Whitehead
450 W. 600 N., Springville, UT 84663Plant Summary Information
Whitehead is ranked #17 out of 23 natural gas power plants in Utah in terms of total annual net electricity generation.
Whitehead is comprised of 7 generators and generated 2.9 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Whitehead |
|---|---|
| Utility Name | City of Springville - (UT) |
| Location | Utah County, UT |
| Initial Operation Date | August 1986 |
| Last Update | Dec 2025 |
| Annual Generation | 11.4 GWh |
| Annual Consumption | 137.5 k MMBtu |
| Ranked #6,032 out of 13,081 Power Plants Nationwide | |
| Ranked #1,532 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #68 out of 120 Utah Power Plants | |
| Ranked #17 out of 23 Utah Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 99.0% Distillate Fuel Oil : 1.0% |
Map of Whitehead
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Whitehead.
Monthly Net Generation for Whitehead
Monthly Plant Fuel Consumption for Whitehead
Whitehead Details
| Summary Information | |
|---|---|
| Plant Name | Whitehead (7028) |
| Plant Address | 450 W. 600 N., Springville, UT 84663 |
| Utility | City of Springville - (UT) (17845) |
| Latitude, Longitude | 40.1817, -111.6203 |
| Generation Dates on File | Jan 2001 to Dec 2025 |
| Initial Operation Date | August 1986 |
| Annual Generation | 11.4 GWh |
| Fuel Types | Natural Gas : 99.0% Distillate Fuel Oil : 1.0% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Springs |
| Ash Impoundment | No |
| Transmission / Distribution Owner | City of Springville - (UT) (17845) UT |
| Grid Voltage | 46.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | DOMINION ENERGY |
| Natural Gas Storage | No |
Generator K1 Details Operating October 1986
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 7 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 5.9 MW |
| Winter Capacity | 6.3 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 1986 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator K2 Details Operating August 1986
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 7 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 6 MW |
| Winter Capacity | 6.2 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 1986 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator K6CAT Details Operating December 2016
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 2.5 MW |
| Winter Capacity | 2.5 MW |
| Minimum Load | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2016 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Electric Utility (1) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator K7CAT Details Operating December 2016
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 2.5 MW |
| Winter Capacity | 2.5 MW |
| Minimum Load | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2016 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Electric Utility (1) |
| Topping Or Bottoming | T |
| Energy Source | Natural Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator K3CAT Details Operating July 2024
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 2.5 MW |
| Winter Capacity | 2.5 MW |
| Minimum Load | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 2024 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator K4CAT Details Operating July 2024
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 2.5 MW |
| Winter Capacity | 2.5 MW |
| Minimum Load | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2024 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator K5CAT Details Operating July 2024
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 2.5 MW |
| Winter Capacity | 2.5 MW |
| Minimum Load | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2024 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Whitehead Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1522 | CH Resources Beaver Falls | Beaver Falls, NY | 11.7 GWh |
| #1523 | Goal Line LP | Escondido, CA | 11.7 GWh |
| #1524 | Stuart (OK) | McAlester, OK | 11.7 GWh |
| #1525 | Towanda Facility | Wyalusing, PA | 11.7 GWh |
| #1526 | Cellu Tissue | East Hartford, CT | 11.7 GWh |
| #1527 | Trinity College Fuel Cell | Hartford, CT | 11.5 GWh |
| #1528 | Rokeby | Lincoln, NE | 13.3 GWh |
| #1529 | Overlook Medical Center | Summit, NJ | 11.4 GWh |
| #1530 | Middletown | Middletown, CT | 33.0 GWh |
| #1531 | Warren | Warren, PA | 11.4 GWh |
| #1533 | Bradley Energy Center | Windsor Locks, CT | 11.3 GWh |
| #1534 | Miramar Energy Facility | San Diego, CA | 11.3 GWh |
| #1535 | POET Biorefining - Jewell | Jewell, IA | 11.2 GWh |
| #1536 | Craig (CO) | Craig, CO | 3.2 TWh |
| #1537 | South District Wastewater Treatment Plt | Miami, FL | 20.6 GWh |
| #1538 | Archer Daniels Midland Lincoln | Lincoln, NE | 11.0 GWh |
| #1539 | POET Biorefining - Hudson | Hudson, SD | 10.9 GWh |
| #1540 | Kaiser Deer Valley Rd. Fuel Cell | Antioch, CA | 10.9 GWh |
| #1541 | Cutrale Citrus Juices USA I | Leesburg, FL | 10.9 GWh |
| #1542 | Red Hills Generating Facility | Ackerman, MS | 2.1 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Whitehead.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bartholomew | Springville, UT | 1.6 GWh | 6.5 mi |
| BYU Central Heating Plant | Provo, UT | 115.9 GWh | 4.7 mi |
| Clover Creek Solar Community Solar | Mona, UT | 197.9 GWh | 27.5 mi |
| Currant Creek | Mona, UT | 2.6 TWh | 28.8 mi |
| Deer Creek (UT) | Heber, UT | 22.2 GWh | 16.1 mi |
| Faraday Solar | Fairfield, UT | 1.0 TWh | 25.2 mi |
| Heber City | Heber City, UT | 16.5 GWh | 24.5 mi |
| Jordanelle Dam Hydroelectric Project | Heber, UT | 49.3 GWh | 30.5 mi |
| Lake Creek Dam | Heber City, UT | 3.1 GWh | 27 mi |
| Lake Side Power Plant | Vineyard, UT | 6.3 TWh | 12.5 mi |
| Little Cottonwood | Sandy, UT | 8.6 GWh | 29.4 mi |
| Nebo Power Station | Payson, UT | 622.1 GWh | 10.1 mi |
| Payson | Payson, UT | 6.0 MWh | 10.2 mi |
| Provo Power Plant | Provo, UT | 4.4 GWh | 4.8 mi |
| Snake Creek | Midway, UT | 3.8 GWh | 25.8 mi |
| Snowbird Power Plant | Snowbird, UT | 14.6 GWh | 27.8 mi |
| Spanish Fork | Spanish Fork, UT | 14.5 GWh | 7.1 mi |
| Spanish Fork Community Solar | Spanish Fork, UT | 7.4 GWh | 3.8 mi |
| Spanish Fork Wind Park 2 LLC | Spanish Fork, UT | 43.1 GWh | 7.9 mi |
| Stairs | Salt Lake City, UT | 4.1 GWh | 31.3 mi |