartholomew | Springville, UT | 271.0 MWh | 17.6 mi |
| BYU Central Heating Plant | Provo, UT | 115.6 GWh | 8.1 mi |
| Copperton Solar Plant No. 1 | Bingham Canyon, UT | 648.0 MWh | 24.3 mi |
| Deer Creek (UT) | Heber, UT | 23.3 GWh | 12.9 mi |
| Granite | Salt lake City, UT | 5.2 GWh | 19.9 mi |
| Heber City | Heber City, UT | 27.6 GWh | 21 mi |
| Jordanelle Dam Hydroelectric Project | Heber, UT | 51.0 GWh | 25.2 mi |
| Little Cottonwood | Sandy, UT | 10.3 GWh | 17.7 mi |
| Murray Turbine | Murray, UT | 37.3 GWh | 24.4 mi |
| Nebo Power Station | Payson, UT | 875.1 GWh | 18.7 mi |
| Payson | Payson, UT | 4.0 MWh | 18.8 mi |
| Provo Power Plant | Provo, UT | 4.9 GWh | 7.8 mi |
| Snake Creek | Midway, UT | 5.6 GWh | 19.8 mi |
| Snowbird Power Plant | Snowbird, UT | 14.7 GWh | 18.2 mi |
| Spanish Fork | Spanish Fork, UT | 14.5 GWh | 19.1 mi |
| Spanish Fork Community Solar | Spanish Fork, UT | 7.3 GWh | 15.5 mi |
| Spanish Fork Wind Park 2 LLC | Spanish Fork, UT | 46.6 GWh | 20.1 mi |
| Stairs | Salt Lake City, UT | 3.2 GWh | 20.2 mi |
| Trans-Jordan Generating Station | South Jordan, UT | 36.5 GWh | 22.2 mi |
| Whitehead | Springville, UT | 11.3 GWh | 12.5 mi |